Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.5 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹28.1 L+₹61,960.72 (2.25%)Rejected-AOC VILL MAROPARA P O SANTIPUR P S BASUGAON DIST CHIRANG BTAD ASSAM | BASUGAON | CHIRANG | ASSAM | 783372 | L2 | Rejected-AOC Not Awarded | |
| 3 | L3₹30.8 L+₹3.3 L (11.9%)Rejected-AOC | L3 | Rejected-AOC Not Awarded | |
| 4 | Rejected-Technical B1 BLOCK II DIBANG RESIDENCY PENSIONPARA ROAD GUWAHATI 3 | KAMRUP METRO | ASSAM | 781001 | - | Rejected-Technical Not qualified | |
| 5 | Rejected-Technical | - | Rejected-Technical Not qualified |
Tender Value
₹31.9 L
EMD Value
₹63,880
Closing Date
10 Jun 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION
OFFICE OF THE DIRECTOR OF SOIL CONSERVATION, ASSAM BHUMI SHANGRAKHAN BHAWAN, R.G.B. ROAD, GUWAHATI-781005
MITIGATION OF FLASH FLOOD AT KRISHNA NAGAR (HILL SIDE), CHANDMARI,GUWAHATI DURING 2021-22
2022_SCD_25742_1
Tender/NIT/2021-22/1942
Open Tender
Civil Works
Item Rate
60 days
Guwahati
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹63,880
Yes
15 Jul 2022
26 May 2022
10 Jun 2022
27 May 2022
10 Jun 2022
27 May 2022
180 days
Amount
PART - A : CONSTRUCTION OF R.C.C. STEP DRAIN
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth, debris collection, burning and removal of them etc. works completed as directed.
Earth work in excavation of foundation trances of structure as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved materials. (i) In ordinary soil. (A) By manual means (Depth up to 3m) with dewatering.
Providing stone/brick soling in earthen shoulder with stone/ best quality jhamma brick, sand packed and laid to true line and level and in panel after preparing the subgrade including earthwork including all labour and materials and and if necessary dewatering etc. complete.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete.
Reinforced cement concrete in sub-structure complete as per drawing and technical specifications and steel shuttering.
Supplying, fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in substructure complete as per drawing and technical specifications.
Plastering with cement morter (1:3) on R.C.C. works as per technical specifications. Thickness of plastering =12 mm
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T & P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres. (I) By mannual means (B) Cement Concrete Grade M-15 & M-20
Plain/ Reinforced cement concrete in open foundation complete as per drawing and technical specifications.
Supplying, fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in substructure complete as per drawing and technical specifications.
Providing RCC singboard including engraved letter, colouring and fitting & fixing and supplying all necessary materials at the project site.
PART - B : CONSTRUCTION OF R.C.C. RETAINING WALL
Earth work in excavation of foundation trances of structure as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved materials. (i) In ordinary soil. (A) By manual means (Depth up to 3m) with dewatering.
Providing stone/brick soling in earthen shoulder with stone/ best quality jhamma brick, sand packed and laid to true line and level and in panel after preparing the subgrade including earthwork including all labour and materials and and if necessary dewatering etc. complete.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in foundation & compected by vibration including curing etc. complete.
Reinforced cement concrete in sub-structure complete as per drawing and technical specifications and steel shuttering.
Supplying, fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in substructure complete as per drawing and technical specifications.
Providing weep wholes in R.C.C. Retaining wall etc. with 100 mm dia and AC pipe extending through the full width of the structure with slope 2706 of IV:20 H towards drawing face etc. complete as per drawing and technical specification.
Plastering with cement morter (1:3) on R.C.C. works as per technical specifications. Thickness of plastering =12 mm
Earth filling works in the inner side of the Retaining Wall including all lifts and leads, trans-porting to site, spreading, grading to required slope, dressing etc. complete as directed.
Supplying, testing and installation of 100 cm wide woven jute geo textiles (JGT) 724 gm/ sq. m posseing tensile strength of 25kn/m (+10%,-5% tolerance) with a photometry around 150 to 400 microns and thickness 2 mm for appli-cation on road sub grades and embankments. Jute fabric to be laid with overlaps of 100mm crosswise and 300 mm longitudinally duly secured to sub grade by U shaped m. s. staples (11 gauge)/round head country nail of 150mm length at an interval of 750 mm as per direction of the engineer-in charge.
Local carriage of construction materials (Cement, Sand, Stone, TMT Bar etc.) from main road to the upper reach of work site as required.
Providing RCC singboard including engraved letter, colouring and fitting & fixing and suppl-ying all necessary materials at the project site.
PART - C : CONSTRUCTION OF Silt Pit
Earth work in excavation of foundation trances of structure as per drawing and technical speci-fication including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved materials. (i) In ordinary soil (A) By manual means (Depth up to 3m)
Sand filling in foundation trenches as per drawing and technical specifications.
Providing stone/brick soling in earthen shoulder with stone/ best quality jhamma brick, sand packed and laid to true line and level and in panel after preparing the subgrade including earthwork including all labour and materials and if necessary dewatering etc. complete.
Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggrete 40 mm nominal size mechanically mixed, place in found-ation & compected by vibration including curing etc. complete.
Reinforced cement concrete in sub-structure complete as per drawing and technical specifications and steel shuttering.
Supplying, fitting and placing TMT IS:1786 (Fe-500) bar reinforcement in substructure complete as per drawing and technical specifications.
Plastering with cement morter (1:3) on R.C.C. works as per technical specifications. Thickness of plastering =12 mm
Providing fitting and fixing RCC singboard.
SMTI. CHAMPA BASUMATARY
Jibon kishore Ray
stage.html
html • 0.05 MB
techsummary_39755.pdf
PDF • 1.32 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_39755.pdf
PDF • 3.05 MB
minutes1.pdf
PDF • 3.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .