Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC HOUSE NO 11 81 KRISHNA NAGAR KANPUR | KANPUR | UTTAR PRADESH | ₹8.4 L Quoted ₹9.9 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹9.9 LSame as L1Rejected-Finance | ₹9.9 LSame as L1 | L2 | Rejected-Finance L2 |
Tender Value
₹10.0 L
EMD Value
₹99,712
Closing Date
25 Mar 2026, 3:00 pmClosed
CHIEF ENGINEER, KMC
Motijheel
Renovation of rubish dump in Ward 58 Undar Zone 02
2026_NNKAN_1128053_1
1367/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
zone 2
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,712
21 Jul 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
25 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of RCC or reinforcment brik work including stacking of material etc all complete work. | 0.16 | sqm | - | - |
| 2 | Dismenteling of brick including stacking of dismentled material etc all complete work. | 0.87 | Cum | - | - |
| 3Dismenteling of cc floor including stacking of dismentled material etc all complete work | |||||
| 4Dismenteling of door window including stacking of dismentled material etc all complete work. (Store at dump) | |||||
| 5Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | |||||
| 6 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 1 | sqm | - | - |
| 7 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | 0.03 | cum | - | - |
| 8 | Sale of materials bricks bats with all completion | 0.5 | cum | - | - |
| 9 | RCC Work with Cement concrete 1:1.5:3, 1 Cement:1.5 coarse sand:3 stone Agregate incuding all completion of work | 0.6 | cum | - | - |
| 10 | Mild Steel or Iron in Reinforcement including all completion of work. | 0.62 | qtls | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.77 MB
BOQ_2103910.xls
BOQ • 0.28 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .