| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.2 L+₹46,574.66 (17.1%)Admitted-Fee/PreQual/Technical/Finance CHENNAI 600 035 | CHENNAI | CHENNAI | TAMIL NADU | 600035 | ₹3.2 L+₹46,574.66 (17.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.3 L+₹55,294.21 (20.3%)Admitted-Fee/PreQual/Technical/Finance | ₹3.3 L+₹55,294.21 (20.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P.Manoharan L2 | C.Kumar L3 | SGK GROUPS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soils such as hard stiff clay, stiff black cotton hard red earth etc. with all leads and lifts including laying spreading, leveling sectioning, breaking clots etc. As per SS 20A open cutting other incidental charges etc. complete | 13 | m3 (One Cubic Metre) | 111 ₹1,443 Lowest | 111 ₹1,443 Lowest | 1,480 ₹19,240 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 13 | m3 (One Cubic Metre) | 1,908.5 ₹24,810.5 | 1,905 ₹24,765 | 1,240 ₹16,120 Lowest |
| 3.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 13 | m3 (One Cubic Metre) | 5,490.5 ₹71,376.5 | 5,490 ₹71,370 | 1,750 ₹22,750 Lowest |
| 4.00 | Provision for RCC precast post including all cost and conveyance of all materials and all other labour charges with necessary reinforcement etc., complete.as per Standard Specification | 84 | no (One Number) | 730 ₹61,320 | 730 ₹61,320 | 360 ₹30,240 Lowest |
| 5.00 | Supplying and fixing with new chain link (2”x2”) fencing in the existing available R.C.C. post including cost of chain link execution of R.C.C. Post binding wire etc., complete.as per Standard Specification | 270 | m2 (One Square Metre) | 160 ₹43,200 Lowest | 160 ₹43,200 Lowest | 340 ₹91,800 |
| 6.00 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary
soil.SS20B as directed by Departmental officers. | 107.1 | m3 (One Cubic Metre) | 205.5 ₹22,009.05 | 205 ₹21,955.5 | 110 ₹11,781 Lowest |
| 7.00 | Supply and delivery of HDPE PIPES PN-6. including cost and conveyance of all materils and labour charges etc. complete 90mm HDPE pipe | 170 | m (One Metre) | 205.4 ₹34,918 | 250 ₹42,500 | 120 ₹20,400 Lowest |
| 8.00 | Lowering HDPE pipes and specials to trench and
laying to proper grade and alignment and as
directed by the TWAD Officers 90mm HDPE pipe | 170 | m (One Metre) | 18.5 ₹3,145 | 18 ₹3,060 Lowest | 60 ₹10,200 |
| 9.00 | Supply and delivery of Following HDPE special Materials Including all Labour Charges etc., complete. 90mm HDPE Endcup | 5 | no (One Number) | 29.5 ₹147.5 Lowest | 29.5 ₹147.5 Lowest | 30 ₹150 |
| 10.00 | 90mm HDPE 90 Degree Bend | 5 | no (One Number) | 243 ₹1,215 | 243 ₹1,215 | 30 ₹150 Lowest |
Tender Value
₹3.5 L
EMD Value
₹3,500
Closing Date
18 Sept 2026, 3:00 pmClosed
The Commissioner
The Commissioner Jolarpet Municipality
Ward No-6 Rama Gounder Street Kudiyanakuppam SF No.266 and 267/2 Municipal Park Place 4 Side Fencing and Pipe line Works in Jolarpet Municipality
2026_MAWS_700405_1
597/2026/E1
Open Tender
Pipe Laying Works
Works
30 days
Jolarpet Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
18 Sept 2026
2 Sept 2026
18 Sept 2026
2 Sept 2026
18 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all clauses of soils such as hard stiff clay, stiff black cotton hard red earth etc. with all leads and lifts including laying spreading, leveling sectioning, breaking clots etc. As per SS 20A open cutting other incidental charges etc. complete | 13 | m3 (One Cubic Metre) | - | - |
| 2 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 13 | m3 (One Cubic Metre) | - | - |
| 3 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means | 13 | m3 (One Cubic Metre) | - | - |
| 4 | Provision for RCC precast post including all cost and conveyance of all materials and all other labour charges with necessary reinforcement etc., complete.as per Standard Specification | 84 | no (One Number) | - | - |
| 5 | Supplying and fixing with new chain link (2”x2”) fencing in the existing available R.C.C. post including cost of chain link execution of R.C.C. Post binding wire etc., complete.as per Standard Specification | 270 | m2 (One Square Metre) | - | - |
| 6 | Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils Sand, silt or other loose soil, wet sand or silt not under water light black cotton soil, sandy loam and ordinary
soil.SS20B as directed by Departmental officers. | 107.1 | m3 (One Cubic Metre) | - | - |
| 7 | Supply and delivery of HDPE PIPES PN-6. including cost and conveyance of all materils and labour charges etc. complete 90mm HDPE pipe | 170 | m (One Metre) | - | - |
| 8 | Lowering HDPE pipes and specials to trench and
laying to proper grade and alignment and as
directed by the TWAD Officers 90mm HDPE pipe | 170 | m (One Metre) | - | - |
| 9 | Supply and delivery of Following HDPE special Materials Including all Labour Charges etc., complete. 90mm HDPE Endcup | 5 | no (One Number) | - | - |
| 10 | 90mm HDPE 90 Degree Bend | 5 | no (One Number) | - | - |
stage.html
html • 0.02 MB
finance_841917.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_841917.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .