Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹3.5 L
Closing Date
18 Sept 2021, 4:30 pmClosed
xen rew kathua
xen rew kathua
Construction/Renovation of pond at Kalyal and Constt. Of bowli at Gurah Kalyal East pyt Gurah Kalyal East
2021_RDPR_137593_5
e-NIT No. 109 REW/K of 2021 Dated 03/09/2021
Open Tender
Civil Works
Item Rate
60 days
lohai malhar
as per sbd
3 documents required · 3 mandatory
₹500
Yes
xen rew kathua
Exempted
20 Oct 2021
3 Sept 2021
20 Sept 2021
4 Sept 2021
18 Sept 2021
4 Sept 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge
Disposal of Silt from site by means of MT
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected (1m from cutting edge)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4graded stone aggregate 20 mm nominal size)(Including all leads and lifts carriages of material by MT/HL)
Random Rubble masonry with hard stone in foundation and plinthincluding leveling up with cement concrete 1:6:12 (1 Cement : 6 coarsesand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete withCement mortar 1:6 (1 Cement : 6 coarse sand) including all lead, lift carriage.
Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns etc. for mass concrete
Pointing on stone work with cement mortar 1 : 3 (1 cement : 3 fine sand) Flush/Ruled Pointing
Dry stone pitching (any thickness) excluding cost of stones.On Slopes(Including all leads and lifts carriages of material by MT/HL)
Supply of stone including all lead, lift carriage.
Providing and fixing CIB of approved size by way of making foundation in M10, Brickwork in 1:6 cement mortar including plastering with 1:4 cement mortar, painting and writings as per the directions of engineer incharge including all carriages , supply , complete job.
TILAK RAJ
kuldeep kumar govt contractor
AJIT KUMAR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .