| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC CHINCHURIA MORE P O BAHULA DIST PASCHIM BARDHAMAN PIN 713322 W B | BAHULA | PASCHIM BARDHAMAN | WEST BENGAL | 713322 | 1 | Accepted-AOC Eligible L-1 Bidder | |
| 2 | 2₹2.8 L+₹21,037.04 (8.00%)Rejected-Finance KENDA KENDA KENDA BARDHAMAN 713342 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713342 | 2 | Rejected-Finance Quoted Rate more than L-1 Bidder | |
| 3 | 3₹3.2 L+₹58,690.84 (22.3%)Rejected-Finance VILL PO CHINCHURIA BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | 3 | Rejected-Finance Quoted Rate more than L-1 Bidder |
Tender Value
₹2.5 L
EMD Value
₹3,200
Closing Date
18 Feb 2025, 5:00 pmClosed
AE EnM
Sonepur Bazari Area
Repairing/rewinding of 01 no. 100 KVA, 11kV/433V and 01 no. 100 KVA, 3.3kV/415V distribution transformers under S. B. Area
2025_ECL_328225_1
GM/SBA/EnM/e-Tender/24-25/72
Open Tender
Electrical and Maintenance Works
Item Rate
21 days
Sonepur Bazari Area
Please refer tender documents.
5 documents required · 5 mandatory
₹3,200
26 Mar 2025
7 Feb 2025
20 Feb 2025
8 Feb 2025
18 Feb 2025
8 Feb 2025
8 Feb 2025 - 11 Feb 2025
Amount
Item Description/ Heading
Material Cost
Cleaning & decarburizing of secondary coil of the Transformer & insulation by manila paper.
Supply of DPC electrolyte grade copper conductor for primary coil.
Formation of coil after re-winding of primary & secondary coil including supply of required materials (Primary coil 125 kg+ secondary coil - 102 kg).
Cost of pre-compress board for separator & oil duct & placement.
Cost of wooden forma for formation of primary & secondary coil.
Providing gasket joints packing copper nuts, bolts etc. with materials.
Up & Down Transporting with loading & unloading charges.
Installation & Commissioning of 100KVA, 11KV/415Volt Transformer on existing position.
Less: Unused Old Scrap Value
Labour Cost:-
Cleaning & decarburizing of secondary coil of the Transformer & insulation by manila paper.
Formation of coil after re-winding of primary & secondary coil including supply of required materials (Primary coil 125 kg+ secondary coil - 102 kg).
Cost of pre-compress board for separator & oil duct & placement.
Providing gasket joints packing copper nuts, bolts etc. with materials.
Cleaning of core & tank & all other parts of transformer properly.
Cost of testing charges the transformer.
P. F. amount for labour cost
Total impact of GST for the purpose of CTC
BANERJEE CONCERN (BID ID -1126672)
JAY MAA DAL DALI KALI (BID ID -1126240)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_340254.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .