| 1 | L1₹156.5 CrAccepted-AOC THIRD FLOOR AMIT CRYSTAL SENAPATI BAPAT ROAD PUNE 411 016 | PUNE | PUNE | MAHARASHTRA | 411016 | ₹156.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹159.9 CrRejected-AOC HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | ₹159.9 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹150.5 Cr
EMD Value
₹75.3 L
Closing Date
2 Mar 2023, 6:00 pmClosed
Executive Engineer Public Work(East)Division Pune
Executive Engineer Public Work(East)Division Pune
CONSTRUCTION OF 100 STUDENT GOVERNMENT AYURVEDIC COLLEGE AND 100 BEDDED HOSPITAL BUILDING AT MEDAD,TALUKA BARAMATI, DISTRICT PUNE.
2023_PWDRP_868562_1
E Tender Notice No.71 for 2022-2023
Open Tender
Civil Works - Buildings
730 days
BARAMATI
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
₹75.3 L
Chief Engineer, P. W. Region Office, Pune
11 Apr 2023
1 Feb 2023
6 Mar 2023
1 Feb 2023
2 Mar 2023
1 Feb 2023
1 Feb 2023 - 14 Feb 2023
14 Feb 2023
Amount
Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete.
Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means
Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means
Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 3.0 m to 4.5 m) By Mechanical Means
Dewatering on BHP basis by using water pump including diversion of stream, providing cofferdams, earthern bunds etc. as may be necessary for foundation and other parts of the the works and pumping out water during and after excavation as may be required by using 3.0 BHP pump etc. complete. (prior approval of Superintending Engineer will be necessary)
Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 1.0 percent of clorophyrifos per One Square Metre of surface area covering ten years guarantee on bond paper.Ground Floor
Providing and laying cast in situ / Ready Mix Cement Concrete M-30 for bored piles each of load capacity and as per design and of 325 mm diameter or as directed placed through steel shells sunk to the required depth through all strata except rock excluding provision of reinforcement as per detailed drawings and design approved by the Engineer-in- charge including placing with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) by concrete prepared by tremie arrangement, compaction of concrete including chipping and dressing etc. complete. concrete by tremie arrangements, compaction of concrete including chipping and dressing and withdrawal of shell etc. complete. (Excluding steel reinforcement)
Providing and laying cast in situ / Ready Mix Cement Concrete M-30 for bored piles each of load capacity and as per design and of 400 mm diameter.or as directed placed through steel shells sunk to the required depth through all strata except rock excluding provision of reinforcement as per detailed drawings and design approved by the Engineer-in- charge including placing with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) by tremie arrangements, compaction of concrete including chipping and dressing and withdrawal of shell etc. complete. (Excluding steel reinforcement)
Providing and laying cast in situ / Ready Mix Cement Concrete M-30 for bored piles each of load capacity and as per design and of 500mm diameter or as directed placed through steel shells sunk to the required depth through all strata except rock excluding provision of reinforcement as per detailed drawings and design approved by the Engineer-in- charge including placing with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) by tremie arrangements, compaction of concrete including chipping and dressing and withdrawal of shell etc. complete. (Excluding steel reinforcement)
Providing and laying cast in situ / Ready Mix Cement Concrete M-30 for bored piles each of load capacity and as per design and of 600 mm diameter or as directed placed through steel shells sunk to the required depth through all strata except rock excluding provision of reinforcement as per detailed drawings and design approved by the Engineer-in- charge including placing with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) by tremie arrangements, compaction of concrete including chipping and dressing and withdrawal of shell etc. complete. (Excluding steel reinforcement)
Providing placing and Driving in position 6 millimeter mild steel liner for R.C.C. Piles upto required depth with 12mm thick mild steel cutting edge of 0.50m length at bottom including fabricating cutting the mild steel sheet to required diameter and shape ,welding the joints and driving with the help of required machineries including all materials labours and lifts etc. complete as directed by the Engineer in charge. Spec :(As directed by Engineer in Charge From 3.00 to 9.50 meter deep liner
Chiseling through pile shells in hard strata like boulders, soft and hard rocks Upto and inclusive of 550 mm diameter including removing and stacking the loose materials etc. complete and disposing of the unserviceable materials outside complete.
Chiseling through pile shells in hard strata like boulders, soft and hard rocks Beyond 550 mm and upto and inclusive of 750 mm dia. including removing and stacking the loose materials etc. complete and disposing of the unserviceable materials outside complete.
Carrying out load test for 1.5 times the proposed safe working load on the pile in driven position upto 400 mm diameter including construction of test cap, use of accessories and instruments including providing graphs as per I.S. code or Std.Specifications and dismantling the test cap after testing and cleaning the site complete.
Carrying out load test for 1.5 times the proposed safe working load on the pile in driven position above 400 mm and upto to 550 mm diameter including construction of test cap, use of accessories and instruments including providing graphs as per I.S. code or Std.Specifications and dismantling the test cap after testing and cleaning the site complete.
Carrying out load test for 1.5 times the proposed safe working load on the pile in driven position above 550 mm and upto 650 mm diameter including construction of test cap, use of accessories and instruments including providing graphs as per I.S. code or Std.Specifications and dismantling the test cap after testing and cleaning the site complete.
Empty boring for 325 to 400 mm dia bored R.C.C. cast in situ piles including withdrawal of shell, removal of earth to a distance of 50 metres etc. complete. Spec :(As directed by Engineer in Charge)
Empty boring for 425 to 500 mm dia. bored R.C.C. cast in situ piles including withdrawal of shell, removal of earth to a distance of 50 metres etc. complete. Spec :(As directed by Engineer in Charge)
Empty boring for 525 to 600 milimetre diameter bored Reinforced Cement Concrete cast in situ piles including withdrawal of shell, removal of earth to a distance of 50 metres etc. complete.
Chipping and dressing of the R.C.C. piles upto 0.60 meterincluding cleaning reinforcement and removal of dismantled materials upto a distance of 50 meter beyond the building area etc. for providing pile caps.Spec :(As directed by Engineer in Charge
Providing bentonite slurry process for various diameter of piles vide Item Nos 1 (i to xxiv) above. Spec : (As directed by Engineer in Charge)
Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Third Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Fourth Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
TerraceProviding and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Above terraceProviding and laying Cast in situ/Ready Mix cement concrete in M-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, Steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete.
Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap metal for R.C.C. pile caps as per detailed designs and drawings, including bailing out water manually, centering, formwork, laying/ pumping, compacting, finishing and curing etc. with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade) complete.(Excluding steel reinforcement)
Lower ground Floor to Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. work in foundations like raft, strip foundations, grillage and footings of R.C.C. columns and steel stanchions etc. columns as per detailed designs and drawing or as directed including Steel centering formwork, cover blocks laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Pilecap to Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Ground to First Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First to Second Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor to thirdProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace hospitalProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Above terraceProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. pardi of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Pilecap to Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Ground to First Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First to Second Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor to third/ terrace HospitalProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace to roofProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Third to fourth Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
fourth to terraceProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite /quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawing or as directed including steel centering, formwork,cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel). with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace hospitalProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Roof levelProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
thirdProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
fourth Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace Floor HostelProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Above terraceProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap / granite/quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace hospitalProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Roof level hospitalProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
thirdProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
fourth Floor Providing and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace Floor HostelProviding and laying Cast in situ/Ready Mix cement concrete M-30 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Ground Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
First Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Second Floor Providing and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace hospitalProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
ThirdProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
FourthProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Terrace HostelProviding and laying Cast in situ/Ready Mix cement concrete in M-30 of trap/ granite/ quartzite/ gneiss metal for R.C.C. staircase of required thickness including steel centering, formwork, cover blocks, laying/pumping, compacting and roughening them if special finish is to be provided and curing complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Pilecap level Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Ground Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
First Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Second Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Terrace hospitalProviding and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Roof level hospitalProviding and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Third Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Fourth Floor Providing and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Terrace HostelProviding and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Above terrace HostelProviding and fixing in position TMT - FE - 500 bar reinforcement of various diameters forR.C.C. pile caps, footings, foundations, slabs, beams columns, canopies, staircase, newels, chajjas, lintels pardis, copings, fins, arches etc. as per detailed designs, drawings and schedules. including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required complete.
Ground Floor Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
First Floor Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
Second Floor Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
third Floor Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
fourth Floor Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
terrace Providing Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
Above terraceProviding Wire Cut Brick masonry with conventional/ 1.S. type bricks size (230mm X 100mm X 55mm) in cement mortar 1:6 in superstructure with 12mm mortar joint Thickness with regular BBM including striking joints, watering racking out joints, and scaffolding Complete.
Ground Floor Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
First Floor Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
Second Floor Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
third Floor Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
fourth Floor Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
terrace Providing Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
Above terraceProviding Recessed pointing with Red cement mortar 1:3 for stone/ Brick masonry including scaffolding and Curing etc. complete
Ground Floor Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete
First Floor Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete
Second Floor Providing second class Burnt Brick masonry with conventional/ I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete
Ground Floor Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete.
First Floor Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete.
Second Floor Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete.
Terrace Floor Providing cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete.
Terrace Floor HostelProviding cement based water proofing treatment to terraces (Indian water proofing or alike) with brick bats laid in required slope to drain the water for any span after cleaning the base surface. Applying a coat of cement slurry admixed with approved water proofing compound and laying the brick bats on bottom layer in C.M.1:5 admixed with approved water proofing compound filling up to half depth of brick bats, curing this layer for 3 days, applying cement slurry over this layer joints of brick bats with C.M.1:3 admixed with approved water proofing compound and finally top finishing with average 20 mm. thick layers of same mortar added with jute fiber at 1Kilogramper bag including finishing the surface smooth with cement slurry admixed with approved water proofing compound. Marking finished surface with false squares of 300mm x 300 mm. making the junctions at the parapet rounded and tapered top for required height, with drip mould at the junction of plaster and parapet and curing and covering 10 years Guarantee against leakproofness on Court fee stamp paper of Rs. 500/- including ponding test etc. complete.
Ground Floor Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
First Floor Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Second Floor Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Terrace Floor hospitalProviding Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Third Floor Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Fourth Floor Providing Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Terrace Floor hostelProviding Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Above terrace HostelProviding Autoclaved Aerated Concrete Block masonary of conforming to IS:2185 (Part 3) - 1984 in extra fine jointing mortar of fixoblock of UltraTech or equivalent in superstructure including striking joints, raking out joints and scaffolding etc. Complete. (The test shall be carried out conforming to IS:6441 (Part I) - 1972)
Ground Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
First Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Second Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
TerraceProviding and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Third Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Fourth Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Terrace Floor Providing and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Above terraceProviding and fixing chicken mesh of 22 gauge, with about 30 cm. width at the junction of R.C.C members and brick work, of approved quality including fixing mesh in position by necessary drilling in concrete /B.B.masonry and or tying by binding wire etc. complete.
Ground Floor Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
First Floor Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Second Floor Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Terrace Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Third Floor Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Fourth Floor Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Terrace Floor (Hostel)Providing and applying gypsum plaster ( with Gypsum material ) with finishing with gypsum material in 10 to 13 millimeter thickness to previously plastered surface / or on newly brick surface ( Excluding rough cast plaster ) in all position including preparing and Finishing the surface scaffolding etc.complete.
Ground Floor Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
First Floor Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
Second Floor Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
Third Floor Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
Fourth Floor Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
Terrace Providing and applying Two coats of wall care Putty of 2 mm. thickness for plastered surface and 5-6 mm. thickness finished concrete surface to Ceiling and Walls to prepare surface even and smooth of Brands BIRLA WHITE, BERGER, BISION, J.K., make, etc. complete for plastered walls/ ceiling 2 mm.
Ground Floor Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
First Floor Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Second Floor Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Third Floor Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Fourth Floor Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Terrace Providing sand faced plaster externally in cement mortar using approved screened sand, in all positions including base coat of 15 mm thick in cement mortar 1:4 using waterproofing compound at 1Kilogramper cement bag curing the same for not less than 2 days and keeping the surface of the base coat rough to receive the sand faced treatment 6 to 8 mm thick in cement mortar 1:4 finishing the surface by taking out grains and curing for fourteen days scaffolding etc.complete.
Ground Floor Providing and applying Texture plaster with finishing with texture material of approved make in 3 to 4 millimeter thickness on previously plastered surface, including Plaster Groove 6mm thickness or Tape Grooves 35 to 45 mm thickness or as required, in all position including preparing the surface, scaffolding etc. complete.
Ground Floor Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete.
First Floor Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete.
Second Floor Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete.
Third Floor Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete.
Fourth Floor Providing waterproofing in W.C. and bath including brick bat coba in all position including providing and laying 12mm bedding in cement mortor 1:3 on vergin concrete slab with waterproofing compound @ 1Kilogram/per bag of cement laying brick bat coba of required thickness in cm 1:5 with waterproofing compound 1 Kilogram/bag of cement grouting and finishing the top layer with 20mm thick brick bedding in cm mortor 1:3 with waterproofing compound 1 Kilogram/per bag of cement and testing the treated portion for 48 hours by pond test and covering ten years' guarantee on requisite stamp paper including curing etc. complete.
Ground Floor Providing and Filling in sunk portion W.C., bath or any by broken AAC Block in all position as instruction from Engineer Incharge.
First Floor Providing and Filling in sunk portion W.C., bath or any by broken AAC Block in all position as instruction from Engineer Incharge.
Second Floor Providing and Filling in sunk portion W.C., bath or any by broken AAC Block in all position as instruction from Engineer Incharge.
Third Floor Providing and Filling in sunk portion W.C., bath or any by broken AAC Block in all position as instruction from Engineer Incharge.
Fourth Floor Providing and Filling in sunk portion W.C., bath or any by broken AAC Block in all position as instruction from Engineer Incharge.
Ground Floor Providing and laying in position Floor ing of Sadarahalli granite stone with border Z black granite, size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete.
First Floor Providing and laying in position Floor ing of Sadarahalli granite stone with border Z black granite, size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete.
Second Floor Providing and laying in position Floor ing of Sadarahalli granite stone with border Z black granite, size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete.
Third Floor Providing and laying in position Floor ing of Sadarahalli granite stone with border Z black granite, size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete.
Fourth Floor Providing and laying in position Floor ing of Sadarahalli granite stone with border Z black granite, size 18 mm to 20 mm thick on bed 1:6 cement mortar including cement floats striking joints, pointing in C.M. 1:3 curing and cleaning etc. complete.
Ground Floor Providing leather finished polishing to Granite Stone slab by continuous grinding in 4 coats of different bits to receive rough and matt finish including buffing process before laying and fixing of stone as per drawing and design, including cleaning, washing and finishing etc. complete.
Ground Floor - Floor ingProviding and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for Floor ing in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete.
First Floor Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for Floor ing in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete.
Second Floor Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for Floor ing in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete.
Third Floor Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for Floor ing in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete.
Fourth Floor Providing and laying vitrified matt fininsh tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for Floor ing in required position laid on a bed of 1:4 cement morar including neat cement float, filling joints, curing and cleaning etc. complete.
Ground Floor -Toilet Floor ingProviding and laying Antiskid Ceramic tiles of approved quality of size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid Floor ing in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
First Floor Providing and laying Antiskid Ceramic tiles of approved quality of size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid Floor ing in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
Second Floor Providing and laying Antiskid Ceramic tiles of approved quality of size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid Floor ing in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
Third Floor Providing and laying Antiskid Ceramic tiles of approved quality of size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid Floor ing in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
Fourth Floor Providing and laying Antiskid Ceramic tiles of approved quality of size 30 cm x 30 cm and confirming to IS 15622-2006 (Group-B IIA) for antiskid Floor ing in required position laid on a bed of 1:4 cement mortar including cement float, filling joint with cement slurry cleaning curing etc. complete.
Ground Floor - Dado & SkirtingProviding and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete.
First Floor Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete.
Second Floor Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete.
Third Floor Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete.
Fourth Floor Providing and laying vitrified matt finish tiles having size 590 mm to 605 mm x to 605 mm of 8 to 10 mm thickness and confirming IS. 15622-2006 (Group Bla) of approved make, shade and pattern for dado and skirting in required position fixed in 1:4 cement mortar including neat cement float, filling joints, curing and cleaning etc. complete.
Ground Floor Supply & Fixing of Rock/ Stone Finished Full Body Vitrifid Steptiles with thick Bullnose for Ready to install Treads and Risers, 16 mm thick and of required width in plain pattern including Cement float, filling joints, with neat cement slurry, Natural sand, curing and cleaning complete. with prior approval of concerned Superitending Engineer
First Floor Supply & Fixing of Rock/ Stone Finished Full Body Vitrifid Steptiles with thick Bullnose for Ready to install Treads and Risers, 16 mm thick and of required width in plain pattern including Cement float, filling joints, with neat cement slurry, Natural sand, curing and cleaning complete. with prior approval of concerned Superitending Engineer
Second Floor Supply & Fixing of Rock/ Stone Finished Full Body Vitrifid Steptiles with thick Bullnose for Ready to install Treads and Risers, 16 mm thick and of required width in plain pattern including Cement float, filling joints, with neat cement slurry, Natural sand, curing and cleaning complete. with prior approval of concerned Superitending Engineer
Third Floor Supply & Fixing of Rock/ Stone Finished Full Body Vitrifid Steptiles with thick Bullnose for Ready to install Treads and Risers, 16 mm thick and of required width in plain pattern including Cement float, filling joints, with neat cement slurry, Natural sand, curing and cleaning complete. with prior approval of concerned Superitending Engineer
Fourth Floor Supply & Fixing of Rock/ Stone Finished Full Body Vitrifid Steptiles with thick Bullnose for Ready to install Treads and Risers, 16 mm thick and of required width in plain pattern including Cement float, filling joints, with neat cement slurry, Natural sand, curing and cleaning complete. with prior approval of concerned Superitending Engineer
Ground Floor Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish
First Floor Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish
Second Floor Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish
Third Floor Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish
Fourth Floor Providing and fixing machine cut mirror polished 18 mm to 20 mm thick telephone black granite / Amba White / Cat bary brown / RBI red / Ocean Brown granite stone partition with full moulding the edges etc. complete . Both side polish
Ground Floor Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab colour black, Cherry/Ruby red
First Floor Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab colour black, Cherry/Ruby red
Second Floor Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab colour black, Cherry/Ruby red
Third Floor Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab colour black, Cherry/Ruby red
Fourth Floor Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab colour black, Cherry/Ruby red
Ground Floor Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
First Floor Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
Second Floor Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
Third Floor Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
Fourth Floor Providing sills of required material 20mm to 25mm thick, on a bed of cement mortar 1:4 including cement float, filling joints with neat cement slurry, curing, moulding edges, polishing,cleaning complete. b) Granite
Ground Floor Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete.
First Floor Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete.
Second Floor Providing and laying telephone black / Amba White / Cadburybrown / Ruby red / Ocean Brown granite stone of 18 to 20 mm thick for door frame/ dado/ window boxing etc. On C.M. 1:6 including filling joints with polymer base filler nosing/moulding the sharp edges wherever necessary, curing, etc. complete.
Providing and applying two coats of textured synthetic paint of approved shade and quality and one coat of primer before applying textured paint including scaffolding if necessary preparing surface by thoroughly cleaning oil, grease, dirt and other materials as required, etc. complete.
Ground Floor Providing and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
First Floor Providing and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
Second Floor Providing and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
Third Floor Providing and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
Fourth Floor Providing and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
TerraceProviding and applying impression 24 carrat Luxury paint of approved make & approved brand Emulsion paint to interior walls and ceilings of approved quality, colour and shade to new surface in two coats, including sub surface prparation by Acrylic putty and Acrylic primer coats including scaffolding, preparing the surface. etc. complete (Low VOC).
First Floor Providing and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively, VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifitions and as approved by engineer in charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc, washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge.
Second Floor Providing and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively, VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifitions and as approved by engineer in charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc, washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge.
TerraceProviding and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively, VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifitions and as approved by engineer in charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc, washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge.
Terrace HostelProviding and applying two coats of High Albedo paint having minimum Solar Reflective Index (SRI) 108 (with solar reflectance & thermal emittance tested as per ASTM) C 1549 and ASTM C 1371 respectively, VOC less than 10 cc/gm. The coating thickness and the methodology of application shall strctly as per manufacturer's specifitions and as approved by engineer in charge. Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc, washing with water all complete.The contractor shall give guarantee for the performance of SRI and also the durabitity of coating, all complete as per direction of Engineer - in- incharge.
Ground Floor Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
First Floor Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
Second Floor Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
Third Floor Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
Fourth Floor Providing and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
TerraceProviding and applying two coats Apex Ultima Puranature Anti-Pollution Or equivalent approved brand, paint should decomposes organic substances and inorganic gases(NOx, VOC’s, CO, SOx, formaldehydes, etc.) in presence of natural or artificial light. It contains Graphene and nanoparticles of titanium oxide. and Absorbs CO2 (4.8 Kilogram/15 l). plaster crack should be filled by Acrylic base Crack seal/Textured Crack filler, Paint has to applied on one coat of Apex Ultima Puranature Anti-Pollution Primer or Equivalent. Warranty Should be given by the Manufaturer The work should be done by the Manufacturer Recommended applicator and he should be able to furnish stage wise onsite technical reports from the concerned company technologist.
Ground Floor - ToiletProviding and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.products approved as per GRIHA and BS 476 etc. complete.
First Floor Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.products approved as per GRIHA and BS 476 etc. complete.
Second Floor Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.products approved as per GRIHA and BS 476 etc. complete.
Third Floor Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.products approved as per GRIHA and BS 476 etc. complete.
Fourth Floor Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.Providing and Fixing of GI Lay in Plain metal ceiling consisting of 600x600mm Lay in tiles of pre coated galvanized steel in 0.5 mm thickness in Global white color tile to be laid on grid systems with 15mm wide T - section flanges color white having rotary stitching on the Main Runner, 1200 mm and 600 mm Cross Tees.products approved as per GRIHA and BS 476 etc. complete.
Ground Floor Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete.
First Floor Providing and fixing in position Gypsum board false ceiling with 12.5 mm thick Gypsum boards, screwed/fixed to the under structure of suspended G.I. Grid constructed and suspended from the main ceiling consisting of ceiling sections of size 25 x 50 mm maximum center to center distance of 600 milimetre perimeter channel and intermediate channels at maximum center to center distance 1200 milimetre galvanized grid should be fixed to reinforced cement concrete slab. The gypsum board should be fixed to galvanized iron grid with necessary screws. The boards should be taped and filled from underside to give smooth, seamless ceiling. The rate should include necessary additional ceiling sections and intermediate channels. Additional intermediate channels should be fixed to strap hangers for additional support to prevent strapping at every 1200 milimetre item to be completed in all respect including necessary sleeves for ducts finishing of joints cut outs, painting including labour, material, lifts etc. all complete.
Ground Floor Providing and fixing superior quality factory made phenol bonded solid core single leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer on external face with three coats of french polish and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame without fanlight including, approved fixtures and fastening hooks, eyes, screws and painting the frame and interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. R2-CS-WW-16-c 35mm thick shutter
First Floor Providing and fixing superior quality factory made phenol bonded solid core single leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer on external face with three coats of french polish and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame without fanlight including, approved fixtures and fastening hooks, eyes, screws and painting the frame and interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. R2-CS-WW-16-c 35mm thick shutter
Second Floor Providing and fixing superior quality factory made phenol bonded solid core single leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer on external face with three coats of french polish and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame without fanlight including, approved fixtures and fastening hooks, eyes, screws and painting the frame and interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. R2-CS-WW-16-c 35mm thick shutter
Third Floor Providing and fixing superior quality factory made phenol bonded solid core single leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer on external face with three coats of french polish and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame without fanlight including, approved fixtures and fastening hooks, eyes, screws and painting the frame and interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. R2-CS-WW-16-c 35mm thick shutter
Fourth Floor Providing and fixing superior quality factory made phenol bonded solid core single leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer on external face with three coats of french polish and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame without fanlight including, approved fixtures and fastening hooks, eyes, screws and painting the frame and interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. R2-CS-WW-16-c 35mm thick shutter
Ground Floor Providing and Fixing 30 MM thick both side Prelaminated Solid Panel P.V.C. Door Shutter consisting of frame made out of M.S. tubes of 19 guage thickness and, size 19 x 19 mm. for styles and 15 x15 mm. for the top and bottom rails, M.S. frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC ' C ' channel made from 5 mm. (+/- 0.25) thick prelaminated sheet of density 600 kg/cbm, of size 30 mm. thickness 70 mm. width out of which 50 mm. shall be flat and 20 mm shall be tapered in 45 degree angle on either side forming stiles and 5 mm. thick, 95 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/- 0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/- 0.25) thick P.V.C. sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm. (+/- 0.25) x 30 mm. P.V.C. sheet beading on either side and joined together with solvent cement adhesive etc., 10 mm. thickness (5 mm. (+/- 0.25) x 2 nos. ) 20 mm. wide cross P.V.C. sheet as gap insert for the rail and bottom rail. Door to be fixed to frames with 3 nos M.S. powder coated but hinges of size 100 mm. x 25 mm. x 2 mm. using 32 mm. long steel screws drilled suitable to pass through both the walls of the M.S. tube. Other hardwares should be fixed with 19 x 6 mm. size steel screws including fixture fasting complete as per direction of Engineer -in -charge. .
First Floor Providing and Fixing 30 MM thick both side Prelaminated Solid Panel P.V.C. Door Shutter consisting of frame made out of M.S. tubes of 19 guage thickness and, size 19 x 19 mm. for styles and 15 x15 mm. for the top and bottom rails, M.S. frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC ' C ' channel made from 5 mm. (+/- 0.25) thick prelaminated sheet of density 600 kg/cbm, of size 30 mm. thickness 70 mm. width out of which 50 mm. shall be flat and 20 mm shall be tapered in 45 degree angle on either side forming stiles and 5 mm. thick, 95 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/- 0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/- 0.25) thick P.V.C. sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm. (+/- 0.25) x 30 mm. P.V.C. sheet beading on either side and joined together with solvent cement adhesive etc., 10 mm. thickness (5 mm. (+/- 0.25) x 2 nos. ) 20 mm. wide cross P.V.C. sheet as gap insert for the rail and bottom rail. Door to be fixed to frames with 3 nos M.S. powder coated but hinges of size 100 mm. x 25 mm. x 2 mm. using 32 mm. long steel screws drilled suitable to pass through both the walls of the M.S. tube. Other hardwares should be fixed with 19 x 6 mm. size steel screws including fixture fasting complete as per direction of Engineer -in -charge. .
Second Floor Providing and Fixing 30 MM thick both side Prelaminated Solid Panel P.V.C. Door Shutter consisting of frame made out of M.S. tubes of 19 guage thickness and, size 19 x 19 mm. for styles and 15 x15 mm. for the top and bottom rails, M.S. frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC ' C ' channel made from 5 mm. (+/- 0.25) thick prelaminated sheet of density 600 kg/cbm, of size 30 mm. thickness 70 mm. width out of which 50 mm. shall be flat and 20 mm shall be tapered in 45 degree angle on either side forming stiles and 5 mm. thick, 95 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/- 0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/- 0.25) thick P.V.C. sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm. (+/- 0.25) x 30 mm. P.V.C. sheet beading on either side and joined together with solvent cement adhesive etc., 10 mm. thickness (5 mm. (+/- 0.25) x 2 nos. ) 20 mm. wide cross P.V.C. sheet as gap insert for the rail and bottom rail. Door to be fixed to frames with 3 nos M.S. powder coated but hinges of size 100 mm. x 25 mm. x 2 mm. using 32 mm. long steel screws drilled suitable to pass through both the walls of the M.S. tube. Other hardwares should be fixed with 19 x 6 mm. size steel screws including fixture fasting complete as per direction of Engineer -in -charge. .
Third Floor Providing and Fixing 30 MM thick both side Prelaminated Solid Panel P.V.C. Door Shutter consisting of frame made out of M.S. tubes of 19 guage thickness and, size 19 x 19 mm. for styles and 15 x15 mm. for the top and bottom rails, M.S. frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC ' C ' channel made from 5 mm. (+/- 0.25) thick prelaminated sheet of density 600 kg/cbm, of size 30 mm. thickness 70 mm. width out of which 50 mm. shall be flat and 20 mm shall be tapered in 45 degree angle on either side forming stiles and 5 mm. thick, 95 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/- 0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/- 0.25) thick P.V.C. sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm. (+/- 0.25) x 30 mm. P.V.C. sheet beading on either side and joined together with solvent cement adhesive etc., 10 mm. thickness (5 mm. (+/- 0.25) x 2 nos. ) 20 mm. wide cross P.V.C. sheet as gap insert for the rail and bottom rail. Door to be fixed to frames with 3 nos M.S. powder coated but hinges of size 100 mm. x 25 mm. x 2 mm. using 32 mm. long steel screws drilled suitable to pass through both the walls of the M.S. tube. Other hardwares should be fixed with 19 x 6 mm. size steel screws including fixture fasting complete as per direction of Engineer -in -charge. .
Fourth Floor Providing and Fixing 30 MM thick both side Prelaminated Solid Panel P.V.C. Door Shutter consisting of frame made out of M.S. tubes of 19 guage thickness and, size 19 x 19 mm. for styles and 15 x15 mm. for the top and bottom rails, M.S. frame shall have a coat of metel primer of approved make and manufacture. M.S frame shall be covered with heat mouled PVC ' C ' channel made from 5 mm. (+/- 0.25) thick prelaminated sheet of density 600 kg/cbm, of size 30 mm. thickness 70 mm. width out of which 50 mm. shall be flat and 20 mm shall be tapered in 45 degree angle on either side forming stiles and 5 mm. thick, 95 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered in 45 degree on the inner side to form top and bottom rail and 115 mm. wide P.V.C. sheet out of which 75 mm. shall be falt and 20 mm. shall be tapered on both sides to form lock rail.Top,bottom and lock rail shall be provided either side of the panel. An additional 5 mm (+/- 0.25) thick PVC strip of 20 mm width is to be stuck on the bottom side of the ' c ' channel prelaminated paneling of 5 mm (+/- 0.25) thick P.V.C. sheet to be fitted inside the M.S. frame welded/ sealed to the styles and rails with 5 mm. (+/- 0.25) x 30 mm. P.V.C. sheet beading on either side and joined together with solvent cement adhesive etc., 10 mm. thickness (5 mm. (+/- 0.25) x 2 nos. ) 20 mm. wide cross P.V.C. sheet as gap insert for the rail and bottom rail. Door to be fixed to frames with 3 nos M.S. powder coated but hinges of size 100 mm. x 25 mm. x 2 mm. using 32 mm. long steel screws drilled suitable to pass through both the walls of the M.S. tube. Other hardwares should be fixed with 19 x 6 mm. size steel screws including fixture fasting complete as per direction of Engineer -in -charge. .
Ground Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
First Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
Second Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
terrace Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
Third Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
Fourth Floor Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
terrace Floor Hostel Door Frame: Supplying & Fixing frames for Fire resistant door shutters 1st class Malaysian Hardwood Frame densified (810 kg/cum) and pressure treated with fire retardant chemicals in vacuum impregnation vessel under 160 psi pressure as per IS:401and kiln seasoned to moisture below 15% as per IS:1141 of section 120 X 70 mm spray quoted with 2 coats of intumescent paint of minimum 200 micron, with single row of Brush- Type ASTROFLAME intumescent strip of size 10mm x 4mm affixed in the slit of the Frame for fire and smoke sealing, etc. complete.
Ground Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
First Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Second Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Terrace Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Third Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Fourth Floor Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Terrace (Hostel)Shutter : Supplying & Fixing of 55mm thick asbestos free 'TUFWUD' brand - 3 criteria checked - fire, heat and smoke resistant composite Fire check Door Shutter complying with with fire performance - FD 120 as per IS:3614 (part - II) comprising of 2x8mm Calcium Silicate boards over Chemically treated (with Fire retardant chemicals in vaccum pressure impregnation vessels under 160 psi pressure as per IS:401 and kiln seasoned to moisture below 15% as per IS:1141) internal timber (Malaysian Hard Wood, densified to 810 kg/cum) frame work of 100x32 mm with 32mm thick infill of ceramic fiber (density 128 Kg/cum), vermaculite mix faced with 3mm Fire retardant High Density fibre board, internally lipped with hardwood beading and pasted in Hydraulic Press under 25 MPa, spray quoted with 2 coats of in-tumescent paint of minimum 300 micron, and with single row of Brush- Type intumescent strip of size 10mmx4mm affixed on periphery for fire and smoke sealing in the slit on all edges of shutter except bottom, without any external lipping.
Ground Floor c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
First Floor c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Second Floor c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Terracec) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Third Floor c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Fourth Floor c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Terrace (Hostel)c) Vision Panel:2 HR rated E Class clear high stress fire rated glass is pre fabricated strategically inside the shutter structure with 10 mm inside the shutter on all sides with U- glazing. An additional insulated powdercoated 'Z' channel of 16 swg MS sheet to be fixed for reinforcement of the joints.
Ground Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
First Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
Second Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
terrace Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
Third Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
Fourth Floor Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
Terrace (Hostel)Panic Bar: (For 2 Hr fire Rated single Panic bar)Supplying, fitting & fixing Surface mounted Crash Bar/ panic Bar of touch pad style ,made of heavy duty cast iron/ steel body & latches with SS ,BHMA certified & conforming to ANSI A 156.3 for grade-1 ( 3 hours fire rated ) and suitable for surface mounting to wooden/hollow metal/ Al framed door,with maximum operating force 8Kilogram for unlocking easily & outwardly during emergency,complete in all respect as per direction & satisfaction of Engineer-in charge including all taxes & incidental charges. (Note: To be installed at "FIRE EXIT"only under location specific instruction of Eingineer-in -Charge.)
Ground Floor Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various sizes. Window will be made from Geeta / Malwin / Lexil / Brandson, 25 to 27 mm slim series or equivalent system. Window will be of specially extruded aluminium 3 Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with speially developed clits.Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have sngle point self pressing lock. All fixing screws will be of SS 202.
First Floor Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various sizes. Window will be made from Geeta / Malwin / Lexil / Brandson, 25 to 27 mm slim series or equivalent system. Window will be of specially extruded aluminium 3 Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with speially developed clits.Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have sngle point self pressing lock. All fixing screws will be of SS 202.
Second Floor Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various sizes. Window will be made from Geeta / Malwin / Lexil / Brandson, 25 to 27 mm slim series or equivalent system. Window will be of specially extruded aluminium 3 Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with speially developed clits.Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have sngle point self pressing lock. All fixing screws will be of SS 202.
Third Floor Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various sizes. Window will be made from Geeta / Malwin / Lexil / Brandson, 25 to 27 mm slim series or equivalent system. Window will be of specially extruded aluminium 3 Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with speially developed clits.Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have sngle point self pressing lock. All fixing screws will be of SS 202.
Fourth Floor Three Track Two Glass + One Net Shutter Window : Providing and fixing aluminium system color anodized sliding window of various sizes. Window will be made from Geeta / Malwin / Lexil / Brandson, 25 to 27 mm slim series or equivalent system. Window will be of specially extruded aluminium 3 Track - 2 Glass + 1 net shutter, track joints will be of 45 degree joints, joints will be fixed with speially developed clits.Track frame will be fixed to the masonry opening of windows with SS 202 screws. Glass shutter will be made from specially extruded aluminium section, glass considered is 5 mm clear toughened glass. All shutter will be having 45 degree joints, joints will be fixed specially developed clits to form uniform hairline joint. All shutter will be fixed to the main frame with necessary double roller to have smooth and easy movement of the shutter. Shutters will have sngle point self pressing lock. All fixing screws will be of SS 202.
Ground Floor Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram/ One Square Metre as per drawing including fixtures necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting complete.
First Floor Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram/ One Square Metre as per drawing including fixtures necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting complete.
Second Floor Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram/ One Square Metre as per drawing including fixtures necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting complete.
Third Floor Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram/ One Square Metre as per drawing including fixtures necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting complete.
Fourth Floor Providing and fixing mild steel grill work for windows, ventilators, etc. 15 Kilogram/ One Square Metre as per drawing including fixtures necessary welding and painting with one coat of anticorrosive paint and two coats of oil painting complete.
Ground Floor Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use)
First Floor Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use)
Second Floor Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use)
Third Floor Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use)
Fourth Floor Providing and Fixing mat finish stainless steel (of 302 grade ) railing with top pipe of 50 mm dia. and vertical pipe of 38 mm dia at 0.60 m c/c or as required and horizontal pipes of 25 mm dia in three rows, all pipes of 2 mm thick including buffing,fabricating fixtures and fastening including pipe base of appropriate diameter and ball base of 75 mm dia above newel post of 75 mm diameter etc. complete (Prior approval of sample and brand by Ex.Engineer is necessary before use)
Ground Floor Providing and fixing 40mm diameter and 1.5 mm thick Stainless steel hand railing in S.S.304 Grade including fabricating ,fixtures, errecting, necessary welding, grinding, finishing, buffing to stainless steel pipe etc. complete
First Floor Providing and fixing 40mm diameter and 1.5 mm thick Stainless steel hand railing in S.S.304 Grade including fabricating ,fixtures, errecting, necessary welding, grinding, finishing, buffing to stainless steel pipe etc. complete
Second Floor Providing and fixing 40mm diameter and 1.5 mm thick Stainless steel hand railing in S.S.304 Grade including fabricating ,fixtures, errecting, necessary welding, grinding, finishing, buffing to stainless steel pipe etc. complete
Third Floor Providing and fixing 40mm diameter and 1.5 mm thick Stainless steel hand railing in S.S.304 Grade including fabricating ,fixtures, errecting, necessary welding, grinding, finishing, buffing to stainless steel pipe etc. complete
Fourth Floor Providing and fixing 40mm diameter and 1.5 mm thick Stainless steel hand railing in S.S.304 Grade including fabricating ,fixtures, errecting, necessary welding, grinding, finishing, buffing to stainless steel pipe etc. complete
Ground Floor Providing and fixing rolling shutter fabricated from steel laths of minimum thickness 0.9 mm with lock plate of 3.15 mm thickness reinforced with 35 x 35 x 5 mm angle section fitted with sliding bolts and handles for both sides, deep M.S. channel section of depth and thickness not less than 65 mm and 3.15 mm respectively with hold fast arrangements, M.S. Bracket plate 300 x 300 x 3.15 mm minimum size and shape with square bar, suspension shaft of minimum 32 mm diameter, hood cover of M.S. sheet not less than 0.9 mm thickness and of any size at top and safety devices including mechanical gear operation arrangement consisting of worm gear wheels and worms of high grade cast iron or mild steel and one coat of red lead primer etc. complete. (I.S. 62481979) (With mechanical gear)
Ground Floor Providing and fixing 90 cm x 60 cm Granite plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete
Ground Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -10 mm dia 200mm depth
First Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -10 mm dia 200mm depth
Second Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -10 mm dia 200mm depth
Third Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -10 mm dia 200mm depth
Fourth Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -10 mm dia 200mm depth
Ground Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -12 mm dia 240mm depth
First Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -12 mm dia 240mm depth
Second Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -12 mm dia 240mm depth
Third Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -12 mm dia 240mm depth
Fourth Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -12 mm dia 240mm depth
Ground Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -16 mm dia 320mm depth
First Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -16 mm dia 320mm depth
Second Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -16 mm dia 320mm depth
Third Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -16 mm dia 320mm depth
Fourth Floor Supplying, Drilling/Cleaning hole and injecting chemical. Application to be designed separately for Rebars as Simply Supported, Moment or Splice Connection as per EC2/TR 023 or relevant tested and accepted rebar guidelines. The chemical should have ETA approval for seismic rebar as a minimum qualifying criterion. Drilling hole with double flute type drill bits or hollow drill bits to the required depth by rotary hammer drill, cleaning with brush and jet of clean air, filling resin and hardener using serrated nozzle to eliminate mixing error with standard HDE A22 battery dispenser along with piston plug. The installation and the setting instructions should be strictly followed as per the manufacturer’s recommendations. The adequate diameter and embedment of rebars to be decided as per PROFIS Rebar Software & the report to be submitted to the project manager/ design engineer for approval. Scanning before drilling to be done to avoid hitting existing rebars. Re 500 -16 mm dia 320mm depth
Ground Floor Galvanised Fins: Providing and fixing 300x75mm rectangular metal Fins made from 0.7mm GI Sheet with infill of honecombing foam, powder coated with pure polyester Matt finish exterior grade UV resistant powder coating for 10 years warranty. The fins have to withstand it's Self load and windspeed of 120kmph. The brackets 2mm or as required thick have to be camouflaged in the fins to give a thorough fin height from Ground to Top Floor . Brackets to be fixed to the substructure or civil work using Ceramic coated or SS anchors studs. The fins to be connected to the brackets using wafer head SS Screws. Provision to be made water drainage through the fins to prevent any future rusting. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge.
First Floor Galvanised Fins: Providing and fixing 300x75mm rectangular metal Fins made from 0.7mm GI Sheet with infill of honecombing foam, powder coated with pure polyester Matt finish exterior grade UV resistant powder coating for 10 years warranty. The fins have to withstand it's Self load and windspeed of 120kmph. The brackets 2mm or as required thick have to be camouflaged in the fins to give a thorough fin height from Ground to Top Floor . Brackets to be fixed to the substructure or civil work using Ceramic coated or SS anchors studs. The fins to be connected to the brackets using wafer head SS Screws. Provision to be made water drainage through the fins to prevent any future rusting. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge.
Second Floor Galvanised Fins: Providing and fixing 300x75mm rectangular metal Fins made from 0.7mm GI Sheet with infill of honecombing foam, powder coated with pure polyester Matt finish exterior grade UV resistant powder coating for 10 years warranty. The fins have to withstand it's Self load and windspeed of 120kmph. The brackets 2mm or as required thick have to be camouflaged in the fins to give a thorough fin height from Ground to Top Floor . Brackets to be fixed to the substructure or civil work using Ceramic coated or SS anchors studs. The fins to be connected to the brackets using wafer head SS Screws. Provision to be made water drainage through the fins to prevent any future rusting. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge.
Third Floor Galvanised Fins: Providing and fixing 300x75mm rectangular metal Fins made from 0.7mm GI Sheet with infill of honecombing foam, powder coated with pure polyester Matt finish exterior grade UV resistant powder coating for 10 years warranty. The fins have to withstand it's Self load and windspeed of 120kmph. The brackets 2mm or as required thick have to be camouflaged in the fins to give a thorough fin height from Ground to Top Floor . Brackets to be fixed to the substructure or civil work using Ceramic coated or SS anchors studs. The fins to be connected to the brackets using wafer head SS Screws. Provision to be made water drainage through the fins to prevent any future rusting. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge.
Fourth Floor Galvanised Fins: Providing and fixing 300x75mm rectangular metal Fins made from 0.7mm GI Sheet with infill of honecombing foam, powder coated with pure polyester Matt finish exterior grade UV resistant powder coating for 10 years warranty. The fins have to withstand it's Self load and windspeed of 120kmph. The brackets 2mm or as required thick have to be camouflaged in the fins to give a thorough fin height from Ground to Top Floor . Brackets to be fixed to the substructure or civil work using Ceramic coated or SS anchors studs. The fins to be connected to the brackets using wafer head SS Screws. Provision to be made water drainage through the fins to prevent any future rusting. The entire system has to be backed up by a structural stability report from a Chartered Engineer. Required detailed shop drawing and sample is needs to get approved from the project Architect before execution on site. Work shall be carried our including all lead and lifts etc as directed by Engineer-In-Charge.
Ground Floor Providing and fixing of façade at all heights with extruded hollow Clay / Terracotta ventilated rainscreen tiles of height 259/ 309/ 409mm and lengthof 1190 mm of approved texture,design and pattern having Flexural Strength/ Modulus of Rupture of ? 14 N/m² and maximum water absorption of 10% tested as per ISO 10545-4:2004(E) and ISO 10545-3:1995 respectively in true level fixed to a supporting aluminium framework (Alloy 6063 T5/T6) consisting of vertical 'T' (for intermediates)/ 'L' (for ends/ termination)/ Tubular sections (at corners)of size 80x60x2mm/ 40x60x2mm/ 40x40x2mm respectively, spaced at maximum spacing of 1200mm c/c matching to the tile vertical grid, and horizontal aluminium 'C'-clamps of size 56x34x2 mm thickness of length 150mm at junction of tiles and of length 75mm at wall ends/ corners fixed on top of the vertical sections at spacing of 250/ 300/ 400mm c/c matching to the tile horizontal grid with two numbers of self-drilling / self-tapping SS screws of size 5.5x25 mm with EPDM washers.The vertical 'T'/'L/ Tubular' sections shall be fixed to the wall using HDG (hot-dip-galvanized) steel Lbrackets (galvanizing thickness of minimum 80 microns) of size 220x110x12 mmat outer corners and stainless steel grade 304,M10 full threaded anchor fasteners with nylon sleeve 100mm long (for brick work) and M8 expansion anchor fasteners 75mm long for concrete surface, spacing of brackets to be based on a structural/static calculation. The brackets shall be of length 175mm at junction of two vertical aluminium profiles and of length 100mm at intermediate points of vertical profiles and shall be fixed to the vertical aluminium T / L / Tubular profiles using two numbers self-drilling/ self-tapping SS screws of size 5.5x25 mm with EPDM washers.“EPDM gaskets to be fixed in between brackets and vertical profiles. The tiles shall be mounted on the ‘C’ clamps such that the tiles are supported at top and bottom at both ends. The tiles shall be mounted on the Cclamps with EPDM profiles in between such that the tiles are supported at top and bottom at both ends. The vertical joint open groove between two adjacent tiles shall be 10mm. The tiles and system shall be designed to resist wind load as per IS 875 (Part 3) according to different zones. The tiles shall be installed using the ventilated rain screen principle with provision for natural ventilation of the space between the façade tiles and the structural wall. The work shall be carried out as per specification, drawing and as per direction of the Engineer-in-Charge. Note : Scaffolding wherever required to be paid separately. 26.93.2 With 24mm thickness (+/- 10%) terracotta tiles of other than grey colors
First Floor Providing and fixing of façade at all heights with extruded hollow Clay / Terracotta ventilated rainscreen tiles of height 259/ 309/ 409mm and lengthof 1190 mm of approved texture,design and pattern having Flexural Strength/ Modulus of Rupture of ? 14 N/m² and maximum water absorption of 10% tested as per ISO 10545-4:2004(E) and ISO 10545-3:1995 respectively in true level fixed to a supporting aluminium framework (Alloy 6063 T5/T6) consisting of vertical 'T' (for intermediates)/ 'L' (for ends/ termination)/ Tubular sections (at corners)of size 80x60x2mm/ 40x60x2mm/ 40x40x2mm respectively, spaced at maximum spacing of 1200mm c/c matching to the tile vertical grid, and horizontal aluminium 'C'-clamps of size 56x34x2 mm thickness of length 150mm at junction of tiles and of length 75mm at wall ends/ corners fixed on top of the vertical sections at spacing of 250/ 300/ 400mm c/c matching to the tile horizontal grid with two numbers of self-drilling / self-tapping SS screws of size 5.5x25 mm with EPDM washers.The vertical 'T'/'L/ Tubular' sections shall be fixed to the wall using HDG (hot-dip-galvanized) steel Lbrackets (galvanizing thickness of minimum 80 microns) of size 220x110x12 mmat outer corners and stainless steel grade 304,M10 full threaded anchor fasteners with nylon sleeve 100mm long (for brick work) and M8 expansion anchor fasteners 75mm long for concrete surface, spacing of brackets to be based on a structural/static calculation. The brackets shall be of length 175mm at junction of two vertical aluminium profiles and of length 100mm at intermediate points of vertical profiles and shall be fixed to the vertical aluminium T / L / Tubular profiles using two numbers self-drilling/ self-tapping SS screws of size 5.5x25 mm with EPDM washers.“EPDM gaskets to be fixed in between brackets and vertical profiles. The tiles shall be mounted on the ‘C’ clamps such that the tiles are supported at top and bottom at both ends. The tiles shall be mounted on the Cclamps with EPDM profiles in between such that the tiles are supported at top and bottom at both ends. The vertical joint open groove between two adjacent tiles shall be 10mm. The tiles and system shall be designed to resist wind load as per IS 875 (Part 3) according to different zones. The tiles shall be installed using the ventilated rain screen principle with provision for natural ventilation of the space between the façade tiles and the structural wall. The work shall be carried out as per specification, drawing and as per direction of the Engineer-in-Charge. Note : Scaffolding wherever required to be paid separately. 26.93.2 With 24mm thickness (+/- 10%) terracotta tiles of other than grey colors
Second Floor Providing and fixing of façade at all heights with extruded hollow Clay / Terracotta ventilated rainscreen tiles of height 259/ 309/ 409mm and lengthof 1190 mm of approved texture,design and pattern having Flexural Strength/ Modulus of Rupture of ? 14 N/m² and maximum water absorption of 10% tested as per ISO 10545-4:2004(E) and ISO 10545-3:1995 respectively in true level fixed to a supporting aluminium framework (Alloy 6063 T5/T6) consisting of vertical 'T' (for intermediates)/ 'L' (for ends/ termination)/ Tubular sections (at corners)of size 80x60x2mm/ 40x60x2mm/ 40x40x2mm respectively, spaced at maximum spacing of 1200mm c/c matching to the tile vertical grid, and horizontal aluminium 'C'-clamps of size 56x34x2 mm thickness of length 150mm at junction of tiles and of length 75mm at wall ends/ corners fixed on top of the vertical sections at spacing of 250/ 300/ 400mm c/c matching to the tile horizontal grid with two numbers of self-drilling / self-tapping SS screws of size 5.5x25 mm with EPDM washers.The vertical 'T'/'L/ Tubular' sections shall be fixed to the wall using HDG (hot-dip-galvanized) steel Lbrackets (galvanizing thickness of minimum 80 microns) of size 220x110x12 mmat outer corners and stainless steel grade 304,M10 full threaded anchor fasteners with nylon sleeve 100mm long (for brick work) and M8 expansion anchor fasteners 75mm long for concrete surface, spacing of brackets to be based on a structural/static calculation. The brackets shall be of length 175mm at junction of two vertical aluminium profiles and of length 100mm at intermediate points of vertical profiles and shall be fixed to the vertical aluminium T / L / Tubular profiles using two numbers self-drilling/ self-tapping SS screws of size 5.5x25 mm with EPDM washers.“EPDM gaskets to be fixed in between brackets and vertical profiles. The tiles shall be mounted on the ‘C’ clamps such that the tiles are supported at top and bottom at both ends. The tiles shall be mounted on the Cclamps with EPDM profiles in between such that the tiles are supported at top and bottom at both ends. The vertical joint open groove between two adjacent tiles shall be 10mm. The tiles and system shall be designed to resist wind load as per IS 875 (Part 3) according to different zones. The tiles shall be installed using the ventilated rain screen principle with provision for natural ventilation of the space between the façade tiles and the structural wall. The work shall be carried out as per specification, drawing and as per direction of the Engineer-in-Charge. Note : Scaffolding wherever required to be paid separately. 26.93.2 With 24mm thickness (+/- 10%) terracotta tiles of other than grey colors
Ground Floor Providing and applying antifungal self leveling 3mm EPU system including coving at Floor wall junction, necessary surface preparation by cleaning and de-dusting. The System shall be executed in three stages, firstly by applying a solvent free epoxy primer which has a volumetric ratio of mixing @ 200 microns dft, then laying 1.8mm self leveling epoxy based screed and finally applying a solvent free EPU ( epoxy-polyurethane), self leveling coating to yield a dft of 1000 microns. The EPU coating shall be a two component with volumetric ratio of mixing. No fillers shall be added at the site while laying the self leveling EPU including Aisle or zone marking in different colours etc. complete as per manufacturers specifications and as directed & approved by Engineer In-Charge.
Ground Floor Providing and fixing super quality factory made phenol bonded solid core double leaf flush commercial door shutter of thickness as mentioned below and of approved make conforming to IS: 2202 (Part I, II) with 12mm thk. teak wood lipping all around, 3mm thk. commercial veneer with three coats of french polish on external face and 150mm x 60 mm or 125 mm x 75 mm C.P. teak wood frame with glazed fanlight fanlight with 4mm thk. glass including bright finished or black enameled mild steel butt hinges, approved fixtures, fastening, hooks, eyes, screws and painting the frame and Interior side with one coat of primer, putty and two coats of synthetic enamel paint of approved make and colour etc. complete as directed by Engineer in charge. (35mm thick shutter)
Providing and fabricating structural steel work in rolled sections like joists, channels, angles, tees etc. as per detailed design and drawings or as directed including cutting, fabricating, hoisting, erecting, fixing in position making riveted / bolted /welded connections without connecting plates, braces etc. and including one coat of anticorrosive paint and over it two coats of oil painting of approved quality and shade etc. complete.
Supply and Installation of translucent roof with DPI Flux standing seam multicell polycarbonate panel system. The system with complete assembly of co extruded UV protected multicell panels incorporated into a complete system. Co-extruded UV protected polycarbonate panel system of min 12 mm thick of 900 mm (min.) width with angular daylighting concept. Panels shall have minimum six layers with truss bridge design for higher flexibility & strength. Panels with all fixing accessories to ensure best performance for wind uplift, vibration, oil canning and visual appearance. Panels shall be manufactured with vertical standing seam at both sides of the panel. Panels shall be fixed on Purlin with snap on connectors with double tooth grip lock locking mechanism and will be secured on MS structure (will be paid Separately) with 3 One Numbers self-drilling screws & trapezoid SS fasteners holding the base of the standing seam offering best stability having a pull-out load of min. 7000N (7KN) tested as per ISO 6892:1998 and IS 1608: 2005, as per design requirement. Panels must satisfy Dart drop impact test as per IS 14443-97 shall show no sign of breakage on Polycarbonate sheets which have been exposed to UV for a min. of 500 Hours as per ASTM G 155. Panels shall not have Yellowness Index as per ASTM D 1925 of 15 units when tested on a sample exposed to UV for 500 Hours as per ASTM G 155. U value shall not be more than 1.6 W/m2K as per EN ISO 10077-2:2018. Panel shall be with additional End cap/Aluminium U/F profile/ Glazing Bar for ends as required. Panel shall be fixed over MS structural steel/MS purlin (paid separately) conforming to the detail technical specifications as per approved architectural drawings. Trained and factory authorized labour with supervision to complete the entire panel installation as per drawing & direction of the engineering in charge. Colour: As per Approval. Approved Make: FLUX by DPI Daylighting or approved equivalent The 12mm thick panels shall be used for a roofing height of upto 15 mtrs.
Providing and applying a base coat comprising of 1KilogramPolydee-MC and 1Kilogramfresh cement after wetting the surface followed by drying the surface for 2 days, apply primer coat of TP-40 and after drying, applying Polydee-11 two component (mixing ratio 2 A : 1 B) ) Antibacterial food grade coating inside drinking water tank in two coats with time interval of minimum 8 hrs. covering 7 years guarantee on Court Fee Stamp Paper of Rs. 100/- etc. complete.
Ground Floor Providing and applying water proofing treatment using acrylic polymer modified cement based water proofing coating with fibre glass mesh mixing at the rate of powder to liquid (2:1) by weight covering 9 to 10 Square Metre /Kilogram with two coat using approved chemicals for masonry and concrete surface by brush covering 7 years guarantee on Stamp Papers etc. complete.
Terrace Floor Providing and applying water proofing treatment using acrylic polymer modified cement based water proofing coating with fibre glass mesh mixing at the rate of powder to liquid (2:1) by weight covering 9 to 10 Square Metre /Kilogram with two coat using approved chemicals for masonry and concrete surface by brush covering 7 years guarantee on Stamp Papers etc. complete.
Ground Floor Providing and laying in place 300mm x 300mm x 9.8mm vitrified tactile warning and directional tiles of the approved brand, make and colour inside the buildings at in all corridors and lobbies, level differences etc. as per accessibility standards and as per the installation instructions prescribed by the manufacturer including zarri making wherever required and finishing including grouting the joints with white cement with matching pigments etc. up to the satisfaction of the engineer in charge complete.
First Floor Providing and laying in place 300mm x 300mm x 9.8mm vitrified tactile warning and directional tiles of the approved brand, make and colour inside the buildings at in all corridors and lobbies, level differences etc. as per accessibility standards and as per the installation instructions prescribed by the manufacturer including zarri making wherever required and finishing including grouting the joints with white cement with matching pigments etc. up to the satisfaction of the engineer in charge complete.
Second Floor Providing and laying in place 300mm x 300mm x 9.8mm vitrified tactile warning and directional tiles of the approved brand, make and colour inside the buildings at in all corridors and lobbies, level differences etc. as per accessibility standards and as per the installation instructions prescribed by the manufacturer including zarri making wherever required and finishing including grouting the joints with white cement with matching pigments etc. up to the satisfaction of the engineer in charge complete.
Ground Floor Centering and shuttering of steel plates with M.S. Angles including strutting, propping etc. and removal of form for : Cornices and mouldings
First Floor Centering and shuttering of steel plates with M.S. Angles including strutting, propping etc. and removal of form for : Cornices and mouldings
Providing and supplying aluminium extruded tubular and other aluminium sections as per the architectural drawings and approved shop drawings , the aluminium quality as per grade 6063 T5 or T6 as per BS 1474,including super durable powder coating of 60-80 microns conforming to AAMA 2604 of required colour and shade as approved by the Engineer-in-Charge. ( The item includes cost of material such as cleats, sleeves, screws etc. necessary for fabrication of extruded aluminium frame work. Nothing extra shall be paid on this account). The weight of aluminium extruded section shall be taken for purpose of payment.
Ground Floor Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)- cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holdingglass. (d) Providing and fixing in position flashings of solid aluminiumsheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge.Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub- head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves) on the external face shall be measured in sqm. up to two decimal places.Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payableseparately.The NIT approving authority will decide the necessity of testingon the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NABL accredited lab or any other accreditation body which operates in accordance with ISO/ IEC 17011 and accredits labs as per ISO/IEC 170251. Performance Laboratory Test for Air Leakage Test (-50pa to - 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01- 05 testing method for a range upto 2000 ml4. Structural Performance Deflection and deformation by static air pressure test (1.5 times design wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm+B397 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test, Tests to be conducted on site.6. Onsite Test for Water Leakage for a pressure range 50kpa to 240 kpa (35psi) upto 2000 ml sqm 3111.35
First Floor Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)- cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holdingglass. (d) Providing and fixing in position flashings of solid aluminiumsheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge.Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub- head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves) on the external face shall be measured in sqm. up to two decimal places.Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payableseparately.The NIT approving authority will decide the necessity of testingon the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NABL accredited lab or any other accreditation body which operates in accordance with ISO/ IEC 17011 and accredits labs as per ISO/IEC 170251. Performance Laboratory Test for Air Leakage Test (-50pa to - 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01- 05 testing method for a range upto 2000 ml4. Structural Performance Deflection and deformation by static air pressure test (1.5 times design wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm+B397 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test, Tests to be conducted on site.6. Onsite Test for Water Leakage for a pressure range 50kpa to 240 kpa (35psi) upto 2000 ml sqm 3111.35
Second Floor Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III (the system must passed the proof test at 1.5 times design wind pressure without any failure), including functional design of the aluminum sections for fixing glazing panels of various thicknesses, aluminium cleats, sleeves and splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc., structural and weather silicone sealants, flashings, fire stop (barrier)- cum-smoke seals, microwave cured EPDM gaskets for water tightness, pressure equalisation & drainage and protection against fire hazard including:(b) Fabricating and supplying serrated M.S. hot dip galvanised / Aluminium alloy of 6005 T5 brackets of required sizes, sections and profiles etc. to accommodate 3 Dimentional movement for achieving perfect verticality and fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steel anchor fasteners/ bolts, nylon seperator to prevent bimetallic contacts with nuts and washers etc. of stainless steel grade 316, of the required capacity and in required numbers.(c) Providing and filling, two part pump filled, structural silicone sealant and one part weather silicone sealant compatible with the structural silicone sealant of required bite size in a clean and controlled factory / work shop environment, including double sided spacer tape, setting blocks and backer rod, all of approved grade, brand and manufacture, as per the approved sealant design, within and all around the perimeter for holdingglass. (d) Providing and fixing in position flashings of solid aluminiumsheet 1 mm thick and of sizes, shapes and profiles, as required as per the site conditions, to seal the gap between the building structure and all its interfaces with curtain glazing to make it watertight.(e) Making provision for drainage of moisture/ water that enters the curtain glazing system to make it watertight, by incorporating principles of pressure equalization, providing suitable gutter profiles at bottom (if required), making necessary holes of required sizes and of required numbers etc. complete. This item includes cost of all inputs of designing, labour for fabricating and installation of aluminium grid, installation of glazed units, T&P, scaffolding and other incidental charges including wastages etc., enabling temporary structures and services, cranes or cradles etc. as described above and as specified. The item includes the cost of getting all the structural and functional design including shop drawings checked by a structural designer, dully approved by Engineer-in-charge. The item also includes the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working structural glazing as specified, cleaning and protection till the handing over of the building for occupation. In the end, the Contractor shall provide a water tight structural glazing having all the performance characteristics etc. all complete as required, as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer- in-Charge.Note:- 1. The cost of providing extruded aluminium frames, shadow boxes, extruded aluminium section capping for fixing in the grooves of the curtain glazing and vermin proof stainless steel wire mesh shall be paid for separately under relevant items under this sub- head. However, for the purpose of payment, only the actual area of structural glazing (including width of grooves) on the external face shall be measured in sqm. up to two decimal places.Note:-2. The following performance test are to be conducted on structural glazing system if area of structural glazing exceeds 2500 Sqm from the certified laboratories accreditated by NABL(National Accreditation Board for Testing and Calibration Laboratories), Department of Science & Technologies, India. Cost of testing is payableseparately.The NIT approving authority will decide the necessity of testingon the basis of cost of the work, cost of the test and importance of the work. Performance Testing of Structural glazing system Tests to be conducted in the NABL accredited lab or any other accreditation body which operates in accordance with ISO/ IEC 17011 and accredits labs as per ISO/IEC 170251. Performance Laboratory Test for Air Leakage Test (-50pa to - 300pa) & (+50pa to +300pa) as per ASTM E-283-04 testing method for a range of testing limit 1 to 200 mVhr2. Static Water Penetration Test. (50pa to 1500pa) as per ASTME- 331-09 testing method for a range up to 2000 ml.3. Dynamic Water Penetration (50pa to 1500pa) as per AAMA 501.01- 05 testing method for a range upto 2000 ml4. Structural Performance Deflection and deformation by static air pressure test (1.5 times design wind pressure without any failure) as per ASTME-330-10 testing method for a range upto 50 mm+B397 5. Seismic Movement Test (upto 30 mm) as per AAMA 501.4-09 testing method for Qualitative test, Tests to be conducted on site.6. Onsite Test for Water Leakage for a pressure range 50kpa to 240 kpa (35psi) upto 2000 ml sqm 3111.35
Ground Floor Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor.(i) Coloured tinted float glass 6mm thick substrate with reflectivesoft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20%, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
First Floor Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor.(i) Coloured tinted float glass 6mm thick substrate with reflectivesoft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20%, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
Second Floor Providing, assembling and supplying vision glass panels (IGUs) comprising of hermetically-sealed 6-12- 6 mm insulated glass (double glazed) vision panel units of size and shape as required and specified, comprising of an outer heat strengthened float glass 6mm thick, of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade, an inner Heat strengthned clear float glass 6mm thick, spacer tube 12mm wide, dessicants, including primary seal and secondary seal (structural silicone sealant) etc. all complete for the required performances, as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer-in-Charge. The IGUs shall be assembled in the factory/ workshop of the glass processor.(i) Coloured tinted float glass 6mm thick substrate with reflectivesoft coating on face # 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass of approved make having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20%, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/ m2 degree K etc. The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
Ground Floor Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in- Charge.
First Floor Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in- Charge.
Second Floor Extra for openable side / top hung vision glass panels (IGUs) including providing and supplying at site all accessories and hardwares for the openable panels as specified and of the approved make such as heavy duty stainless steel friction hinges, min 4 -point cremone locking sets with stainless steel plates, handles, buffers etc. including necessary stainless steel screws/ fasteners, nuts, bolts, washers etc. all complete as per the Architectural drawings, as per the approved shop drawings, as specified and as directed by the Engineer- in- Charge.
Ground Floor Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge.For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. (Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevent Item*).“(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 K etc. . The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
First Floor Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge.For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. (Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevent Item*).“(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 K etc. . The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
Second Floor Providing and supplying Spandrel Glass Panels comprising of 6 mm thick heat strengthened monolithic float glass of approved colour and shade with reflective soft coating on surface # 2 of approved colour and shade so as to match the colour and shade of the IGUs in the vision panels etc. ,all complete for the required performances as specified, as per the Architectural drawings, as per the approved shop drawings, as specified, and as directed by the Engineer- in- Charge.For payment, only the actual area of glass on face # 1 of the glass panels (but excluding the area of grooves and weather silicone sealant) provided and fixed in position, shall be measured in sqm. (Payment for fixing of Spandrel Glass Panels in the curtain glazing is included in cost of relevent Item*).“(i) Coloured tinted float glass 6mm thick substrate with reflective soft coating on face # 2, having properties as visible Light transmittance (VLT) of 25 to 35 %, Light reflection internal 10 to 15%, light reflection external 10 to 20 %, shading coefficient (0.25- 0.28) and U value of 3.0 to 3.3 W/m2 K etc. . The properties of performance glass shall be decided by technical sanctioning authority as per the site requirement.
Providing and fixing H.D.P container one piece moulded water tank made out of low density polythyler and built corrugation including of delivery up to destination hoisting and fixing of accessories such as inlet, outlet overflow of all tanks capacity above 1000 to 20,000 litres
Ground Floor Providing and fixing Ivory european type wall-hung, Size 360 mm x 360 mm x 575 mm with flush valve having flow rate upto 6.0Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings, cutting & making good walls, Floor s etc as directed by Engineer in charge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) Spec. No. As directed by Engineer-in-Charge
First Floor Providing and fixing Ivory european type wall-hung, Size 360 mm x 360 mm x 575 mm with flush valve having flow rate upto 6.0Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings, cutting & making good walls, Floor s etc as directed by Engineer in charge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) Spec. No. As directed by Engineer-in-Charge
Second Floor Providing and fixing Ivory european type wall-hung, Size 360 mm x 360 mm x 575 mm with flush valve having flow rate upto 6.0Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings, cutting & making good walls, Floor s etc as directed by Engineer in charge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) Spec. No. As directed by Engineer-in-Charge
Third Floor Providing and fixing Ivory european type wall-hung, Size 360 mm x 360 mm x 575 mm with flush valve having flow rate upto 6.0Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings, cutting & making good walls, Floor s etc as directed by Engineer in charge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) Spec. No. As directed by Engineer-in-Charge
Fourth Floor Providing and fixing Ivory european type wall-hung, Size 360 mm x 360 mm x 575 mm with flush valve having flow rate upto 6.0Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including PVC soil pipe, vent pipe upto outside face of wall, 100mm dia PVC plug bend inlet pipe all fittings, cutting & making good walls, Floor s etc as directed by Engineer in charge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.) Spec. No. As directed by Engineer-in-Charge
Ground Floor Providing and fixing Orissa Pan of size 580 x 445 x 260mm with approved make flush valve including trap, C.I. soil and vent pipe up to outside face of wall including 100mm dia. C.I. plug, bend and necessary pipe connection, etc complete. Asdirected by Engineer in charge.
First Floor Providing and fixing Orissa Pan of size 580 x 445 x 260mm with approved make flush valve including trap, C.I. soil and vent pipe up to outside face of wall including 100mm dia. C.I. plug, bend and necessary pipe connection, etc complete. Asdirected by Engineer in charge.
Second Floor Providing and fixing Orissa Pan of size 580 x 445 x 260mm with approved make flush valve including trap, C.I. soil and vent pipe up to outside face of wall including 100mm dia. C.I. plug, bend and necessary pipe connection, etc complete. Asdirected by Engineer in charge.
Ground Floor Providing and fixing Table top Ivory wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge.
First Floor Providing and fixing Table top Ivory wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge.
Second Floor Providing and fixing Table top Ivory wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge.
Third Floor Providing and fixing Table top Ivory wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge.
Fourth Floor Providing and fixing Table top Ivory wash basin of size 120x635x405mm rubber plugs and brass chain, with pillar cock, C.P.Angular stop cock long thread, continental including S.S. bottle trap of approved make having necessary pipe connection up to theoutside face of the wall.etc complete as directed by Engineer in charge.
Ground Floor Providing and fixing Ivory glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete.
First Floor Providing and fixing Ivory glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete.
Second Floor Providing and fixing Ivory glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete.
Third Floor Providing and fixing Ivory glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete.
Fourth Floor Providing and fixing Ivory glazed urinal of size 710x460x300mm with sensotronic concealed type flushing valve for urinal with complete kit having fittings, inlet pipe with stop tap, brackets for fixing the cistern, 32mm diameter P.V.C. flush pipe with fitting and flushing arrangement including lead soil pipe, lead trap & soil pipe connection upto the outside face of wall etc complete.
Ground Floor Providing and Fixing toilet set for differently Abled persons consist of Floor Mounted white vitreous china water Closet including 6 litre capacity white vitreous china flushing Cistern with raised soft-push button, white vitreous china wash basin of size 46 x 36 cm and one no SS 304 hinged rail 76 cms & three no SS 304of (Grab Bar) 60 cms all including cutting and making good the walls and Floor s wherever required ,seat cover, cistern & wash basin fittings,nuts, bolts and gasket etc complete as per the direction of Engineer-In-charge.
First Floor Providing and Fixing toilet set for differently Abled persons consist of Floor Mounted white vitreous china water Closet including 6 litre capacity white vitreous china flushing Cistern with raised soft-push button, white vitreous china wash basin of size 46 x 36 cm and one no SS 304 hinged rail 76 cms & three no SS 304of (Grab Bar) 60 cms all including cutting and making good the walls and Floor s wherever required ,seat cover, cistern & wash basin fittings,nuts, bolts and gasket etc complete as per the direction of Engineer-In-charge.
Second Floor Providing and Fixing toilet set for differently Abled persons consist of Floor Mounted white vitreous china water Closet including 6 litre capacity white vitreous china flushing Cistern with raised soft-push button, white vitreous china wash basin of size 46 x 36 cm and one no SS 304 hinged rail 76 cms & three no SS 304of (Grab Bar) 60 cms all including cutting and making good the walls and Floor s wherever required ,seat cover, cistern & wash basin fittings,nuts, bolts and gasket etc complete as per the direction of Engineer-In-charge.
Ground Floor Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete.
First Floor Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete.
Second Floor Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete.
Third Floor Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete.
Fourth Floor Providing and fixing stainless steel sink of size 600 x 510 x 200 mm incluidng coupling, outlet pipe, elbow and other necessary fitting, finishing etc. complete.
Ground Floor Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Spec No: As directed by Engineer in charge
First Floor Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Spec No: As directed by Engineer in charge
Second Floor Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Spec No: As directed by Engineer in charge
Third Floor Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Spec No: As directed by Engineer in charge
Fourth Floor Providing and fixing C.P. Angular stop clock with wall flange of approved make continental including necessary sockets/union nut etc. complete. Spec No: As directed by Engineer in charge
First Floor Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Second Floor Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Third Floor Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Fourth Floor Providing and fixing C.P. BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Ground Floor Providing and fixing sink cock with regular swinging spout (Wall/ Floor Mounted Model)with wall flange having flow rate upto 6.0 Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer incharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
First Floor Providing and fixing sink cock with regular swinging spout (Wall/ Floor Mounted Model)with wall flange having flow rate upto 6.0 Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer incharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Second Floor Providing and fixing sink cock with regular swinging spout (Wall/ Floor Mounted Model)with wall flange having flow rate upto 6.0 Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer incharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Third Floor Providing and fixing sink cock with regular swinging spout (Wall/ Floor Mounted Model)with wall flange having flow rate upto 6.0 Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer incharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Fourth Floor Providing and fixing sink cock with regular swinging spout (Wall/ Floor Mounted Model)with wall flange having flow rate upto 6.0 Litr/Minute of Jaquar/ Cera/ Hindware/ Perryware or equivalent make incluidng other necessary fitting, etc. complete as directed by Engineer incharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Ground Floor Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
First Floor Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Second Floor Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Third Floor Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Fourth Floor Providing and fixing C.P. 2 Way BIB cock with wall flange of approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Ground Floor Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete.
First Floor Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete.
Second Floor Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete.
Third Floor Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete.
Fourth Floor Providing and fixing 450mm x 550mm size superior type Belgium mirror with 16mm dia. nickel plated towel rod etc. complete.
Ground Floor Providing and fixing Hand shower (health faucet) with 8mm dia. 1m long flexible tube having wall hook with approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
First Floor Providing and fixing Hand shower (health faucet) with 8mm dia. 1m long flexible tube having wall hook with approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Second Floor Providing and fixing Hand shower (health faucet) with 8mm dia. 1m long flexible tube having wall hook with approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Third Floor Providing and fixing Hand shower (health faucet) with 8mm dia. 1m long flexible tube having wall hook with approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Fourth Floor Providing and fixing Hand shower (health faucet) with 8mm dia. 1m long flexible tube having wall hook with approved make including necessary sockets/ union nut etc. complete as directed by Engineer in charge.
Ground Floor Providing and fixing wall mixer with overhead shower, shower arm, hand shower with wall bracket having flow rate upto 12 liters/minutes of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including all necessary pipes, fittings etc. complete as directed by Engineer InCharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
First Floor Providing and fixing wall mixer with overhead shower, shower arm, hand shower with wall bracket having flow rate upto 12 liters/minutes of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including all necessary pipes, fittings etc. complete as directed by Engineer InCharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Second Floor Providing and fixing wall mixer with overhead shower, shower arm, hand shower with wall bracket having flow rate upto 12 liters/minutes of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including all necessary pipes, fittings etc. complete as directed by Engineer InCharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Third Floor Providing and fixing wall mixer with overhead shower, shower arm, hand shower with wall bracket having flow rate upto 12 liters/minutes of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including all necessary pipes, fittings etc. complete as directed by Engineer InCharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Fourth Floor Providing and fixing wall mixer with overhead shower, shower arm, hand shower with wall bracket having flow rate upto 12 liters/minutes of Jaquar/ Cera/ Hindware/ Perryware or equivalent make including all necessary pipes, fittings etc. complete as directed by Engineer InCharge. (Make shall conform to manufacturer's Green product and shall got approved from the Engineer In Charge.)
Ground Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
First Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Second Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Third Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Fourth Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Terrace Floor Providing and fixing 75 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Ground Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
First Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Second Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Third Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Fourth Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Terrace Floor Providing and fixing 100 / 110 mm dia stabilizer pipe / P.V.C. soil vent / waste pipe and with necessary fixtures and fitting such as bends, tees, single junctions, slotted vent, clamps etc. complete. (As per IS 13592-1992 Type B, 6 kg/sq.cm pipes are recommended for use in soil and waste discharge system)
Ground Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
First Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
Second Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
Third Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
Fourth Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
Terrace Floor Providing and fixing P.V.C. Rain water pipes of 160mm outer diameter and having wall thickness of 2.2 to 2.7 mm confirming to I.S. 13592-1992 including proper rainwater receiving recess with P.V.C. plug, bend, necessary fittings, such as, offsets, shoes, inluding fixing the pipe on wall using approved wooden cleats projecting 25mm to 40mm from face of wall a fixing with clips of approved quality and number ,filing the joint using rubber gasket with solvent cement and properly resting the shoe of pipes on C.C. or masonry blocks, including necessary scaffolding and maintenance for 3 yrs for any leakages or dislocations of pipes. All the P.V.C. fittings and additional 2 piece socket clips shall be got approved from engineer in charge etc. complete.
Ground Floor Providing and fixing 15 cm rigid uPVC Nahani trap (Multi Floor traps, water seal not less than 50 mm) including bend, connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use)
First Floor Providing and fixing 15 cm rigid uPVC Nahani trap (Multi Floor traps, water seal not less than 50 mm) including bend, connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use)
Second Floor Providing and fixing 15 cm rigid uPVC Nahani trap (Multi Floor traps, water seal not less than 50 mm) including bend, connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use)
Third Floor Providing and fixing 15 cm rigid uPVC Nahani trap (Multi Floor traps, water seal not less than 50 mm) including bend, connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use)
Fourth Floor Providing and fixing 15 cm rigid uPVC Nahani trap (Multi Floor traps, water seal not less than 50 mm) including bend, connectingpiece of UPVC pipe up to the outside face of wall ,making the good damaged surface and testing etc. complete ( Prior approval of sample and brand by Ex. Engr. is necessary before use)
Ground Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
First Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Second Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Third Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Fourth Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Terrace Floor Providing and fixing on walls/ceiling/Floor 20 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Ground Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
First Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Second Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Third Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Fourth Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Terrace Floor Providing and fixing on walls/ceiling/Floor 25 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Ground Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
First Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Second Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Third Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Fourth Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Terrace Floor Providing and fixing on walls/ceiling/Floor 32 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Ground Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
First Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Second Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Third Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Fourth Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Terrace Floor Providing and fixing on walls/ceiling/Floor 40 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Ground Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
First Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
Second Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
Third Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
Fourth Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
Terrace Floor Providing and fixing on walls/ceiling/Floor 50 mm dia. CPVC pipe with necessary fittings, remaking good the demolished portion etc. complete. Including removing existing pipe
Ground Floor Providing and making ISI Mark ferrule connection of 50 mm dia. to water main including ferrule coupling cast iron bell mouth cover, built in non return valve and fixing including excavation and reinstatement complete.
Ground Floor Providing and laying in trenches 50 mm dia. heavy grade having embossed as ISI Mark galvanised iron pipes of 6.33 kg/metre necessary fitting remaking good the demolished portion with filling trenches and with primer of anti-corrosive oil paint , 2 coats complete. Including removing existing pipe line if necessary and conveying and stacking the same in PWD chowky or as directed etc. complete.
Ground Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
First Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Second Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Third Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Fourth Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Terrace Floor Providing and fixing screw down for 20 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Ground Floor Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.Spec No: Bd.V.9 Page No. 555
First Floor Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.Spec No: Bd.V.9 Page No. 555
Second Floor Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.Spec No: Bd.V.9 Page No. 555
Terrace Floor Providing and fixing screw down for 25 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.Spec No: Bd.V.9 Page No. 555
Ground Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
First Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Second Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Third Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Fourth Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Terrace Floor Providing and fixing screw down for 32 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Ground Floor Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
First Floor Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Second Floor Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Terrace Floor Providing and fixing screw down for 40 mm dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Ground Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
First Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Second Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Third Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Fourth Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Terrace Floor Providing and fixing screw down for 50 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Ground Floor Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
First Floor Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Second Floor Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Terrace Floor Providing and fixing screw down for 65 mm dia. wheeled stop tap of brass including necessary sockets/ union nut complete.
Second floor Providing and fixing screw down for 80 mm. dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Terrace floor Providing and fixing screw down for 80 mm. dia. wheeled stop tap of brass including necessary sockets/union nut complete.
Ground Floor Providing and fixing reinforced cement concrete cover of size 90 cm x 45 cm with frame over inspection chamber etc. complete. Medium duty (140 kg)
Terrace floor Providing and fixing reinforced cement concrete cover of size 90 cm x 45 cm with frame over inspection chamber etc. complete. Medium duty (140 kg)
Ground Floor Providing and fixing 50mm diameter water meter with non-return valve including strainer, sockets/ union nut and including water meter box making locking arrangement and lock. [without chamber]
Ground Floor Providing and fixing 45 cm wide mild steel ladder of 40mm x 6 mm mild steel flat stringers and steps of 18 mm dia. mild steel bar for water tank including fixing it in (1:2:4) M-15 cement concrete block 60cm x 30cm x 30cm and painting the ladder complete. (Anti Corossive Paint)
Ground Floor Providing and fixing 40 mm. dia Ball cock medium type with PVC float including sockets and necessary fittings and tested as per municipal requirements etc. complete.
Ground Floor Providing and constructing Brick Masonry inspection trap Chamber 90cm x 45cm including 1:4:8 C.C foundation, 1:2:4 C.C. channels/half round glazed stoneware pipe channel, salt glazed stone-ware intercepting trap with rodding pipe set in 1:4:8 cement concrete block, brick masonry plastering inside and Outside, fixed in cement concrete with R.C.C. Cover medium duty 140 Kilogram. etc complete
Ground Floor Providing and constructing Brick Masonry inspection trap Chamber 90cm x 45cm including 1:4:8 C.C foundation, 1:2:4 C.C. channels/half round glazed stoneware pipe channel, salt glazed stone-ware intercepting trap with rodding pipe set in 1:4:8 cement concrete block, brick masonry plastering inside and Outside, fixed in cement concrete with R.C.C. Cover medium duty 140 Kilogram. etc complete
Ground Floor Providing and laying 100 mm dia salt glazed stoneware pipe including fittings such as bends, tees, single junction, double junctions laying, jointing (including excavation and refilling the trenches) complete.
Ground Floor Providing and laying concrete pipes of I.S.NP. class of 225mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete.
Ground Floor Providing and laying concrete pipes of I.S.NP. class of 300mm diameter in proper line, level and slope including necessary collars, excavation, laying, fixing with collars in cement mortar 1:1 and refilling the trench complete.
Ground Floor Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 450mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.
Ground Floor Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.
Ground Floor Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 900mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.
Ground Floor Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channels half round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140 kg with frame etc complete.
Ground Floor Providing and fixing Ductile iron Man Hole Covers / Strom Water Grating and Grating with frame of Various sizes, weight and types and load bearing capacity as per EN-124, equivalent NECO with prior approval of concerned Superitending Engineer.
Ground Floor RWH - Recharge Pit Providing and constructing recharge pit of 2.0m deep and 1.0m dia of pre-cast RCC rings with 6.5' dia x 25m deep borewell at the Floor of recharge pit including installation of combination of solid/perforated PVC casing pipe wrapped around with netlon mesh including 300mm thick sidefilling around outside of RCC rings (annular space) with 40mm size boulders including filling of recharge pit up to 0.5m depth with 25-75mm clean washed gravels from bottom up followed by 0.5m depth of 10-25mm of clean washed stones followed by 0.5m of washed river fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) including netlon mesh between each gravel/fine aggregate (natural sand/crushed sand VSI grade finely washed etc.) media layer including covering with RCC slab, manhole frame & cover, PVC rungs, PVC end-caps, fittings etc. including arrangement for inlet & outlet pipe excavation & backfilling as shown in the drawing.The rate shall be inclusive of all labour, material, wastage, scaffolding, transportation, taxes, including all leads, lifts at all levels. All material should be of approved make. All works complete as per the drawing, technical specification and direction of the Engineer in charge.
Ground Floor Providing and constructing on sewer, B.B. masonry circular manhole with concentric cone 1.2 M dia. at bottom and 0.5 M dia. at top and upto a depth of 2.00 M with 23 cm brick work in CM 1:4 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality FRP (Fibre-reinforced plastic). frame and cover of 56 cm dia.etc. complete as directed by Engineerin-charge.
Ground Floor Providing and constructing on sewer, B.B. masonry circular manhole concentric cone 1.5 M dia. at bottom and 0.5 M dia. at top and upto a depth of 5.00 M with 23 cm brick work, upto depth of 2 M from top and 35 cm thick brick work for balance depth in CM 1:4 proportion with 20 mm thick smooth plaster on both sides in CM 1:2 proportion excluding excavation including foundation concrete 250 mm thick and haunches and channels in C.C. 1:2:4 proportion, finishing channels in smooth rendering, providing C.I. dapuri type steps each weighing 5.5 kg., 1:2:4 coping and providing and fixing approved make and quality FRP (Fibre-reinforced plastic) frame and cover of 56 cm dia. etc. complete as directed by Engineerin-charge.
Ground Floor Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast FRP. frame and cover, etc. complete as directed by Engineer-in-charge.As above of 90 x 60 cm internal size and depth upto 1.2 M with FRP. frame and cover.
Ground Floor Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast FRP. frame and cover, etc. complete as directed by Engineer-in-charge. As above of 90 x 90 cm internal size and depth upto 1.2 M with FRP. frame and cover.
Ground Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
First Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Second Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Third Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Fourth Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Terrace Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 65mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Ground Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Third Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Fourth Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Terrace Floor Providing and Fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes of 80mm nominal outer dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer.
Ground Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
First Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Second Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Third Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Fourth Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating (Viking 41615) of Rectangular type with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Ground Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
First Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Second Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Third Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Fourth Floor Providing and Fixing it in position, Alighning to correct position, testing and commissioning of CP brass Grating of Close on Top type (Viking 45290) with openable circular lid 150 mm nominal size square 100 mm diameter of the inner hinged round grating. including setting in Floor with cement motor to match with Floor finish as per architect requirement complete including all accessories. All work Complete as per direction of the Engineer-in-Charge.
Providing uncoursed rubble stone masonry of trap/ granite/ quartzite/ gneiss metal in CM 1:5 for foundation of piers, abutments, wings etc. including bailing out of water, striking joints, scaffolding and watering etc. complete.
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite/quartzite/ gneiss metal for R.C.C. columns as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks, laying/pumping, compactionand roughening the surface if special finish is to be provided and curing etc. complete. (Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap/ granite / quartzite/ gneiss metal for R.C.C. slabs and landings as per detailed designs and drawings including steel centering, formwork, cover blocks, laying/pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete,(Excluding reinforcement and structural steel).with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Filling in plinth and Floor s with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc.complete.
Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 parts of stacked volume of earth after reduction by 20% : one part of stacked volume of sludge or manure after reduction by 8%),flooding with water, filling with earth if necessary, watering and finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as directed,within a lead of 50 m, lift up to 1.5 m complete (cost of sludge, manure or extra earth to be paid for separately)
Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment).
Providing internal cement plaster 12mm thick in single coat in cement mortar 1:4 without neeru finish to concrete or brick surfaces, in all positions including scaffolding and curing etc.complete.
Providing fine cement finish 1.5 mm thick over green plaster surface including scaffolding curing etc. complete.
Providing and fixing heavy duty inter locking concrete Grey paving blocks of 60 mm thickness of having a strength of 300 Kilogram/Sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaning etc. complete.
Providing and fixing mild steel grill gate with angle iron frame 65mm x 65mm x 10mm with iron bars at 150mm C/C and diagonal flats as per the detailed drawing including hinges, pivot block locking arrangement, welding riveting and oil painting of three coats of approved shade Weight of gate 35 Kilogram/Smt.
Providing and casting in situ / ready mix PCC M15 grade of trap metal for coping to head walls / parapet including centering, form work, compaction and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA with fine agreegates of required specifications (Natural sand / VSI sand finely washed etc )
Providing expansion joints in R.C.C. framed structure (exterior Columns) with plain premoulded filler 25 mm thick and 3mm thick aluminium plate, hold fast, fixing T. W. battens of internal face, finishing etc. complete as directed.
Providing and fixing of BITUFLEX CLOSE CELL FOAM of size 30 mm x 30 mm in double layer in the expansion joints in R.C.C. framed structure (Exterior column) with closed cell foam , applying TP-40 PRIMER on both the sides of concrete surface, filling the 25 mm x 25 mm gap with the POLYSEAL, highly flexible sealant and covering the joint with Polydee- LM, 150 mm width in 2 coats and fixing the aluminium plate of 100 mm wide and 3 mm thick on external face of column etc. complete.Note- for item One Number 9 and 10 Prior approval of Superintending Engineer is Necessary before execution of work.
Providing and errecting chain link fencing 1.6 metre height with galvanised iron chain link of size 50 x 50 milimetre 8 guage thick and fixed 75 milimetre above Ground level on vertical Mild Steel Angle of 40x40x6 milimetre size including excavating pits for foundation and embeded in cement concrete block of 1:4:8 mix of size 450x450x670 milimetre at 1.75 metre center to center with iron bar 16 milimetre diameter as hold fast including welding link with angle frame at 30 cm. c/c nuts and bolts and horizontal Mild Steel Angles at top and bottom of 25x25x5 metre size and vertical Mild Steel flat 35 x 5 metre and 25 x 5 metre horizontal including cross support of 40x40x6 metre Angles both sides at every corner or bends embeded in concrete blocks of 1:4:8 of size 450x450x670 milimetre including 3 coats of oil painting etc. complete.
Providing fly ash brick masonry with conventional / I.S. type fly ash bricks in C.M. 1:6 in foundation and plinth including bailing out water manually striking joints, racking out joints watering and scaffolding etc. complete.
Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources)
Providing and laying in situ cement concrete M -30 with tremix treatment for 200 mm thickness for Concrete Road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20 mm deep with necessary refilling with polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed drawing including fixing Polyethylene foam backer rod of required diameter ( excluding reinforcement) with coarsen and fine aggregate Using V.S.I.Quality Artifitial Sand etc. complete
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of sub-grade surface if required etc. complete.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Vibratory roller. to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2) mm Aggregate)
Providing and casting in situ or precast tapering R.C.C. M-20 Mountable type Kerb with gutter ( as per IRC 86 1983) embedded 125mm below ground level over M-10 PCC finished neatly with C.M. 1:2, setting the same in C.M. 1:2, including the required excavation in any strata and removing the excavated stuff any where in city and redoing the surface as specified and directed by Engineering In-charge. Using Concrete Batching and Mixing Plant
Ground Floor Providing and casting in situ or precast tapering R.C.C. M-20 Mountable type Kerb without gutter ( as per IRC 86 1983) embedded 125mm below ground level over M-10 PCC finished neatly with C.M. 1:2, setting the same in C.M. 1:2, including the required excavation in any strata and removing the excavated stuff any where in city and redoing the surface as specified and directed by Engineering In-charge. Using Concrete Batching and Mixing Plant
Ground Floor Providing and fixing in position TMT FE 500, 32 mm dia dowel bars precoated with anticorrosive epoxy paint of required Dia. 60 cms. Long and at 30.00 cm. C/C and wherever directed including handling, straightening, necessary cutting supported by TMT FE 500, chairs with proper alignment by using properly designed assembly of Bulkheads lubricating half length with bituminous paint as directed etc. complete.
Providing and fixing in position TMT FE 500, tie bars precoated with anticorrosive epoxy paint of 12 mm dia. 70 cms.long and at 30.00 cm. C/C and wherever directed including handling, straightening wrapping with paper of approved quality for half length, necessary cutting, handling, straightening , supported by assembly of TMT FE 500, chairs with proper alignment etc. complete.
Providing and filling 20 mm thick compressible fibre board in expansion joint complete as per drawings and technical specifications etc. complete.
Providing and filling joint sealing compound with coarse sand and 6% bitumen by weight as per drawings and technical specifications etc. complete.
Providing and fixing heavy duty inter locking concrete Grey paving blocks of 80 mm thickness of having a strength of 300 Kilogram/Sq.cm. of approved quality and shape on a bed of crushed sand of 25 to 30 mm thick including skirting joints and cleaning etc. complete.
Providing and applying Cold plastic paint two component rolled on surfacing material solvent free,high build two pack seamless,tough,skid resistant,material with has property of attaining 2.00mm thickness in single coat application white(or as required colour )based on glass and colour retaining acralic cross linking resin system for coloured road surfacing including surface cleaning and cost of all material etc. complete. (All inclusive on bitumen or concrete surface) work shall carried out as per IRC 35-2015 clause 2.2)
Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mmx25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and fixing, including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stoneaggregate 20 mm nominal size) complete as per design. adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture's permanent identification mark to be visible even after
Providing and fixing Ductile iron manhole cover of light/medium/heavy duty with frame of any size over inspection chamber etc. complete (Prior permission of S.E. is to be obtained before inclusion of this item in the estimate)
Providing and fixing 20 to 25 mm thick rough shahabad box type waterproofing for basement or underground Floor on a base of Cement concrete 1:3:6, including sub base of 2.50 centimeter thick Cement mortar 1:3 with conceal, secrete (RMW), Algae proof or other alike waterproofing liquids, raking of joints upto 35 mm depth, filling the joints with 6 mm size crushed metal, hand grouting with cement slurry, curing and cleaning, with 7 years guarantee on court fee stamp of Rs. 100/- with ponding test etc complete. (excluding Cement concrete 1:3:6 base concrete )
Providing and fixing 20 to 25 mm thick rough shahabad box type waterproofing treatment to vertical outside faces of Reinforced Cement concrete walls of basement or underground Floor including filling the gap of 25 mm between rough shahabad and R.C.C. walls with cement grout mixed with water proofing liquid Algae proof or other alike with one tile lift method, brushing the joints horizontally with cement slurry mixed with water proofing liquid for width 30 to 35 mm and sloping coping over topmost tile with cement mortar 1:3, butting the bottom most with Cement concrete 1:2:4 mixed with water proofing liquid, curing, with 7 years guarantee on court fee stamp of Rs.100/- with ponding test etc complete. (excluding Cement concrete 1:3:6 base concrete)
Providing and laying in situ M-25 cement concrete of trap / granite / quartzite / gneiss metal with 15% plum of trap stones for retaining walls and jetty etc. including necessary formwork, compacting, curing, bailing out water manually in tidal range etc. complete.ete.
Providing and laying Filter material underneath pitching in slopes complete as per drawings and technical specifications etc. complete.
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications etc. complete. (by stone/boulder)
College STP-30KLD
Hosptal STP-50KLD
Residential STP-150KLD
College STP-30KLD
Hosptal STP-50KLD
Residential STP-150KLD
Supplying, erecting & commissioning 2 pole RCCB 16/25A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying, erecting & commissioning 2 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying, erecting & commissioning 4 pole RCCB 16/25A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying, erecting & commissioning 4 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying, erecting & marking TPMCB 6A to 32A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking TPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking SPMCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking SPMCB 6A to 32A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Providing & erecting 3 Pole MCCB, 415 V, 100A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact. MCCB with phase barriers on both sides, insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB
Providing & erecting 3 Pole MCCB, 415V, 200A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact and MCCB should have phase barriers both sides, with insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB
Providing & erecting 3 Pole MCCB 415V, 250A, rated short-circuit breaking capacity 36 kA (Ics=100% of Icu) adjustable thermal (overload) setting and adjustable magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact and MCCB should have phase barriers both sides, with insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB
Supplying and erecting single pole and neutral distribution board (SPNDB), with 2 ways for incoming and 6 ways (6 poles) for outgoing SP MCBs, with door, 1.2mm thickness surface / flush mounted, IP 43 Protection on iron / GI frame as per specification no. SW-SWR/MCBDB
Supplying and erecting single pole and neutral distribution board (SPNDB), with 2 ways for incoming and 10 ways (10 poles) for outgoing SP MCBs, with door, 1.2mm thickness surface / flush mounted, IP 43 Protection on iron / GI frame as per specification no. SW-SWR/MCBDB
Supplying & erecting triple pole and neutral distribution board (TPNDB), SPMCB of 4 ways/phase (12 poles), with door, 1.2mm thickness, surface/flush mounted, IP 43 protection on iron/GI frame (horizontal busbar type) as per specification no. SW-SWR/MCBDB
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/ 4 pole MCCB as incomer & outgoing SP MCB (12 poles) or TP MCB of 4 ways (12 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/4 pole MCCB as incomer & outgoing SP MCB (24 poles) or TP MCB of 8 ways (24 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Supplying & erecting triple pole and neutral distribution board (TPNDB), SP/TP MCBs total 4 ways /12 Poles, with door, 1.2mm thickness surface/flush mounted, IP 43 Protection on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB
Supplying & erecting triple pole and neutral distribution board (TPNDB), SP/TP MCBs total 8 ways /24 poles, with door, 1.2mm thickness surface/flush mounted, IP 43 Protection on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 2 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 16 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 25 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 35 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 50 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 70 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 95 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 120 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 150 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½core 240 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3½ core 300 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 200 mm width & 75 mm height complete with necessary coupler plates & hardware.
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 300 mm width & 75 mm height complete with necessary coupler plates & hardware.
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 400 mm width & 75 mm height complete with necessary coupler plates & hardware.
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 500 mm width & 75 mm height complete with necessary coupler plates & hardware.
Supplying and erecting iron work, sheet metal work consisting of CRCA sheets, various sections of iron, plates, chequered plates, rods, bars, MS pipes, etc. for panel board or any other purpose with bending, cutting, drilling and welding complete erected at the position with necessary materials duly painted with one coat of red oxide and two coats of enamel paint to match the switchgears or as per directions by the authority.
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP
Supplying, installation and testing of maintenance free earthing comprising of Electrode of 17.2 mm diameter Low Carbon Steel with 250 micron molecular copper bonded earthing rod of Length 3m along with 25 kg Carbon based environment friendly back fill ground enhancing compound required to fill up the excavated earth with required quantity complete, and recording the results Specification no. EA-MOBI
Supplying and erecting copper strip of high purity required size used for earthing on wall and/or any other purpose with necessary copper clamps fixed on wall painted with bituminous paint with joints required. As per specification no. EA-EP.
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.
Supplying and laying HMS PVC conduit FRLS grade 20 mm dia. with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.
Supplying and erecting HMS PVC conduit FRLS grade 20 mm dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.
Supplying and erecting mains with 2x4 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying and erecting mains with 1x4 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying and erecting mains with 2x2.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying and erecting mains with 1x2.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places. as per specification No: WG-MA/BW
Supplying and erecting mains with 2x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Supplying and erecting mains with 1x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Point wiring for light/bell concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW
Point wiring for light/bell hybrid type (Surface type under false ceiling and concealed type for drops & switch boards on walls) in min 20 mm PVC conduit / casing n capping with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/HW
Point wiring for ceiling fan concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW
Point wiring for ceiling fan (Surface type under false ceiling and concealed type for drops & switch boards on walls) in min 20 mm PVC conduit / casing n capping with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/HW
Secondary point wiring for additional light/ bell point, concealed type in min 20 mm FRLS grade PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires with required accessories as per specification No: WG-PW/CW
Wiring for plug on board with Switch socket surface/concealed type, copper wiring and earthing and with modular accessories as per specification No: WG-PW/CW
Supplying and erecting modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete.
Supplying and erecting modular type switch 16A duly erected on provided plate and box with wiring connections complete.
Supplying and erecting modular type 3 pin 6A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting modular type 3 pin 6 / 16A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 3 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 6 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 8 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Supplying and erecting modular type blanking plate one module, duly erected on provided plate & box.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 12 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Supplying and erecting LED square / circular Max. 7W down lighter/ Panel Light having pressure die-cast aluminium housing, polystyrene diffuser having system lumens output of Min. 770 Lumens, min. efficacy of 110 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD<10%, p.f. >0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.
Supplying and erecting LED square / circular Max. 14 W down lighter/Panel Light having pressure die-cast aluminium housing, polystyrene diffuser having system lumens output of Min. 1500 Lumens, min. efficacy of 110 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD<10%, p.f. >0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.
Supplying and erecting LED Panel Light(600mm X 600mm) Max. 35 W having CRCA powder coated housing, polystyrene diffuser having system lumens output of Min 4200 Lumens, min. efficacy of 120 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., max. ripple of 5%, THD<10%, p.f. >0.95, operating range of 120-270V, surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50 including driver, having mounting arrangement with board for surface type or spring loaded mounting clips complete with 3 years warranty.
Supplying and erecting LED Strip light 5m Length Max. 45 W IP20 class having minimum lumens output of 800 Lumens/m, min. efficacy of 90 lumen/W, CRI>80, CCT upto 5000K, Beam Angle of 110 deg., THD<10%, p.f. >0.95, operating range of 230-270V, Life class of 30,000 Hrs. at L70B50, including driver with 1 year warranty.
Supplying and erecting LED Strip light 5m Length Max. 95 W IP20 class having minimum lumens output of 1600 Lumens/m, min. efficacy of 90 lumen/W, CRI>80, CCT upto 5000K, Beam Angle of 110 deg., THD<10%, p.f. >0.95, operating range of 230-270V, Life class of 30,000 Hrs. at L70B50 including driver with 1 year warranty.
Supplying and erecting CRCA powder coated corridor/passage light LED fitting (4 feet) Max. 17W with high transitivity diffuser with system lumens output of Min. 2000 lumens , min. efficacy of 120 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., Ripple<5%, THD<10%, p.f. >0.95, operating range of 120-270V, surge protection of 4 kV, Life class of 50,000 Hrs. at L70B50, including driver, with end caps on provided PVC Block / wooden board with 3 years warranty.
Supplying and erecting energy saving ceiling fan 230 V A.C. 50 cycles 1200 mm complete erected in position as per specification no. FG-FN/CF
Supplying and erecting cabin fan of A.C. 230 V. 50 cycles 250 mm. /300 mm. sweep complete with necessary brackets for fixing cabin fans, wire etc.
Supplying and erecting Energy Saving BLDC Ceiling fan 230 V A.C. 50 cycles 1200 mm, max. energy consumption of 28W having service ratio (CMM/W) of Min. 8 , PF>0.9, THD<10% with IR remote control/compatible speed regulator, Temperature Rise of Max. 40 deg. C, having external mounted control PCB completely erected in position as per specification no. FG-FN/CF
Supplying and erecting electronic type step regulator for ceiling fan 600/ 900/ 1200/ 1400 mm. sweep, complete erected on provided switch board.
Supplying and erecting fresh air cum exhaust fan of light duty 250 V A.C. 50 cycles 225mm. 1400 RPM rust proof body & blades, wire mesh, duly erected, complete.
Supplying, erecting, testing and commissioning of 10kVA capacity online pure sine wave, with backup time of 1 hrs. PWM & IGBT based UPS with 0.9 to unity output pf, 3 phase input & 3 phase output complete with all protections as per specification no. AP-UPS
Supplying, erecting, testing and commissioning of 20kVA capacity online pure sine wave, with backup time of 1 hrs. PWM & IGBT based UPS with 0.9 to unity output pf, 3 phase input and 3 phase output complete with all protections as per specification no. AP-UPS
Supplying and erecting 12V/26Ah SMF battery with battery terminal wire, duly charged with 24 months warranty complete
Supplying and erecting 12V/42Ah SMF battery with battery terminal wire, duly charged with 24 months warranty complete
Supplying and erecting 100 kVAr, 3 phase, 50 Hz., Power contactors Derated for microprocessor APFC controller with MPP / APP type capacitor with 525 V and having minimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In and minimum life 150000 hours with , consisting of suitable steps of MPP / APP type capacitor units with detuned aluminium filter 7% reactors with circuit breaker as main incomer and MCCB for each branch protection, as per specification no CP-ED/APFC
Supplying and erecting 200 kVAr, 3 phase, 50 Hz., Power contactors Derated for microprocessor APFC controller with MPP / APP type capacitor with 525 V and having minimum overcurrent capacity of 1.8 In, peak inrush current capacity 300 In and minimum life 150000 hours with , consisting of suitable steps of MPP /APP type capacitor units with detuned aluminium filter 7% reactors with circuit breaker as main incomer and MCCB for each branch protection, as per specification no CP-ED/APFC
Fabricating & Supply installing testing and commissioning of HOSTAL BLDG PANEL. INCOMER-1 :- 1 nos. 200 FP MCCB , INCOMER -2 :- 1 nos. 200 FP MCCB INCOMER -3 :- 1 nos. 63 FP MCB With 1 Sets of 250 Amps. Aluminium Bus bars MSEDCL CT Operated KWH Meter provision with colour coded heat shrinkable PVC sleeves 1 Set of RYB indicating lamps with individual MCB 4 No. OUTGOING FEEDER FOR MAIN PANEL - 40 A TPN MCB:- 11 Nos. 100A FP MCCB:- 2 Nos ,100 A FP ATS ( 1 NOS),100 TPN MCB ( 1 NOS), All the components shall be housed in a common cubical made of 16 swg. M.S.sheet .The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc completed.Panel shall be as per IS 61439
Fabricating & Supply installing testing and commissioning of MAIN LT PANEL for collage building INCOMER -1 : 1nos. 500 FP MCCB INCOMER -2 : 1nos. 500 FP MCCB INCOMER -3 : 1nos. 200 FP MCCB & 500 A FP ATS with 1 Sets of 630 Amps. Aluminium Bus bars with colour coded heat shrinkable PVC sleeves 1 Set of RYB indicating lamps with individual MCB 1 No. flush mounted panel meter suitable rated current transformers 1 No. 0-500V. All Incomer shall be with surge protection OUTGOING FEEDER FOR MAIN PANEL - 100 A TPN MCCB :- 5 NOS ,125 A TPN MCCB:- 2 NOS , 63 A TPN MCB:- 3 NOS , 315 A TPN MCCB :- 1 NOS ,40 A TPN MCB:- 1 NOS,25 A TPN MCB :-1 NOS, 160 A TPN MCCB :- 3 NOS. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet .The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc completed.Panel shall be as per IS 61439
Fabricating & Supply installing testing and commissioning of MAIN LT PANEL for hospital building INCOMER-1- 1 nos. 800 FP ACB INCOMER-2- 1 nos. 800 FP ACB INCOMER-3- 200 A FP MCCB with 1 Sets of 1000 Amps. Aluminium Bus bars with colour coded heat shrinkable PVC sleeves 1 Set of RYB indicating lamps with individual MCB 4 Nos 2 Nos of Multifunction Meters & 1 Sets of 1000Amps for DG set with mechanical & electrical interlocking. All Incomer shall be with surge protection OUTGOING FEEDER FOR MAIN PANEL - 315A TPN MCCB- 2 nos, 125 A TPN MCCB :- 3 Nos, 100 A TPN MCCB- 5 Nos, 63A TPN MCB :- 4 Nos, 40 A TPN MCB :- 3 Nos, 160 A TPN MCCB:- 2nos. 32A TPN MCB :- 2 Nos, All the components shall be housed in a common cubical made of 16 swg. M.S.sheet .The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom & top cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc completed. Panel shall be as per IS 61439
Fabricating & Supply installing testing and commissioning of 800 A ISOLATOR PANEL for Hospital building INCOMER -1 : 1nos. 800 FP ACB with 1 Sets of 1000 Amps. Aluminium Bus bars with colour coded heat shrinkable PVC sleeves 1 Set of RYB indicating lamps with individual MCB 1 No. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet .The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc completed .Panel shall be as per IS 61439
Fabricating & Supply installing testing and commissioning of 500 A ISOLATOR PANEL for collage building INCOMER : 1nos. 500 FP MCCB with 1 Sets of 630 Amps. Aluminium Bus bars with colour coded heat shrinkable PVC sleeves 1 Set of RYB indicating lamps with individual MCB 1 No. All the components shall be housed in a common cubical made of 16 swg. M.S.sheet .The panel shall be powder coated of approved colour both inside & out side. The panel shall have both bottom cable entry provisions and panel shall be mounted on Pedestal of 300 mm height with necessary accessories etc completed .Panel shall be as per IS 61439
Supplying, erecting, testing and commissioning self contained water cooler 230/250V 50Hz nominal cooling capacity of 80 litres per hour and storage capacity 120 litres with partially stainless steel body as per specification no. AP-WCR/WC
Supplying, erecting, testing and commissioning self contained water cooler 230/250V 50Hz nominal cooling capacity of 150 litres per hour and storage capacity 150 litres with partially stainless steel body as per specification no. AP-WCR/WC
Supplying and erecting ultra violet storage type water purifier (RO+UV+UF) with softener for safe drinking water consisting of UV germicidal tube of 8W capacity choke made of copper wire and two indicator lamps with output of purified water minimum 0.33 litre/min with activated carbon filter and softener operating on 230V, single phase A.C. supply with UV fail & filter change indication system .(for TDS more than 200)
Supplying & erecting conventional spike type air termination suitable to carry lightning stroke made up of heavy gauge 40 mm dia copper pipe of standard length with 5 Nos. copper spikes fixed on copper ball as air terminals duly threaded in copper pipe erected on provided foundation complete.
Supplying and erecting modular type computer Jack RJ45 with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying, installing and testing UTP connector (RJ-45) as per specification No. WG-NAS/UTPC.
Supplying and erecting unbreakable concealed type modular switch box with double mounting plate for 2 module duly erected flush to wall with required chiselling and finishing with cement mortar / POP as per required to match the background.
Supplying and installing cat-6 cable suitable for networking as per specification no. WG-COC/NC
Supplying and fixing 1 m UTP patch cord of Cat 6 type in position as per specification No. WG-COC/PC
Supplying and erecting 5m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.
Supplying and erecting 15m HDMI cord low voltage grade minimum 4k compliant to be laid in provided conduits with male/female 19 pin HDMI connectors complete.
Supplying and erecting modular pop up Box 8 module erected with provided AV/ HDMI , RJ 45,6 A electrical sockets and switch on provided table.
Supplying and fixing 24 port patch panel with tool-less keystone jacks in provided U Rack complete as per specification no. WG-NAS/PP
Supplying and fixing 6U wall mount rack (Dimension-DxWxH – 500x600x367 mm) as per specification No. WG-NAS/RAK
Supplying and fixing 9U wall mount rack (Dimension-DxWxH – 500x600x500 mm) as per specification No. WG-NAS/RAK
Supplying and fixing 12U wall mount rack (Dimension-DxWxH – 500x600x635 mm) as per specification No. WG-NAS/RAK
Supplying and fixing 15U wall mount rack (Dimension-DxWxH – 500x600x767 mm) as per specification No. WG-NAS/RAK
Supplying and fixing 17U floor mount rack (Dimension-DxWxH – 800x600x954 mm) as per specification No. WG-NAS/RAK
Supplying, fixing, and configuring 24 ports + 4 (SFP+) port, Managed Layer 2, POE Switch of , 370W, 6KV surge protection on ethernet port and console port for management erected in provided rack complete.
Supplying, fixing, and configuring 8-ports managed gigabit, Layer-2 switch, 10/100/1000 base-T, POE smart switch plus 2 SFP erected in provided rack complete.
Supplying, fixing, and configuring 24 ports, POE switch in provided rack as per specification No. WG-NWC/ENS
Supplying and erecting LSZH armoured multimode optical fibre cable with 12 fibres, core dia 50/125 µm (OM3), suitable up to 10 GBPS ethernet distance at 850 nm of wavelength, on wall/ceiling or laid in provided pipe/trench as per specification No. WG-COC/OFC
Supplying and erecting HMS PVC conduit FRLS grade 25 mm dia. with necessary accessories in wall/floor with chiselling appropriately as per specification No: WG-MA/CC.
Supplying and laying HMS PVC conduit FRLS grade 25 mm dia with necessary accessories in RCC work/false ceiling/false flooring as per specification No. WG-MA/CC.
Supplying and erecting modular type telephone socket one gang with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying, installing, testing & commissioning push button telephone instrument desk top/wall mount with caller ID & Speaker unit as per specification complete.
Supplying, installing, testing & commissioning IP telephone instrument as per specification complete.
Supplying, erecting & commissioning MDF Box 50x50 pairs made from min. 1.5mm thick MS sheet as per specification no. WG-TW
Supplying, erecting & commissioning MDF Box 100x100 pairs made from min. 1.5mm thick MS sheet as per specification no. WG-TW
Supplying, erecting & commissioning 10 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW
Supplying, erecting & commissioning 40 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW
Supplying, erecting & commissioning 50 pairs FR junction box with moulded plastic enclosure as per specification no. WG-TW
Supplying, erecting & commissioning 100 pairs M.S. junction box made from min. 1.5mm thick MS sheet as per specification no. WG-TW
Supplying & erecting 2 pair telephone copper cable 0.5 mm dia. with high density polyethylene insulation, polyester taped, Nylon Rip Cord & grey colour sheathed with FR PVC, conforming to ITD specification S/WS 113C laid in provided PVC casing capping/conduit as per specification No. WG-TW
Supplying & erecting 10 pair, 0.5 mm dia. jelly filled armoured telephone copper cable with poly-al laminate moisture barrier, polythene sheathed, G.S.Tape armoured polythene jacketed having laid in provided trench as per specification No. WG-TW
Supplying & erecting 50 pair, 0.5 mm dia. jelly filled armoured telephone copper cable with poly-al laminate moisture barrier, polythene sheathed, G.S.Tape armoured polythene jacketed having laid in provided trench as per specification No. WG-TW
Supplying & erecting 100 pair, 0.5 mm dia. jelly filled armoured telephone copper cable with poly-al laminate moisture barrier, polythene sheathed, G.S.Tape armoured polythene jacketed having laid in provided trench as per specification No. WG-TW
Supplying and installing, testing & commissioning of digital (hybrid) type EPABX of 6 x 32 extensions suitable upto 96 extensions complete.Note Add Rs. 38159.00 for additional 16 extension card for digital (hybrid) type EPABX
Supplying, installing, testing & commissioning digital (hybrid) type EPABX of 3 x 8 extensions complete.
Supply Installation commissioning of 4 MP Full HD IP Dome /Bullet Camera Image Sensor 1/3" 4 megapixel progressivescan CMOS Effective Pixels 2304 (H) × 1296 (V) Electronic Shutter Speed Auto/Manual 1-1/100000 s Min. Illumination 0.5 lux F2.1 (Color); 0 lux (IR LEDs on IR Distance - nUp to 100 ft (30 m) Day/Night -auto (ICR)/Color/BW Backlight Compensation - BLC/HLC/DWDR White Balance - Auto/Manual Gain Control - Auto/Manual Noise Reduction - 3D Privacy Masking- Up to 4 areas Lens verifocal Length- 2.8 -12 mm Horizontal Angle of View 92° 86°-28 Compression H.265 (Main/High/Baseline Profile) /MJPEG Resolution 3 MP (2304×1296) 1080p Main Stream 4 MP ,30 fps 16x Digital zoom 60 fps, Resolution- Verifocal lens, 320 db Corridor Mode Support Network Protocol IPv4/IPv6 HTTP HTTPS TCP/IP UDP UPnP ICMP IGMP RTSP RTP SMTP NTP DHCP DNS PPPoE DDNS FTP IP Filter QoS Compatibility -nONVIF Profile S CGI Max. User Access 20 users Mobile App - for iPhone iPad Android Phone and Tablet Power Supply PoE (802.3af) 12 V DC Working Environment -22°F to 140°F (-30°C to 60°C); 10% to 100% RH condensing Ingress Protection IP66 Vandal Resistance - IK10 Regulatory FCC Part 15B Class B (3 years warranty)
Supply and Installation of 8 TB (7200 RPM) Surveillance hard disk 8 TB storage capacity with SATA support 6GB/s NCQ 64 MB cache 3.5 inches
Supply,Installation,Testing & Commissioning of Allir one Computer For Factor - All-in-one Processor Type Core i5 Family Processor Spec 2.3 GHz Ram 8 GB Memory Technology DDR4 Computer Memory Type GDDR4 Hard Drive Size 1 TB Hard Disk Description HDD hard Drive Interface Serial ATA SSD 256 GE Additional Graphics Coprocessor Intel UHD Graphics 630 Graphics Chipsel Standing Screen display Size 21.5 Inches Connectivity Type Bluetooth Wireless Type Bluetooth 801.11ac. Hardware Platform Windows Operating System Windows 10 Professional Warranty - 3 years
Supplying, Erecting, Testing & Commissioning of Full HD commercial display DISPLAY-Screen Size 55-inch Aspect Ratio 16:9 Backlight Scanning 100Hz Resolution 1920 x 1080 pixels Viewing Angle178°/178° TERMINAL- VIDEO IN RCA X 1 AUDIO IN (L/R) RCA Pin Type X 2 HDMI IN HDMI 1.4 X 3 USB Input USB 2.0 X 2 RS232C Yes HDMI CEC Yes VGA IN Yes PC AUDIO IN Yes (1) (Share with AC)
Supplying, Erecting, Testing & Commissioning of Full HD commercial display DISPLAY-Screen Size 32-inch Aspect Ratio 16:9 Backlight Scanning 100Hz Resolution 1920 x 1080 pixels Viewing Angle178°/178° TERMINAL- VIDEO IN RCA X 1 AUDIO IN (L/R) RCA Pin Type X 2 HDMI IN HDMI 1.4 X 3 USB Input USB 2.0 X 2 RS232C Yes HDMI CEC Yes VGA IN Yes PC AUDIO IN Yes (1) (Share with AC)
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.
Supplying and installing armoured single mode optical fibre cable with 6 fiber, core dia 50/125μm (OS1/OS2) 10/40 GBPS speed in provided underground HDPE pipe complete.
Supplying and erecting M.S. pipe pole ‘B’ class 80 mm dia 6 m long with pole cap, base plate in provided foundation as per specification no. OH-PL/GIP
Making cement concrete foundation including excavation ( 45 x 45 x 120 ) cm deep in 1:3:6 cement concrete, 20 to 25 mm stone metal, (45 x 45 x 45) cm / 45 cm dia. x 45 cm height plinth duly plastered, with necessary curing and finishing complete. (for 6 m pole)
Supplying, installation, testing and commissioning of main fire pump (MFP / EP) suitable for water discharge of 1600 to 1800 LPM at 70 to 55 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 30kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal type, single stage, centrifugal/split casing pump of cast iron body & bronze impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/SSC/EP
Supplying, installation, testing and commissioning of jockey fire pump (JP) suitable for water discharge of 180 to 240 LPM at 70 to 50 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 5.5 kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal/vertical type, multi stage, centrifugal casing pump of cast iron body & bronze impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003)complete, as per specification no. FF-MFP/JP
Supplying, installation, testing and commissioning of main fire pump (MFP/DP) suitable for water discharge of 1600 to 1800 LPM at 70 to 50 m head driven by 45 HP or suitable HP capacity diesel engine at required working speed suitable for manual/automatic operation and consisting of following : (a) Horizontal type, single stage, centrifugal casing pump of cast iron body & bronze impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Water cooled with radiator, diesel engine conforming to relevant IS standard complete with auto starting mechanism, 12/24 volts DC electric starting equipment with battery of required AH capacity with necessary charger suitable to work on 230v, 50Hz AC supply, diesel tank of minimum 150ltr capacity with first filling of diesel up to 100% level with necessary piping with valves up to engine, exhaust pipe extended up to 10 m outside pump house duly insulated with 50 mm thick glass wool with 1.0 mm thick aluminium sheet cladding, residential silencer, instruments and protection as per standard specification, stop solenoid for auto stop in the event of fault with audio indications etc. as required. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with engine assembly and accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/SSC/DP
Supplying, installation, testing and commissioning of booster fire pump [BP] suitable for water discharge of 900 LPM at 35 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 7.5 kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal/vertical type, single/multi stage, centrifugal casing pump of cast iron body & bronze/CI impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation on with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d)Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/BP
Supplying, installation, testing and commissioning of booster fire pump [BP] suitable for water discharge of 450 LPM at 35 m head driven by electric motor 415 volts, 3 phase 50 Hz, AC supply of 5.5 kW or of suitable kW capacity for manual/automatic operation and consisting of following : (a) Horizontal/vertical type, single/multi stage, centrifugal casing pump of cast iron body & bronze/CI impeller with stainless steel shaft (SS410 grade), mechanical seal conforming to IS 1520. (b) Squirrel cage induction motor, TEFC, synchronous speed 3000 RPM, suitable for operation with IP 55 protection for enclosure, horizontal foot mounted type with Class-'F' insulation, conforming to IS-325. (c) M.S. fabricated common base plate, coupling, coupling guard, foundation bolts etc. as required. (d) Erected on provided suitable size cement concrete foundation duly plastered with anti vibration pads with perfect aligning, proper levelling complete pump set with accessories duly painted with two coats of synthetic enamel paint of fire red colour over a coat of primer (ISC code 536 as per IS 2932 of 2003) complete, as per specification no. FF-MFP/BP
outgoings, suitable for automatic & manual operation on 415V, 3 phase, 50Hz ac supply as per specifications the capacity of electric motor driven pump are as follows a. Main fire pump(MFP) having capacity of 22kW 1no (1 working) b. Jockey pump(JP) capacity of suitable capacity 2 nos(1 working +1 standby, alternate run per start in auto mode) comprises of the following features & switchgears: 1. Main incomer FP SFU having rotary handle with HRC fuses of suitable rating. 2. Electrolytic grade copper strips for busbar of suitable sizes for main incomer and branches to motor SFU's, starters & outgoing terminals with necessary accessories like stainless steel nut bolts with spring washers for connections, mounted on required no of epoxy or porcelain support insulators of suitable ratings etc. 3. Individual pump TPN SFU having rotary handle with HRC fuses of suitable rating. Add For main electric motor driven fire hydrant system pump of 30kW capacity & relevant capacity jockey pump add Rs 14277 (182320+14277)*1.05=206426.85)
Supplying & erecting D.O.L Starter suitable for 415 V, 3 phase 50 cycles with no volt coil and overload element with necessary materials and connected to supply up to 7.5 H.P.
Supplying & erecting D.O.L Starter suitable for 415 V, 3 phase 50 cycles with no volt coil and overload element with necessary materials and connected to supply for 10 H.P.
Making cement concrete foundation in 1:2:4 cement concrete with foundation bolts and nuts complete. (cost of wooden box is included) (for pumps).
Supplying and erecting 300 mm dia 1.5m in height air vessel / tank fabricated from min 5mm thick M.S. sheet complete as per specification no. FF-FFA/ACT
Supplying and erecting 20/25mm dia gun metal air release cock, with necessary G.I. coupling to be fitted on top of air vessel or on wet riser complete as per specification no. FF-FFA/ARV
Supplying and erecting 100 mm dia. pressure gauge , 0-300 PSI or 0-14 kg per cm square fitted with 12/15 mm dia. pad cock valve, erected with provided G.I. pipe, elbow etc. complete as per specification no. FF-FFA/PG
Supplying and erecting 12/15 mm dia pressure switch with provided isolation valve, G.I. nipple, elbow, etc complete as per specification no. FF-FFA/PS
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3 core 16 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3 core 4 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 3 core 6 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 200 mm width & 100 mm height comprising all required standard accessories.
Supplying and erecting G.I. pipe ‘C’ class ERW 25 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 50 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 65 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 75/80 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 100 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 150 mm dia with necessary fittings complete as per specification no. FF-PP
Supplying and erecting G.I. pipe ‘C’ class ERW 200 mm dia with necessary fittings complete as per specification no. FF-PP
Providing coating of bitumen paint & 4mm thick wrapping for underground 150 mm ring main of fire fighting system.
Excavating hard Rock or bituminous road by chiselling for preparing pit for pole / stay/earth plate / for laying cable/ pipe & clearing the site by removing debris & making the site as required complete.
Excavating hard murum / stone metal road by chiselling for preparing pit for poles stay or earth plates or for laying cables, pipes & clearing the site by removing debris & making the site as required complete.
Excavating soft murum / soft soil road by chiselling for preparing pit for poles stay or earth plates or for laying cables, pipes & clearing the site by removing debris & making the site good complete.
Supplying and erecting 150 mm dia cast iron foot valve ball type/flap type with strainer for negative suction complete as per specification no. FF-VL/FV
Supplying and erecting 100 mm dia Cast Iron end line strainer of T-Pot type flanged end pattern, PN16 pressure rating, screen of SS and end connection with flanged, for positive suction complete as per specification no. FF-VL/ELS
Supplying and erecting 200 mm dia Cast Iron end line strainer of T-Pot type flanged end pattern, PN16 pressure rating, screen of SS and end connection with flanged, for positive suction complete as per specification no. FF-VL/ELS
Supplying and erecting 75/80 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV
Supplying and erecting 100 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV
Supplying and erecting 150 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV
Supplying and erecting 200 mm dia. cast iron double flange sluice valve complete with PN16 pressure rating, as per specification no. FF-VL/SV
Supplying and erecting 50 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV
Supplying and erecting 75/80 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV
Supplying and erecting 100 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV
Supplying and erecting 150 mm dia. cast iron double flange butterfly valve of size complete with PN16 pressure rating, as per specification no. FF-VL/BFV
Supplying and erecting 75/80 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV
Supplying and erecting 100 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV
Supplying and erecting 150 mm dia cast iron double flange NRV complete with PN16 pressure rating, as per specification no. FF-VL/NRV
Supplying and erecting 25 mm dia gun metal gate valve complete with PN16 pressure rating, as per specification no. FF-VL/GV
Supplying and erecting 50 mm dia gun metal gate valve complete with PN16 pressure rating, as per specification no. FF-VL/GV
Supplying and erecting stainless steel single outlet hydrant valve fitted with necessary accessories complete as per specification no. FF-VL/HV
Supplying and installing wall mounting swinging hose reel drum fitted with 19 mm dia. 30m long high pressure polypropylene (Polyhose) along with necessary accessories complete as per specification no. FF-FFA/HV
Supplying and erecting 63mm dia, reinforced rubber lined (R.R.L.) hose pipe, 15m in length, fitted with necessary accessories complete as per specification no. FF-FFA/RRL
Supplying and erecting stainless steel branch pipe 63 mm dia fitted with 20 mm dia detachable hexagonal nozzle complete as per specifications no. FF-FFA/NZ
Supplying and erecting 150 mm dia fire brigade header suitable for supplying water in fire tank complete as per specification no. FF-FA/FBC
Supplying and erecting fire brigade header ( Siamese connection )of 150 mm dia, for supplying water in fire tank complete as per specification no. FF-FA/FMC
Supplying and erecting M.S./CRCA cabinet for housing Fire Brigade / SIEMESE connections (size 1250 x 400 x 300 mm.) made from 16 SWG sheet and angle iron 25 mm. x 25 mm. x 4 mm. having front doors with viewing glass (8" x 6") and locking arrangement with necessary fixing material such as rubber bidding etc. duly painted in post box red colour( Code 538 of IS 5)
Supplying and erecting brass orifice plate having 6 mm. thickness, 160 mm outer dia with required diameter of inner hole at every double outlet hydrant valve as per specification no. FF-FFA/OP
Supplying, erecting, testing and commissioning of quartzoid bulb sprinkler, 15 mm (½") dia. NBCM Body chrome finished, 68º C fixed temperature rating with deflector disc of conventional construction complete as per specification no. FF-SPR.
Supplying, erecting, testing and commissioning vane type water flow detector 75/80 mm dia. with 1) Visual switch activation 2) Rugged switch assembly 3) Heavy duty aluminium pipe saddles 4)Durable metal enclosure 5) Steel U bolts for secure mounting 6) Two SPDT ( Single pole double track ) synchronised switches 7) serviceable without draining pipes.
Supplying, erecting, testing and commissioning vane type water flow detector 100 mm dia. with 1) Visual switch activation 2) Rugged switch assembly 3) Heavy duty aluminium pipe saddles 4)Durable metal enclosure 5) Steel U bolts for secure mounting 6) Two SPDT ( Single pole double track ) synchronised switches 7) serviceable without draining pipes.
Providing Round bottom FIRE Bucket of 9 Litres capacity as per IS : 2546 made out of 24 gauge G.I. sheet with extra handle at bottom duly painted white inside and red outside with FIRE Mark, on provided stand/ wall hook.
Providing Floor mounting stand for keeping 4 Nos. of FIRE buckets 1500mm in length, 900mm in height frame made out of 30x30x4 mm angle iron with cross supports for legs, welded with 4 hooks and duly painted with one coat of red lead and two coats of silver paint.
Supplying & erecting Carbon Dioxide (CO2) fire extinguisher of 4.5 kg. capacity cartridge type conform to IS 2878 /15683 complete erected with necessary clamp made from 50 x 6 mm. M. S. flat with nut & bolts routed in wall complete.
Supplying and erecting ABC powder type fire extinguisher as per IS : 13849 /15683 of 6 kg capacity with necessary clamp for erection on wall.
Carrying out core cutting of size 3" to 5" dia x 15" length in the C.C./rock/stone wall with the help of specialized core cutting machine in proper manner and finishing the site as original.
Providing and fixing 150 mm dia installation valve with Hydraulic trim type automatic alarm to be connected with control valve drain and test valve as per manufacturer's recommendations . with accessories like water motor gong bell, Test & drain valve , Flow switch etc UL listed etc complete to satisfaction of Architect/ PM
Supplying, installation, testing & commissioning of sprinkler flexible pipe (UL Listed) of stainless steel complete with 15 NPT on reducer thread with maximum working pressure of 175 PSI test pressure of 875 PSI (Burst) with branch line (Inlet) 25mm NPTmale thread to sprinkler head (Outlet) 15mm NPT female thread with reducer, nipple, 2 side brackets,center bracket, stockbar of following sizes complete as required. (1500 mm long)
Providing, installation, testing & commissioning of adjustable rosette plate for 15mm dia in white finish UL Listed or FM approved complete as required
Providing and fixing 25 mm dia Inspection & Testing Assembly with 25mm gunmetal ball valve, gun metal sight glass bypass valve & connected to drain line etc complete as per drawing.
Supplying & installing auto glow (Viewing upto 15 Mtr length) fire signages viz Fire Hydrant, Fire Extinguishers, Fire Exit, Fire Door, Fire Hose Box etc. Size of 450 X 150 mm
Supplying & installing auto glow (Viewing upto 15 Mtr length) fire signages viz Fire Hydrant, Fire Extinguishers, Fire Exit, Fire Door, Fire Hose Box etc. Size of 300 X 100 mm
Supplying & installing auto glow (Viewing upto 15 Mtr length) fire signages viz Fire Hydrant, Fire Extinguishers, Fire Exit, Fire Door, Fire Hose Box etc. Size of 600 X 200 mm
Supplying, installing, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the 1 loop capacity and capable of supporting upto 250 devices and detectors per loop, with on-board LCD display with min 16 lines of text, operating at 230 V 50 HZ - AC with inbuilt Battery Backup of a minimum 24 hours in normal condition and 30 min in alarm condition, suitable provision for network connectivity, interfacing with third party equipment via a MODBUS/ OPC/ L-ON interface etc. conforming to IS 15908:2021, IS 2189: 2008, EN 54 & VDS / FM/ UL 864 (10th edition) with 3 years replacement warranty FF-AFAS/CP.
Supplying, installation, testing and commissioning of micro processor based intelligent addressable main fire alarm panel, central processing unit with the 4 loop capacity and capable of supporting upto 250 devices and detectors per loop, with on-board LCD display with min 16 lines of text, operating at 230 V 50 HZ - AC with inbuilt Battery Backup of a minimum 24 hours in normal condition and 30 min in alarm condition, suitable provision for network connectivity, interfacing with third party equipment via a MODBUS/ OPC/ L-ON interface etc. conforming to IS 15908:2021, ,IS 2189: 2008, EN 54 & VDS / FM/ UL 864 (10th edition) with 3 years replacement warranty FF-AFAS/CP.
Supplying, installing, testing and commissioning of repeater panel with suitable battery backup of a minimum of 24 hours in normal condition and 30 min in alarm condition, 80 backlit alphanumeric LCD display with inbuilt buzzer to indicate fault/fire alarm, manual control keys for silence/mute and to reset the FACP from the repeater station. Panel size shall not more than 175 x 275 x 65 mm conforming to EN 54 or UL approved with 3 years equipment replacement warranty FF-AFAS/RP
Supplying, installing, testing and commissioning of addressable optical smoke detector, single/twin LED’s with 360 degree view, suitable for low voltage 15 to 32 V DC two wires supply, in-built locking mechanism to check the removal and pilferage of the detector, in built isolation mode, start up current 300µA and alarm condition current shall be maximum 6.5 mA, operating temperature 0°C to 50°C, humidity 0-95% RH, IP 41, conforming to IS 2189: 2008, 11360_1985_Reff2020 EN 54 or UL Approved with 3 years equipment replacement warranty FF-AFAS/SD .
Supplying, installing, testing and commissioning of intelligent addressable thermal/ heat detector with rate of rise cum fixed temperature thermistor complete with base as required, suitable for temperature variations from - 20°C to 38 °C for fixed-heat and rate-of-rise type detectors whereas 0°C to 90°C for high heat type detectors, in built isolation mode, suitable for industrial/ kitchen/ boiler room etc. with 3 years equipment replacement warranty, IS : 2175-1988 reaffirmed 2000, IS 15908:2021 standards FF-AFAS/SD.
Supplying, installing, testing and commissioning of addressable manual call points ( break glass type/pull station type), made of addressable break glass plastic square in shape surface/flush mounted with "Break Glass" massage embedded on the glass, complete erected with mounting base and required accessories conforming to EN 54 or UL listed with 3 years equipment replacement warranty FF-AFAS/MCP.
Supplying, installing, testing and commissioning of addressable fire control/relay module complete as required, with 3 years equipment replacement warranty conforming to IS 5051Part 2 (Sec 1 to 3) : 1982 reed relays, EN 54 or UL Listed FF-AFAS/CRM
Supplying, installing, testing and commissioning of addressable fire monitor module complete as required. EN 54 or UL Listed with 3 years equipment replacement warranty conforming to IS 5051Part 2 (Sec 1 to 3) : 1982 Reed relays FF-AFAS/MM
Supplying, installing, testing and commissioning of addressable horn cum strobe sound/ hooter, output frequency 500 to 1000 Hz with dB as per Chart given in IS 15908:2021, with flashing at 1 Hz over the strobe’s entire operating voltage range EN 54, conforming to IS 2189: 2008, IS 15908:2021 standards with 3 years equipment replacement warranty FF-AFAS/SSH.
Supplying, erecting, testing and commissioning 120 W amplifier suitable to operate on 230 Volts A.C. / 12 Volts D.C. supply complete as per specification no. FF-PA/AFR
Supplying, erecting, testing and commissioning 15 to 30 Watts sound column or ceiling mounted complete as per specification no. FF-PA/SOC
Supplying, erecting, testing and commissioning of 2 core shielded cable complete as per specification no. FF-PA/MCC
Supplying, erecting, testing and commissioning of 0.5 sq. mm speaker wire complete.
Supplying, erecting, testing and commissioning of 10HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000m operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.
Supplying, erecting, testing and commissioning of 12HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000m operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.
Supplying, erecting, testing and commissioning of 16HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56° C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.
Supplying, erecting, testing and commissioning of 20HP, VRF/VRV air conditioning system outdoor unit (ODU) complies type-IV OEM standards working on HFC refrigerant R410A or other required/suitable green equivalent refrigerant, for minimum cooling capacity as delivering 100% capacity at 47° C, non stop cooling even at 56°C and coefficient of performance (COP) 3.00 to 4.00, modular type vertical hot air discharge suitable for longer piping range upto 1000 metre operation in cooling mode with inverter/digital VRF/VRV technology microprocessor based control compressor starter/control panel with scroll compressor, air cooled copper condenser coil of suitable shape for increasing maximum heat transfer area, rain protection cover, built in oil separator, accumulator and oil receiver, copper tube aluminium fin air cooled condenser, condenser fan with motor suitable for 415V±10%, 50 Hz, 3 phase power supply (all suitable for high ambient conditions), internal copper refrigerant piping, internal wiring and refrigerant, etc. all housed in powder coated weather proof cabinet complete.
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 1.0TR ( 441 cfm ) to 1.3TR (512 cfm ) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 1.5TR (512 cfm) to 1.8TR (618 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact/standard size) of nominal cooling capacity 2.0TR (618 cfm) to 2.3TR (671 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact / standard size) of nominal cooling capacity 2.6TR (918 cfm) to 2.8TR ( 1100 cfm ) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.
Supply, installation, testing and commissioning of VRF/VRV based ceiling suspended 4 Way cassette room/indoor unit (IDU-compact / standard size) of nominal cooling capacity 3.0TR (1100 cfm) to 3.2TR (1165 cfm) having EER as per BEE standards and specifications, suitable as per site requirement with swing louvers and adjustable blades from sides. IDU with drainage arrangements, fan, refrigerant liquid and refrigerant piping, cordless remote control, and fresh air port etc. IDU shall have anti corrosive coating suitable for coastal area in all respects suitable to operate on 1-phase, 230V, 50Hz, AC supply complete. The unit consisting with any additional refrigerant and oil charge as per requirement during installation.
Supplying, erecting, testing & commissioning fresh air intake system, ductable circular inline fresh air fan inlet unit having 300 cfm capacity with maintaining the static pressure minimum 20mm suitable to operate on 1 phase, 230V, 50Hz, A.C. supply complete.
Supplying, erecting, testing & commissioning fresh air intake system, ductable circular inline fresh air fan inlet unit having 1000 cfm capacity with maintaining the static pressure minimum 20mm suitable to operate on 1ph, 230 V, 50Hz, A.C. supply complete.
Supplying and erecting circular flexible/rigid PVC pipe duct of size 100mm dia, 4mm thickness with required couplers, reducers, T-joints, Y-joints elbows and necessary supports etc. with sealing with provided control/air flow regulating valves / dampers, filters at position complete.
Supplying and erecting an air flow regulating valves/dampers in provided flexible or rigid duct/pipe of 100 mm size with an alteration for existing flexible PVC pipe duct and necessary joints, sealing, couplings at position complete.
Supplying, erecting, testing and commissioning centralised programmable remote control panel (HMI) touch manager controls minimum 16 system of 64 ODU's can be controlled and up to 992 IDU's can be individually mounted and controlled indoor units having colour min 200mm size LCD touch panel, yearly schedule, power proportional distribution function, temperature limitation, history function complete erected on wall integrated with provided fire alarm system.
Supply, installation, testing and commissioning of manually operated, opposed blade, duct mounted, flanged volume control dampers of required sizes in GI construction with operating mechanism, mounting arrangement, rubber refrigerant kits etc. complete.
Supply, fabrication, installation and testing of flexible canvas connections constructed between ductable unit/dampers/ducting of suitable size with fire resist flexible double canvas sleeve complete.
Providing adhesive thermal insulation for supply return air duct with 19mm nitrile rubber insulation having R-value as per the prevailing provisions in ECBC-2017.
Providing and applying of acoustic insulation for air ducts with 25mm thick, 48 kg/cu.m fiber glass faced with RP tissue and covered with 26 SWG perforated aluminium sheets complete.
Supplying & erecting tile type modular diffuser made from aluminium sheet with powder coated matching to the ceiling shade for provided supply and return air complete.
Supplying and installation of high pressure grade required size copper connection Y or T- Joints/refnet complete erected on wall/ceiling with supports/raceways, Nitrile rubber insulation, painting etc. with brazing and testing for leakages confirming the normal operation of the VRV/VRF air conditioning system.
Supplying and installing of collar damper of galvanised iron material of upto 120 microns for anti corrosive resistance for supply air grill of suitable size.
Supplying and erecting aluminium powder coated linear grill of suitable size for width length without collar dampers having matching colour with the existing false ceiling and suitable for deflection of 15/30/45°.
Supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 41.3mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.
Supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 34.9mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 28.6mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultra violet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 22.2mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiation with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 19.1mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19 mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 15.9 mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 12.7mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 9.5 mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.
supplying, laying/fixing, testing and commissioning of appropriate nominal refrigerant copper pipe of 6.4mm dia (OD) for liquid line/suction line supply and return piping of suitable gauge (hard copper pipe for liquid main line and soft copper pipe for refrigerant) along with necessary supports, hangers, clamps, vibration isolators and fittings such as bends, tees, valves, gauges, strainers with insulation of 19mm thick elastomeric nitrile rubber along with application of multicoating of VRV/VRF piping for protection against mechanical damages, fungal growth, flame spread, water permeance and ultraviolet radiations with OEM standards of VRV/VRF air conditioning system complete.
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 4 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 16 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying and erecting mains with 2x1.5 sq.mm FRLSH copper PVC insulated wire laid in provided conduit/trunking/inside pole/Bus bars or any other places as per specification No: WG-MA/BW
Supplying, installing, testing & commissioning cassette type variable speed inverter technology with minimum 3 to 1 convertible mode for compressor room air conditioning unit 1.3TR to 1.7TR capacity having ISEER minimum 5.00 suitable to operate on 250V, 50 Hz, A.C. supply having 1 no of air handling unit hi-wall/floor mounting type complete with refrigerant R32/R410A having copper condenser, dust filter, self diagnosis feature, stabilizer free operation, noise level maximum 50dBA at position as per specification no. APAC/ WAC
Supplying, installing, testing & commissioning cassette type variable speed inverter technology with minimum 3 to 1 convertible mode for compressor room Air conditioning unit 1.8TR to 2.1TR capacity having ISEER minimum 5.00 suitable to operate on 250V, 50 Hz, A.C. supply having 1 no of air handling unit hi-wall/floor mounting type complete with refrigerant R32/R410A having copper condenser, dust filter, self diagnosis feature, stabilizer free operation, noise level maximum 50dBA at position as per specification no. APAC/ WAC
Supplying, installing, testing & commissioning cassette type room Air conditioning unit 2.8TR to 3.3TR capacity with refrigerant R32/R410A 415V, 50 Hz, A.C. supply having 1 no of air handling unit (Mega split) mounting type complete with temperature display on indoor unit, dust filter, noise level maximum 50dBA at position as per specification no. APAC/ WAC
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 12mm complete.
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 16mm complete.
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 22mm complete.
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 32mm complete.
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/ 4 pole MCCB as incomer & outgoing SP MCB (12 poles) or TP MCB of 4 ways (12 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Supplying & erecting triple pole and neutral distribution board (TPNDB), 3 pole/4 pole MCCB as incomer & outgoing SP MCB (24 poles) or TP MCB of 8 ways (24 poles), with door, 1.2mm thickness, surface/flush mounted, on iron/GI frame (vertical busbar type) as per specification no. SW-SWR/MCBDB1
Providing & erecting 3 Pole MCCB, 415 V, 100A, rated short-circuit breaking capacity 25 kA (Ics=100% of Icu), adjustable thermal (overload) setting and fixed magnetic setting with provided leads, provision for installation of shunt/UV/trip alarm contact. MCCB with phase barriers on both sides, insulation withstand capacity 800V, no line-load bias in provided enclosure/panel as per specification no. SW-SWR/MCCB
Supplying, erecting & marking TPMCB 6A to 32A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking TPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying & erecting CRCA sheet metal one way enclosures of 1.2mm thickness suitable for DP MCB /TP MCB/FP MCB/RCCB/RCBO complete erected on angle iron/GI frame.
Supplying, fixing and commissioning 4 pole RCBO 32/40A, with overcurrent, rated short-circuit breaking capacity (10 kA) and earth leakage protection, with 30/100/300 mA sensitivity and short circuit and earth leakage trip indication as per specification no SW-RCCB/RCBO
Supplying, fixing and commissioning 4 pole RCBO 63A, with overcurrent, rated short-circuit breaking capacity (10 kA) and earth leakage protection, with 30/100/300 mA sensitivity and short circuit and earth leakage trip indication as per specification no SW-RCCB/RCBO
Providing & erecting hot dipped galvanised cover suitable for perforated type Cable tray manufactured from 18 SWG (1.2 mm thick) GI sheet of 200 mm width & 20 mm height complete with necessary hardware.
Supplying and erecting fresh air cum exhaust fan of light duty 250 V A.C. 50 cycles 225mm. 1400 RPM rust proof body & blades, wire mesh, duly erected, complete.
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 12 mm for solar water heater/AC system.
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 16 mm for solar water heater/AC system.
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 22 mm for solar water heater/AC system.
Supplying and erecting elastomeric nitrile rubber / foam tube type sleeves for coating and insulating on provided PC / copper pipes having 9 mm thickness and inner diameter / sizes 32 mm for solar water heater/AC system.
Providing & erecting hot dipped galvanised ladder type cable tray manufactured from 16 SWG (1.6 mm thick) GI sheet of 200 mm width & 75 mm height complete with necessary coupler plates & hardware.
Supply, Installation, testing & commissioning of Galvanised Sheet (GI) Ducting Smacna Standards , turning vanes, with proper duct sealing etc with RTV duct Sealant, complete with supports ,Pressure tested with aqueous base smoke generator etc all as per specifications. 24 Guage (IS 655)
Supply, Installation, testing & commissioning of Galvanised Sheet (GI) Ducting Smacna Standards , turning vanes, with proper duct sealing etc with RTV duct Sealant, complete with supports ,Pressure tested with aqueous base smoke generator etc all as per specifications 22 Guage (IS 655)
Supply, Installation, testing and commissioning of Individual Electrical panel for each AHU The Panel should consist of Incomer MCCB, Contactors, DOL / Star - Delta starters, Relays, Push button ( On/Off/Reset ), Indicating Lamps ( Start / Stop / Trip ) etc.By- pass DOL starter to be included in case of VFD. Each panel should have VFD suitable to AHU motor rating with necessary instrument for cooling fan, inlet louvers & Filters for VFD , view panel, necessary relays & contactor, Potential free contacts for BMS application, interlocks etc. as per specification. Wiring/Control wiring from fire damper panel to AHU panel to fire damper motor & for micro switch for stopping the fan when fire damper closes(as required by application). For on/off/remote and local operation, 3 pole single throw switch shall be provided in No. AHU panel to facilitate override of the automatic operation. All starters shall be provided with suitable potential free contact for connections to the Building Automation System. Panel to monitor and control process parameters like Temperature,RH, Set points, Switchin ON and OFF of machines, feedback from sensors,Heater Thyristors, etc. Panel should have spare I/Os for future requirements.
Drain Piping - 25 NB PVC hard pipe having minimum 3 mm wall thickness, insulated with with 6 mm thick cross linked Polyethylene tube sections laminated with aluminium foil, joints to be sealed with solvent based adhesive & 2" aluminium adhesive tape.
Drain Piping - 40 NB PVC hard pipe having minimum 3 mm wall thickness, insulated with with 6 mm thick cross linked Polyethylene tube sections laminated with aluminium foil, joints to be sealed with solvent based adhesive & 2" aluminium adhesive tape.
Drain Piping - 50 NB PVC hard pipe having minimum 3 mm wall thickness, insulated with with 6 mm thick cross linked Polyethylene tube sections laminated with aluminium foil, joints to be sealed with solvent based adhesive & 2" aluminium adhesive tape.
Supply, installation, testing and commissioning of One to One ductable type, high static room/indoor unit (IDU) having nominal cooling capacity of 8.0TR (3200 cfm) having EER as per BEE standards with Outdoor Unit having sroll/Rotary compressor and specifications with evaporator fan with motor, copper tube aluminium fin evaporator coil, washable air filter, insulated drain tray, in built drain pump, expansion device, cordless remote control with necessary controls and electrical terminal to receive power supply, etc. having anti-corrosive coating suitable for coastal area and decorative slim dimension suitable for ceiling suspended arrangement with an electronic control console and any additional refrigerant and oil charge as per requirement during installation complete.
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 6mm complete.
Supplying & erecting seamless outside & inside, smooth, dry and clean copper pipe with ROHS compliant suitable for refrigerant having 22SWG thickness and inner dia/size 9mm complete.
SITC of Electric Traction Passenger Lift with • Rated capacity :- 10 Passenger/680Kg • Floors :- G+4 floor (5 Stops/5 Landings) • Travel :- 3 to 15 mtrs • Location of Lift Machine:- MR/MRL • Rated speed :- 1.0mps VS • Car/Landing door clear opening of 800 mm wide x 2000 mm high • Clear Car size of 1300 mm wide x 1350 mm deep x 2250mm high • Lift shaft available having clear size of 1900 mm wide x 2100 mm deep, 1500 mm Pit depth,4250 mm Overhead. • Doors type :- COPO/TOPO Doors with frame made from SS 304 grade solid(non-cladded) sheet of 1.5mm thick in hairline finish for car and all landing doors with SS door architraves/frames The lift doors shall have minimum 1 hour fire rating (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory). • Lift car enclosure made from SS 304 grade solid (non-cladded) sheet of 1.5mm, thick with hairline finish with frame made from MS girders, bracing of adequate size with minimum safety factor of 5, with Toe Guard Apron, with necessary false ceiling with adequate LED lights, blower/fan for ventilation & SS chequered plate flooring, handrails, mirror, emergency light etc. The lift car interior design shall be done as per the directions of engineer in charge. • COP with SS face plate having metallic push buttons with Braille code & luminous indicator around button with FPI, scrolling UP/DN LED indicator & with / without attendant key switch, OWD with audio-visual alarm, VAS in Marathi, Hindi & English with intercom system with telephone instrument in Lift car, LMR & FCC/ground floor. • LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings. • Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class. • ARD complete with necessary SMF VRLA batteries. • Fireman controller having fireman switch at fire Landing. • CCTV surveillance system comprises of 2 nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min.18” FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge. • Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength. • Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc. erected with necessary steel work. • Minor civil work such as alteration work if any necessary for erection of landing door frames and it's accessories e.g. sill, header, hole pass etc complete with plaster finish, civil work for erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails, providing and fixing steel girders/RCC work having adequate strength for mounting and hoisting lift machine etc. complete as per specification no. LFT. "• General: - Job includes entire procedure of obtaining all necessary erection permissions & ""License to Work the Lift"" from Electrical Inspector(Lifts) with submission to the Engineer In Charge. • The above rate includes Fully Comprehensive AMC for one year from the date of commissioning." A1-2 : For Lift having 800mm wide x 2000mm high clear entrance in 1.5mm thick SS 304 grade landing door [Two panel], this includes all necessary accessories like LOP's with UP/DN buttons-arrows-indicators, extension of guide rails, shaft wiring with trunking, travelling cables, main hoisting ropes/belts, & OSG rope landing doors with all accessories etc. necessary for the normal safe functioning of lift installation complete C2 -For Lift travelling above Sixth floor & up to Fifteenth floor
SITC of Electric Traction Passenger Lift with • • Rated capacity :- 4 Passenger/272Kg • Floors :- G+2 floor (3 Stops/3 Landings) • Travel :- 3 to10 mtrs • Location of Lift Machine:- MR • Rated speed :- 1.0 mps VS • Car/Landing door clear opening of 700/800 mm wide x 2000 mm high • Clear Car size of 1100 mm wide x 700 mm deep x 2250mm high • Lift shaft available having clear size of 1300 mm wide x 1900 mm deep, 1500 mm Pit depth, 4500 mm Overhead. • Doors type :- COPO/TOPO Doors with frame made from SS 304 grade solid (non-cladded) sheet of 1.5mm thick in hairline finish for car and all landing doors with SS door architraves/frames. The lift doors shall have minimum 1 hour fire rating (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory). • Lift car enclosure made from SS 304 grade solid (non-cladded) sheet of 1.5mm, thick with hairline finish with frame made from MS girders, bracing of adequate size with minimum safety factor of 5, with Toe Guard Apron, with necessary false ceiling with adequate LED lights, blower/fan for ventilation & SS chequered plate flooring, handrails, mirror, emergency light etc. The lift car interior design shall be done as per the directions of engineer in charge. • COP with SS face plate having metallic push buttons with Braille code & luminous indicator around button with FPI, scrolling UP/DN LED indicator & with / without attendant key switch, OWD with audio-visual alarm, VAS in Marathi, Hindi & English with intercom system with telephone instrument in Lift car, LMR & FCC/ground floor. • LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings. • Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters. The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class. • ARD complete with necessary SMF VRLA batteries. • Fireman controller having fireman switch at fire Landing. • CCTV surveillance system comprises of 2 nos minimum 2.0 MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 18” FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge. • Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength. • Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc. erected with necessary steel work. • Minor civil work such as alteration work if any necessary for erection of landing door frames and it's accessories e.g. sill, header, hole pass etc complete with plaster finish, civil work for erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails, providing and fixing steel girders/RCC work having adequate strength for mounting and hoisting lift machine etc. complete as per specification no. LFT. "• General: - Job includes entire procedure of obtaining all necessary erection permissions & ""License to Work the Lift"" from Electrical Inspector(Lifts) with submission to the Engineer In Charge. • The above rate includes Fully Comprehensive AMC for one year from the date of commissioning." A1-2 : For Lift having 800mm wide x 2000mm high clear entrance in 1.5mm thick SS 304 grade landing door [Two panel], this includes all necessary accessories like LOP's with UP/DN buttons-arrows-indicators, extension of guide rails, shaft wiring with trunking, travelling cables, main hoisting ropes/belts, & OSG rope landing doors with all accessories etc. necessary for the normal safe functioning of lift installation complete C2 -For Lift travelling above Sixth floor & up to Fifteenth floor
SITC of Electric Traction Passenger cum Stretcher/Hospital Lift with Rated capacity :- 20 Passenger/1360Kg • Floors :- G+2 floor (3 Stops/3 Landings) • Travel :- 3 to 10 mtrs • Location of Lift Machine:- MR • Rated speed :- 1.0mps VS • Car/Landing door clear opening of 1100/1200 mm wide x 2000 mm high • Clear Car size of 1300 mm wide x 1350 mm deep x 2250mm high • Lift shaft available having clear size of 2000 mm wide x 3000 mm deep, 1500 mm Pit depth 4250mm Overhead. • Doors type :- COPO/TOPO Doors with frame made from SS 304 grade solid(non-cladded) sheet of 1.5mm thick in hairline finish for car and all landing doors with SS door architraves/frames The lift doors shall have minimum 1 hour fire rating (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory) • Lift car enclosure made from SS 304 grade solid (non-cladded) sheet of 1.5mm, thick with hairline finish with frame made from MS girders, bracing of adequate size with minimum safety factor of 5, with Toe Guard Apron, with necessary false ceiling with adequate LED lights, blower/fan for ventilation & SS chequered plate flooring, handrails, mirror, emergency light etc. The lift car interior design shall be done as per the directions of engineer in charge. • COP with SS face plate having metallic push buttons with Braille code & luminous indicator around button with FPI, scrolling UP/DN LED indicator & with / without attendant key switch, OWD with audio-visual alarm, VAS in Marathi, Hindi & English with intercom system with telephone instrument in Lift car, LMR & FCC/ground floor. • LOP with SS face plate having recess/surface push button box for all landings with scrolling UP/DN LED indicator having metallic push buttons with Braille code & luminous indicator around button with CPI, Lift car arrival & next travel direction audio-visual indication at all landings. • Lift controller based on microprocessor/ PLC with VVVF Drive having closed loop control system, with IBMS compatible having necessary port. The controller shall have necessary protections such as overcurrent, overvoltage, over speed, overheat for all devices including lift motor and travel direction protection, protection for phase loss at input or output etc. various operation modes such as maintenance, change direction by attendant, full load bypass, VIP call operation, self levelling operation, call cancel facility, auto return to home landing, fireman evacuation operation, earthquake operation, door open/close operation from COP etc. The system can record information for minimum 30 latest faults, with real-time clock management and handheld keypad with LCD screen for view and setting of parameters, The control panel duly wired with proper size & strength, copper wire for power & control circuit, with provision for addition of floor/control card & allied accessories control panel having enclosure of 1.5mm CRCA sheet with powder coating with IP54 Protection class. • ARD complete with necessary SMF VRLA batteries. • Fireman controller having fireman switch at fire Landing. • CCTV surveillance system comprises of 2nos minimum 2.0MP FHD IP based vandal proof Dome camera in lift car & in LMR/inside lift shaft top aimed on Lift machinery & controller with NVR kept in LMR/FCC with HDR data backup for min. 90 days with min. 20" FHD TV monitor, to be kept in FCC/LMR as directed by Engineer In Charge. • Lift Machine of Gearless PMSM of suitable kW with duty cycle of minimum 120 starts/hr (with submission of necessary valid test certificate issued by NABL accredited or Independent test laboratory), with Traction pulley, OSG, electromagnetic brakes, entire assembly mounted on adequate size girders duly fixed on LMR floor/ shaft walls complete with main/diverter traction sheaves, suspension wire ropes/belts of adequate size & strength. • Other mechanical parts such as 'T' section adequate size guide rails for car & counter weight with brackets fasteners, counter weight frame with necessary blocks, buffers with necessary support arrangement, MS pit ladder etc. erected with necessary steel work. • Minor civil work such as alteration work if any necessary for erection of landing door frames and it's accessories e.g. sill, header, hole pass etc complete with plaster finish, civil work for erection buffers, erection of lift machinery, adequate size core cuts if required & scaffolding for erecting guide rails, providing and fixing steel girders/RCC work having adequate strength for mounting and hoisting lift machine etc. complete as per specification no. LFT. "• General: - Job includes entire procedure of obtaining all necessary erection permissions & ""License to Work the Lift"" from Electrical Inspector(Lifts) with submission to the Engineer In Charge. • The above rate includes Fully Comprehensive AMC for one year from the date of commissioning." A1-2 : For Lift having 800mm wide x 2000mm high clear entrance in 1.5mm thick SS 304 grade landing door [Two panel], this includes all necessary accessories like LOP's with UP/DN buttons-arrows-indicators, extension of guide rails, shaft wiring with trunking, travelling cables, main hoisting ropes/belts, & OSG rope landing doors with all accessories etc. necessary for the normal safe functioning of lift installation complete C2 -For Lift travelling above Sixth floor & up to Fifteenth floor
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 6 sq. mm. copper conductor complete erected with glands & lugs, on wall/ trusses/ pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 2 core 4 sq mm copper conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/CU
Supplying, erecting & marking DPMCB 6A to 32A, C-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking FPMCB 40A to 63A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & commissioning 4 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying, erecting & commissioning 2 pole RCCB 40A, electromagnetic type with 30/100/300 mA sensitivity with earth leakage trip indication complete as per specification no. SW-RCCB/RCCB
Supplying & erecting CRCA sheet metal one way enclosures suitable for DP MCB /TP MCB /FP MCB erected on angle iron/GI frame complete
Supplying and erecting modular type switch 6A / 10A duly erected on provided plate and box with wiring connections complete.
Supplying and erecting modular type 3 pin 6A multi socket with safety shutter, duly erected on provided plate and box with wiring connections complete.
Supplying and erecting PVC Surface modular switch box with double mounting plate for 4 module duly erected.
Supplying and erecting bulk head LED fitting max. 10W with high transitivity diffuser with system lumens output of min. 1100 lumens, min. efficacy of 110 lumen/W, CRI>80, CCT upto 6500K, Beam Angle of 120 deg., THD<10%, p.f. >0.95, operating range of 140-260V, in built surge protection of 2.5 kV, Life class of 50,000 Hrs. at L70B50, including driver, IP66, IK09 rated on provided PVC Block / wooden board with 3 years warranty.
Supplying and erecting Ceiling rose / Batten holder / Slanting holder / hanging cord switch / hanging bell push / pendant holder bakelite base 6A. erected on filled polypropylene board or polished double wooden block/ PVC junction box.
Providing earthing with copper earth plate size 30 x 30 x 0.315 cm complete with all materials, testing & recording the results as per specification no. EA-EP
Supplying and erecting annealed bare copper wire of high purity of required sizes used for earthing on wall with necessary copper clamps fixed on wall/cable/conduit with screws complete.
Supplying and erecting energy saving ceiling fan 230 V A.C. 50 cycles 1200 mm complete erected in position as per specification no. FG-FN/CF
Supplying and erecting electronic type step regulator for ceiling fan 600/ 900/ 1200/ 1400 mm. sweep, complete erected on provided switch board.
Supplying, erecting & marking DPMCB 6 A to 32 A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Point wiring for ceiling fan concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW
Point wiring for light/bell concealed type in min 20 mm FRLS grade HMS PVC conduit with 1.5 sq.mm. (2+1E) FRLSH grade copper wires, modular type switch, earthing and required accessories as per specification No: WG-PW/CW
Providing & erecting 3 m high (clear height) galvanised octagonal pole with foundation bolts having bottom of 130 mm A/F, top 70 mm A/F on provided foundation as per specification no. OH-PL/OPL
Providing & erecting 6 m high (clear height) galvanised octagonal pole with foundation bolts having bottom of 130 mm A/F, top 70 mm A/F on provided foundation as per specification no. OH-PL/OPL
Supplying and erecting 12.5 m (clear height) motorized high-mast (Top -150mm, Bottom- 360mm) hot dipped galvanized material with average minimum thickness 65 micron, made from high tensile structure grade steel as per BSEN - 10025 S 355/E350 & 3mm thickness, with base plate 25 mm thick x OD 520 mm grade as per IS-2062, pole made in single section & submerge arc welded, with lowering & raising motorized unit, wire rope stainless steel 316 grade 2 nos., 7x19 construction 5mm, SG-DG U clamps, double drum with assembly 250 kg, 5x2.5 Sq.mm. flexible copper cable with lantern carriage assembly suitable for max. 12 nos. luminaires and its control gear box, lightning arrestor, arrangement for fixing aviation light, high-mast with serial number, factory inspection report/test report of high-mast should be provided as per specifications on provided foundation J type stud/bolts with necessary accessories complete as per specification no. OH-PL/HM (excluding luminaries)
Supplying and erecting outdoor stand mounted feeder pillar for high-mast of the same manufacturer with 32A TPN MCB incomer, 24hr astronomical time switch with minimum 5 years battery backup, IP 54 and IK10 protection, 25 A TP contactor for automatic switching of luminaires, 2 no. 9A contactors and raise/lower push button, and provision for termination of adequate size of incoming and outgoing cables complete erected in min. 14 SWG CRCA sheet box with supporting angles, self lock, gasket and slanting top erected on CC foundation complete.
Supplying, erecting & terminating FR XLPE insulated, galvanised steel formed wire armoured (strip) cable 1100 V, 4 core 10 sq. mm. aluminium conductor complete erected with glands & lugs, on wall/ trusses/pole or laid in provided trench/ pipe as per specification no. CB-LT/AL
Supplying and laying (including excavation of suitable width & depth up to 90 cm) 50 mm outside dia. double wall corrugated pipes (DWC) of HDPE for enclosing cable below ground/road surface, to required depth complete.
Supplying and erecting integrated LED street light fitting 40 to 50W IP65 & IK08 class having single piece pressure die-cast aluminium housing, having system lumens output of Min. 4400 Lumens, min. efficacy of 110 lumen/W, CRI>70, CCT upto 6500K,THD<10%, p.f. >0.95, operating range of 140-270V, inbuilt surge protection of 10 kV, Life class of 50,000 Hrs. at L70B50, including driver complete with 3 Years warranty as per specification No FG-ODF/FLS2.
Supplying and erecting integrated LED street light fitting 23 to 25W IP65 & IK08 class having single piece pressure die-cast aluminium housing, having system lumens output of Min. 2300 Lumens, min. efficacy of 100 lumen/W, CRI>70, CCT upto 6500K, THD<10%, p.f. >0.95, operating range of 140-270V, inbuilt surge protection of 10 kV, Life class of 50,000 Hrs. at L70B50, including driver complete with 3Years warranty as per specification No FG-ODF/FLS2.
Supplying and erecting integrated LED flood light fitting Max. 120W IP65 & IK07 class having pressure die-cast aluminium housing, having system lumens output of Min.14500 Lumens, min. efficacy of 120 lumen/W, CRI>70, CCT upto 6500K, THD<10%, p.f. >0.90, operating range of 140-270V, inbuilt surge protection of 4 kV, Life class of 50,000 Hrs. at L70B50, including driver with U shaped bracket with 3 Years warranty as per specification No FG-ODF/FLS2.
Providing and erecting galvanised 1000mm single arm sword type bracket with FRP dome and ball as per specification no. OH-PL/PBKT
Providing and erecting galvanised 1000mm double arm sword type bracket with FRP dome and ball as per specification no. OH-PL/PBKT
Supplying and erecting PVC insulated PVC round sheathed 2.5 sq.mm (50 no. x 0.25 mm dia.) 3 core flexible multi stranded copper Industrial cable for voltage grade up to 1.1 kV
Supplying and erecting 6 to 32 A, 10kA, SPMCB suitable to fix in 1 module of modular switch in provided box complete & duly concealed with necessary material and connected.
Making M- 20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity as 10 T/sq.m at 1.5 m depth including supply of steel, concrete, excavation, fixing provided nut bolts with the help of template, duly plastered as per design complete (for 3 to 5m octagonal / conical GI pole).
Making M- 20 grade reinforced cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq.m at 1.5 m depth including supply of steel, concrete, excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 6m to 8m high octagonal /conical GI pole).
Making M- 20 cement concrete foundation by considering the safe soil bearing capacity at site as 10 T/sq. m at 2 m depth including excavation and fixing provided nut bolts with the help of template, duly plastered as per design complete (for 12.5 m raising lowering high mast).
Providing pipe type earthing with 40mm. dia. G.I. pipe or 20 mm dia. G.I. Rod complete with all materials testing and recording the results as per specification no. EA-EP
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP
Supplying & erecting Pressure Booster Pump, single phase, 50C/s, A.C. supply of 0.375 KW/ 0.5 H.P., With discharge of 120 to 12 LPM for 10 to 40 Mtr Head & 25 mm suction/ 25 mm delivery pipe, for Domestic Pressure boosting applications.
Supplying & erecting Minimum three & above star rated Centrifugal water pump (Monoblock), 230V, Single phase 50 cycles A.C. supply of 1.125 kW/1.5HP with discharge 198/50 Litres per Minute (LPM)) for head of 15/37.5 m & 40 mm suction/ 32 mm delivery pipe on provided C.C. foundation as per specification No. WP-CGP
Supplying & erecting Dewatering Monoblock pump set 415V, 3 phase, 50C/s, A.C. supply of 2.25KW/ 3 H.P., of 12 to 26 m head with 560 to 70 LPM discharge, 10.5mm Solid Handling Capacity, non clogging minimised abrasive wear, large impeller clearance & maintenance free pump set with water proof cable duly sealed with epoxy material built in protection to prevent the motor from burn out due to abnormal operation. specially designed high efficiency motor with F class insulation & the pump mechanically sealed in the oil chamber,. etc. complete as per specification no. DWP- SMP
Supplying and erecting 300 mm dia 1.5m in height air vessel / tank fabricated from min 5mm thick M.S. sheet complete as per specification no. FF-FFA/ACT
Supplying and erecting 12/15 mm dia pressure switch with provided isolation valve, G.I. nipple, elbow, etc complete as per specification no. FF-FFA/PS
Supplying & erecting automatic control panel for 1 Ph, 230 volt, A.C. Submersible/centrifugal pump set up to 3 HP consisting of DOL starter Of suitable relay range S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection.
Supplying & erecting automatic control panel for 3 Phase , 415 volt, A.C, Submersible/centrifugal pump set up to 7.5 HP consisting of DOL starter having relay range 9-14 AMP,S.P.P., Combined ammeter/ voltmeter, phase indicating lamp enclosed in CRCA powder coated Vibration proof enclosure with IP 54 protection. Control Panel should offer single phasing, phase reversal, phase imbalance etc .
Supplying & erecting four pole ON LOAD change over switch, 415V, 32A, open execution having staggered termination, phase barrier, shroud termination and terminal cover along with auxiliary contacts and ready to upgrade with fuse protection kit, rotary handle, operational current category AC23A complying to IS/IEC 60947-3 Part-1/3 .
Supplying and erecting two pole metal clad changeover switch 240 V, 32 A erected on angle iron/GI frame and duly connected with suitable wire leads complete
Supplying & erecting CRCA sheet metal one way enclosures of 1.2mm thickness suitable for DP MCB /TP MCB/FP MCB/RCCB/RCBO complete erected on angle iron/GI frame.
Supplying & erecting Water level controller 230/415 V, A.C. , Four way under ground & Over head tank operation only.
Supplying & erecting Float sensor switch for water level controller working on 250V & rated current 8A, with 2 mtr. wire & High quality of wire & plastic body.
Supplying & erecting flat flexible 3 core 4 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete.
Supplying & erecting flat flexible 3 core 1.5 sq.mm PVC sheathed submersible type copper cable suitably clamped at fixed intervals with column pipe assembly complete.
Supplying, erecting & marking DPMCB 6 A to 32 A, B-series with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting & marking TPMCB 6A to 32A, with rated short - circuit breaking capacity (Icn) 10kA in provided distribution board as per specification no. SW-SWR/MCB
Supplying, erecting, testing and commissioning 11KV HT metering cubical (compact / vertical type) approved by MSEDCL / licensee fabricated with 2 mm (14 SWG) M.S. sheets with supporting angle, painted with powder coating / epoxy paint of required shade, copper bus bar size 25 x 6 mm, heavy duty mechanical lock, with counter meter for measuring no of times the opening of meter door, top side cover (CT, PT cover) interlock with meter door, epoxy casted 3 nos. CT having required ratio between 10/5A to 50/5A, VA10 or 15, Class 0.5S, epoxy casted 3 nos. PT having ratio 11000/V3/110/V3 VA 50, Class 0.5 suitable for provided trivector meter, and provision for incoming and outgoing cables complete duly tested by licensee with necessary test certificates and erected on provided plinth/ cc foundation.
Supplying, erecting, testing & commissioning 11kV, 630A, 21kA/3sec, 2 way Indoor/outdoor, extensible motorised SCADA compatible RMU, internal arc tested consisting of 1 no. feeder with 1 LBS and 1 no. feeder with 1 VCB compliant to IEC 62271 -100,2 00 and 102, as per specification no. SW-HTS/RMU SCADA
Supplying, erecting, testing & commissioning 11kV, 630A, 21kA/3sec, 4 way outdoor, extensible motorised SCADA compatible RMU, internal arc tested consisting of 2 nos. feeder with 2 LBS and 2 nos. feeder with 2 VCB compliant to IEC 62271 -100, 200 and 102, as per specification no. SW-HTS/RMU SCADA
Supplying, installing, testing & commissioning 3 phase, 11/0.433 kV, 50 Hz., 315 kVA, Mineral oil immersed and naturally cooled outdoor type, Copper wound Non-sealed transformer delta/star connected with additional neutral brought out on load side, temperature rise should not exceed 45℃ by thermometer in oil and 50℃ by the resistance method in winding at full load rating, using type A winding insulation (kraft paper) with HV tapping (with off load tap changer) off load +5 to -10 in steps of 2.5%,+5 to -10 in steps of 2.5%, having 7 number of tap positions with standard accessories complete with test certificate with losses below 1025 Watts at 50% load, 3100 Watts at 100% load as per IS:1180 (part 1) : 2014 with necessary permissions of Electrical Inspector, as per specification no SS- TR-NSL.
Supplying, installing, testing & commissioning 3 phase, 11/0.433 kV, 50 Hz., 500 kVA, Mineral oil immersed and naturally cooled outdoor type, Copper wound Non-sealed transformer delta/star connected with additional neutral brought out on load side, temperature rise should not exceed 45℃ by thermometer in oil and 50℃ by the resistance method in winding at full load rating, using type A winding insulation (kraft paper) with HV tapping (with off load tap changer) off load +5 to -10 in steps of 2.5%, having 7 number of tap positions with standard accessories complete with test certificate with losses below 1510 Watts at 50% load, 4300 Watts at 100% load as per IS:1180 (part 1) : 2014 , with necessary permissions of Electrical Inspector, as per specification no SS- TR-NSL.
Supplying , erecting & terminating XLPE insulated, galvanised steel formed wire armoured (strip) cable 11 kV(E), 3 x 95 sq. mm. aluminium conductor laid in provided trench / pipe as per specification no. CB-HT
Supplying , erecting & terminating XLPE insulated, galvanised steel formed wire armoured (strip) cable 11 kV(E), 3 x 240 sq. mm. aluminium conductor laid in provided trench / pipe as per specification no. CB-HT
Providing and erecting Heat shrinkable indoor termination kit for 11 kV ( E ) XLPE HT cable 3x240 to 300 sq. mm. with necessary material as per specification no. CB-JT/HT
Providing and erecting Heat shrinkable out door termination kit for 11 kV ( E ) XLPE HT cable 3x240 to 300 sq. mm. with necessary material as per specification no. CB-JT/HT
Supplying & erecting cast iron cable indicator plate buried along with route of cable for PVC / XLPE armoured cable as per specification No. CB-CIP
Making trench in hard murum/Tar road having 0.9 m depth and minimum 0.3mtr width for laying provided cables of voltage range 3.3 kV to 11 kV complete as per specification No. CW-EXN-CTR
Providing earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover complete with all materials, testing & recording the results as per specification no. EA-EP
Providing earthing with copper earth plate size 60 x 60 x 0.315 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover with minimum 25 kg Carbon based environment friendly back fill Ground Enhancing compound complete with all materials, testing & recording the results as per specification no ESE -LA
Supplying and erecting copper strip of high purity required size used for earthing on wall and/or any other purpose with necessary copper clamps fixed on wall painted with bituminous paint with joints required. As per specification no. EA-EP.
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.
Providing printed instruction chart for treating persons suffering from electric shock, printed in English & Marathi and duly laminated complete.
Providing pair of duly tested rubber hand gloves as per IS :47705 suitable for working up to 22 kV supply complete.
Supplying standard first aid box with necessary antiseptic cream, medicine for use on wounds due burn, crepe bandage, gauge bandage, medicated ready to use bandage (Band-Aid) adhesive tape for medicinal use, scissors, anti-septic solution, etc. (All above contents shall be of standard makes)
Supplying and fixing PVC synthetic elastomer electrically insulating mat with class A insulation conforming to IS: 15652 – 2006 having 2 mm thickness up to 3.3 kV
Supplying, installing, testing and commissioning of 100 kWp ON-GRID Solar PV System / Plant consisting Solar PV Poly Crystalline Panel (335 Wp X 300 Nos.) and Solar ON-GRID Inverter of similar capacity (THD<3%) with interconnecting wires / cables up to solar ON GRID inverter, proper base plate, canopy box to house Inverter and necessary accessories i.e. ACDB/ DCDB , MCB etc. wiring up to solar Inverter in casing and capping, display board, sign board, two distinct earthing, lightning arrester, liaisoning charges, remote monitoring system with maintaining card / chip for 5 years including net charges for RMS System, complete up to net meter Installation and export to the grid with 5 year ON-SITE warranty and fully comprehensive maintenance contract as per Specification no. ESD-RT-ONG.
Supplying, installing, testing and commissioning of 20 kWp ON-GRID Solar PV System / Plant consisting Solar PV Poly Crystalline Panel (335 Wp X 60 Nos.) and Solar ON-GRID Inverter of similar capacity (THD<3%) with interconnecting wires / cables up to solar ON GRID inverter, proper base plate, canopy box to house Inverter and necessary accessories i.e. ACDB/ DCDB , MCB etc. wiring up to solar Inverter in casing and capping, display board, sign board, two distinct earthing, lightning arrester, liaisoning charges, remote monitoring system with maintaining card/chip for 5 years including net charges for RMS System, complete up to net meter installation and export to the grid with 5 year ON-SITE warranty and fully comprehensive maintenance contract as per Specification no. ESD-RT-ONG.
Supplying and erecting AC three phase HT CT multifunction net meter DLMS compliance of accuracy class 0.5, 3x 63.5V, 50Hz, with backlit LCD display, optical port & RS 232 port( measures import kWh, kVAh, export kWh, kVAh, net kWh, kVAh, V, I, kW, 6 months history of energy, load survey, TOD, tamper detection & logging, power ON/OFF events, instantaneous parameters of rating 1/5A with display in absence of power) with wiring connections and mounting hardware on provided panels complete with calibration certificate from manufacturer.
Supplying and erecting AC three phase LT CT multifunction net meter DLMS compliance of accuracy class 0.5, 3 x 240V, 50Hz, with backlit LCD display, optical port & RS 232 port (measures import kWh, kVAh, export kWh, kVAh, Net kWh, kVAh, V, I, kW, 6 months history of energy, load survey, TOD, tamper detection & logging, power ON/OFF events, instantaneous parameters of rating 1/5A with display in absence of power) with wiring connections and mounting hardware on provided panels complete with calibration certificate from manufacturer.
Supplying, erecting, testing and commissioning of diesel generating set with alternator of 100 kVA output continuous rating, 3 Phase, 415 V, 50c/s 0.8 p. f. A.C supply, a totally enclosed air cooled / liquid cooled multi-cylinder diesel engine developing suitable BHP at 1500 rpm with 10% overload for 1 hour in 12 hours, along with standard accessories, self-excited, self-regulated, screen protected alternator with static excitation system running at 1500 RPM as per IS 4722-2001 with voltage regulation +/- 5 %, with performance class G2 and maximum fuel consumption 17.4 Ltr/hr @75% loading. Both the engine and alternator direct coupled on a common fabricated steel base frame and mounted on anti-vibrating pads with standard control panel comprising meters, switchgears, indicators connected with suitable wires/cables, the complete set enclosed in composite Acoustic enclosure as fully assembled integral unit made of 16 SWG CRCA Sheet, sound absorbing material to restrict sound level up to 75 dB at 1.0 m, provided with first filling of oil, diesel not less than 230 Ltr etc. on provided M20 Grade CC Foundation as per specification no. GEN-DG
Supplying, erecting, testing and commissioning of diesel generating set with alternator of 320 kVA output continuous rating, 3 Phase, 415 V, 50c/s 0.8 p. f. A.C supply, a totally enclosed air cooled / liquid cooled multi-cylinder diesel engine developing suitable BHP at 1500 rpm with 10% overload for 1 hour in 12 hours, along with standard accessories, self-excited, self-regulated, screen protected alternator with static excitation system running at 1500 RPM as per IS 4722-2001 with voltage regulation +/- 5 %, with performance class G2 and maximum fuel consumption 54.89 Ltr/hr @75% loading. Both the engine and alternator direct coupled on a common fabricated steel base frame and mounted on anti-vibrating pads with standard control panel comprising meters, switchgears, indicators connected with suitable wires/cables, the complete set enclosed in composite Acoustic enclosure as fully assembled integral unit made of 16 SWG CRCA Sheet, sound absorbing material to restrict sound level up to 75 dB at 1.0 m, provided with first filling of oil, diesel not less than 480 Ltr etc. on provided M20 Grade CC Foundation and obtaining necessary approval from Electrical Inspector as per specification no. GEN-DG
Supplying, erecting, testing and commissioning of diesel generating set with alternator of 500 kVA output continuous rating, 3 Phase, 415 V, 50c/s 0.8 p. f. A.C supply, a totally enclosed air cooled / liquid cooled multi-cylinder diesel engine developing suitable BHP at 1500 rpm with 10% overload for 1 hour in 12 hours, along with standard accessories, self-excited, self-regulated, screen protected alternator with static excitation system running at 1500 RPM as per IS 4722-2001 with voltage regulation +/- 5 %, with performance class G2 and maximum fuel consumption 81.90 Ltr/hr @75% loading. Both the engine and alternator direct coupled on a common fabricated steel base frame and mounted on anti-vibrating pads with standard control panel comprising meters, switchgears, indicators connected with suitable wires/cables, the complete set enclosed in composite Acoustic enclosure as fully assembled integral unit made of 16 SWG CRCA Sheet, sound absorbing material to restrict sound level up to 75 dB at 1.0 m, provided with first filling of oil, diesel not less than 690 Ltr etc. on provided M20 Grade CC Foundation and obtaining necessary approval from Electrical Inspector as per specification no. GEN-DG
Supplying, erecting, testing and commissioning of microprocessor based AMF panel suitable for diesel generating set of above 82.5 kVA up to 100 kVA capacity Three phase, 415 Volts, 50Hz A.C. with all standard features, safeties etc as per specification no. GEN-AMF.
Excavating hard Rock or bituminous road by chiselling for preparing pit for pole / stay/earth plate / for laying cable/ pipe & clearing the site by removing debris & making the site as required complete.
Supplying and erecting fencing of section having size 2450 mm in height from ground level and 1200 mm width with angle iron frame work erected in CC foundation and painted complete as per specification no SS-AS/FSG
Supplying and erecting 50 x 50 x 6 mm angle iron as corner support 2m long fixed at the middle of the fencing frame and the other side inclined at 30 degree angle, in cement concrete foundation of 15 x 15 x 40 cm complete duly painted with one coat of red oxide and two coats aluminium paint complete.
Supplying and erecting double leaf hinged door each 1500 mm in width x 1850 mm in height using B class, GI pipe with angle iron supports, chain link wire mesh (jali) complete supported on channel iron, erected in foundation, and painted complete as per specification no SS-AS/DLD
Providng earthing with galvanized iron earth plate size 60 x 60 x 0.6 cm complete with all materials, testing & recording the results as per specification no. EA-EP
Providing earthing with copper earth plate size 60 x 60 x 0.315 cm with funnel with a wire mesh for watering and brick masonry block C.l. cover with minimum 25 kg Carbon based environment friendly back fill Ground Enhancing compound complete with all materials, testing & recording the results as per specification no ESE -LA
Supplying and erecting copper strip of high purity required size used for earthing on wall and/or any other purpose with necessary copper clamps fixed on wall painted with bituminous paint with joints required. As per specification no. EA-EP.
Supplying and erecting GI strip of high purity required size used for earthing on wall and/or any other purpose with necessary GI clamps fixed on wall painted with bituminous paint with joints required. As per specification no EA-EP.
Making cement concrete foundation in 1:3:6 cement concrete, (20 to 25) mm. stone metal duly plastered with necessary curing for complete. (pole muffing or any other purpose).
Harsh Constructions Pvt Ltd