Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance EKLEHARA COLONY PO EKLEHARA DISTT CHHINDWARA M P | L1 | Admitted-Finance | ||
| 2 | L2₹1.2 Cr+₹2.1 L (1.77%)Admitted-Finance PO JATACHHPAR TAH PARASIA DISTT CHHINDWARA | PARASIA | CHHINDWARA | MADHYA PRADESH | 480449 | L2 | Admitted-Finance | ||
| 3 | L3₹1.2 Cr+₹3.0 L (2.50%)Admitted-Finance 56 89 WARD NO 17 PARASIA POST PARASIA DISTRICT CHHINDWARA M P | PARASIA | CHHINDWARA | MADHYA PRADESH | L3 | Admitted-Finance | ||
| 4 | L4₹1.4 Cr+₹22.1 L (18.3%)Admitted-Finance FAUJI GALI MAIN ROAD BISRAMPUR PIN 497226 C G | BISRAMPUR | KOREA | CHHATTISGARH | 497226 | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical As per TCR |
Tender Value
₹1.9 Cr
EMD Value
₹2.4 L
Closing Date
12 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil), Pench Area
Staff Officer (Civil), AGM Office, Pench Area, P.O. Parasia, Dist. Chhindwara (M.P.) 480441
Development and Upliftment of PV Colony, Jhurrey and AV Colony, Bhokai including Paver Block Laying, Exterior Painting and Allied Works under Nehariya Sub Area of Pench Area.
2026_WCL_364424_1
pe3350-civ-s-e033-2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
NEHARIYA SUB AREA
As Per NIT
5 documents required · 5 mandatory
₹2.4 L
20 Nov 2026
27 Aug 2026
14 Sept 2026
27 Aug 2026
12 Sept 2026
28 Aug 2026
27 Aug 2026 - 5 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in- equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil | 2,800 | Sqm | 19.1 | ₹53,480 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 280 | Cum | 110.55 | ₹30,954 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 10 | Cum | 188.5 | ₹1,885 |
| 4 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar | 60 | Cum | 1,153.7 | ₹69,222 |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1,200 | Sqm | 30.9 | ₹37,080 |
| 6 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand) | 1,200 | Sqm | 223.25 | ₹2,67,900 |
| 7 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 1,200 | Sqm | 216.4 | ₹2,59,680 |
| 8 | 6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand) | 240 | Sqm | 197.2 | ₹47,328 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 10 | Cum | 5,052.05 | ₹50,520.5 |
| 10 | White washing with lime to give an even shade : Old work (one or more coats) | 13,980 | Sqm | 8.8 | ₹1,23,024 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_377337.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .