Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 CrAdmitted-Finance | -10.00% | ₹5.3 Cr | L1 | Admitted-Finance |
| 2 | L1₹5.3 CrAdmitted-Finance | -10.00% | ₹5.3 Cr | L1 | Admitted-Finance |
| 3 | L2₹6.2 Cr+₹89.0 L (16.7%)Admitted-Finance | +5.00% | ₹6.2 Cr+₹89.0 L (16.7%) | L2 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
29 May 2026, 2:00 pmClosed
Executive Engineer PWD RnB Nubra
Executive Engineer PWD RnB Nubra
Upgradation of Govt. Higher Secondary School Turtuk. (Under SDP)
2026_PWD_18936_1
08 of PWD RnB Nubra 2026-27
Open Tender
Civil Works - Buildings
Percentage
1095 days
Nubra
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
Executive Engineer PWD RnB Nubra.
₹11.9 L
29 Jul 2026
13 May 2026
1 Jun 2026
14 May 2026
29 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 415.58 | cum | 278.09 | ₹1,15,568.64 |
| 2 | Ordinary Rock | 63.56 | cum | 504.48 | ₹32,064.75 |
| 3 | Hard Rock (Blasting prohibited ) | 9.78 | cum | 1,216.02 | ₹11,892.68 |
| 4 | Earthwork in excavation by mechanical means
( Hydraulic excavator) over areas ( exceeding 1.5 mtr. In width as well as 10 sqm on plan ) including disposal of excavated earth, lead upto 50 m and lift upto 1.50 m , disposed earth to be level All kinds of soil : 85% | 657.56 | cum | 208.42 | ₹1,37,048.66 |
| 5 | Ordinary Rock | 77.36 | cum | 383.88 | ₹29,696.96 |
| 6 | Hard Rock (Blasting Prohibited) | 38.68 | cum | 1,095.42 | ₹42,370.85 |
| 7 | Dumping of stone including cost of stone including cost of stone ( on horizontal | 139.98 | cum | 573.22 | ₹80,239.34 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 80.96 | cum | 5,725.33 | ₹4,63,522.72 |
| 9 | Random Rubble masonry with hard stone in foundation and plinth
including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse
sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and
curing complete with:
Cement mortar 1:6 (1 Cement : 6 coarse sand) | 365.54 | cum | 5,730.38 | ₹20,94,683.11 |
| 10 | Providing & fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position in cement mortar 1:3 (1cement:3 coarse sand), cost of required centring, shuttering and curing complete 1:3:6 (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20 mm nominal
size) | 1 | cum | 14,111.48 | ₹14,097.37 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_45236.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .