Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹37.7 L
EMD Value
₹38,000
Closing Date
16 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Rural Works Division,Jajpur
Construction of Sub-Center Building at Gourapur under Korei Block for the year 2023-24
2025_CERWI_122881_2
Tender Online 12 JJPT of 2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
JAJPUR
Please refer Tender Documents
2 documents required · 2 mandatory
₹6,000
₹38,000
Yes
9 Dec 2025
9 Dec 2025
17 Dec 2025
9 Dec 2025
16 Dec 2025
9 Dec 2025
9 Dec 2025 - 15 Dec 2025
Filling in foundation and plinth with sand, watered & rammed including all cost of materials, labours, conveyence, etc all complete as per the direction of E.I.C
Cement concrete (1:3:6) with 4cm size crusher broken hard granite metals including all cost of materials, labour, conveyance, royality, watering, curing etc. all complete as per the direction of E.I.C
Providing and laying Reinforced cement concrete of M-20 grade with 20mm and down grade clean crusher broken granite chips aggregate of approved quality from approved quarry including hoisting, lowering & levelling in position to required level in each layer not exceeding 15cm thick including frame work where necessary ramming using vibrator to proper slope and levelling curing dewatering if necessary with cost, conveyance taxes royalty labour of all materials and including hire and running charges of machinaries T&P required for the work including supplying and working of pumps and cess as per the specification and direction of Engineer-in-charge.
GROUND FLOOR
(i) Column Base footing-
(ii) Plinth Beam :-
( iii ) Column Supt
(iv) Lintel Band
(v) Chajja:-
(vi) Wall Beam
(vii) Roof Slab-
(viii) Staircase
FIRST FLOOR
( iii ) Column Supt
(iv) Lintel Band
(v) Chajja:-
(vi) Wall Beam
(vii) Roof Slab-
(viii) Staircase
Cutting, bending, binding & placing in position MS bar reinforcement complete as per drawing & technical specifications with all cost of materials, labour, conveyence, etc all complete as per the direction of E.I.C
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
16mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc. all complete all complete as per direction of EIC
GROUND FLOOR
FIRST FLOOR
12mm thick cement plaster (1:6) for brick or concrete work with all cost of materials, labour, conveyence, watering, curing, etc all complete as per direction of EIC
GROUND FLOOR
FIRST FLOOR
6mm thick cement plaster (1:4) to RCC surfaces finished smooth including closed deep chiping and slurry treatment with all cost of all materials, labour, conveyence, etc. all complete as per the directions of EIC
GROUND FLOOR
FIRST FLOOR
Supplying & fixing vitrified tile in floors of size 600mm x 600mm of approved make conforming to IS: 15622 laid on 20mm thick cement mortar (1:4) and filling joints with white cement of approved quality including all cost of all materials, labour, T&P, conveyence, watering, curing, etc all complete as per the directions of EIC
GROUND FLOOR
FIRST FLOOR
Fixing Ceramic tiles in dados,skirting and in rises of steps on 12mm thick bed of cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing including cost of tile. complete in all respect as per the direction of Engineer in Charge.
Finishing surface of wall with cement based wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
Wall Priming one coat with any approved shade of primer ( WBD ) on New Plastered surface of with any approved primer including cost of primer ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
Distempering two coats with any approved shade including cost of distemper on New Plastered surface including cost of distemper of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete in all respect as per the direction of Engineer in Charge.
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
GROUND FLOOR
FIRST FLOOR
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
Tendernotice_2.pdf
PDF • 0.79 MB
Tendernotice_3.pdf
PDF • 2.42 MB
BOQ_570783.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .