| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Finance | -32.13% | ₹2.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 CrAdmitted-Finance | -31.77% | ₹2.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.8 CrAdmitted-Finance | -28.30% | ₹2.8 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.8 CrAdmitted-Finance | -27.28% | ₹2.8 Cr | L4 | Admitted-Finance |
Tender Value
₹4.6 Cr
EMD Value
₹9.2 L
Closing Date
30 Mar 2026, 2:00 pmClosed
Ex. Engineer R and B Division Shopian
Shopian
Upgradation/Improvement of Interior Roads of Pinjoora (A and B) Incl. Mahadal Road, Pinjoora Aglar Road, Pinjoora Pehnoo Road, Salfia Masjid to Guglaroo Road.
2026_PWDJK_305677_1
91/9638-47/RnB/SPN/e-tender of 09-03-2026
Open Tender
Civil Works
540 days
Shopian
Please refer Tender documents.
16 documents required · 16 mandatory
₹5,500
Ex. Engineer R and B Division Shopian
₹9.2 L
Superintending Engineer PWD (RnB) Circle Pulwama/S
9 Apr 2026
9 Mar 2026
31 Mar 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
11 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer R&B Division Shopian
Name of Work: Upgradation/Improvement of Interior Roads of Pinjoora (A&B) Incl. Mahadal Road, Pinjoora Aglar Road, Pinjoora Pehnoo Road, Salfia Masjid to Guglaroo Road.
Contract No: 91/9638-47/RnB/SPN/e-tendering/2025-26 Dated:-09-03-2026 Total Cost=460.752 [Construction Cost=418.866 (base cost=354.971+GST=63.895) + Maintainence cost:41.886(base cost=35.497+GST=6.389)]Lacs (INR) Accord No:- CE(R&B)SK/AA/20 of 2025-26 Dated:-06-12-2025 TS No:-CE(R&B)SK/TS/327 of 2025-26 Dated:- 28-02-2026.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Discription Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Felling of trees
1.01 Felling trees of the girth Beyond 30 cm girth upto and including 60 cm girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable as per direction of Engineer-in-charge 0.000 Nos 0.199 Excess(+) Full Conversion INR
1.02 Felling trees of the girth Beyond 60 cm girth upto and including 120 cm girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable as per direction of Engineer-in-charge 0.000 Nos 0.599 Excess(+) Full Conversion INR
1.03 Felling trees of the girth Beyond 120 cm girth upto and including 240 cm girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable as per direction of Engineer-in-charge 0.000 Nos 0.200 Excess(+) Full Conversion INR
2 Surface dressing
2.01 Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. 0.000 Sqm 0.999 Excess(+) Full Conversion INR
3.01 Earth work in bulk excavation all kinds of soil by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including dressing of sides,ramming of bottom , all lifts and disposal of excavated earth leads as per the directions of Engineer-in-Charge complete 0.000 Cum 0.999 Excess(+) Full Conversion INR
4 Nallah Muck/ RBM
4.01 Providing and laying Nallah Muck/ River Bed Material ( RBM) including sorting , spreading in uniform layers on existing surface and consolidation each deposited layer with Vibrator Roller to the required gradient and camber with all carriages to site of work including loading and unloading complete 0.000 Cum 0.799 Excess(+) Full Conversion INR
5 WBM (Grade-II)
5.01 supplying and stacking, laying, spreading and compacting stone aggregate of 63-45mm size to WBM Specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller of 8-10 tonne capacity in stages to proper grade and camber applying and brooming 13.2 mm type A screening/ binding material to fill up interstices of coarse aggregate, watering and compacting to required density including all carriages of materials as involved complete (Finished work to be measured 75mm thick compacted thickness) including all leads, lifts, loading, unloading carriage of all materials Complete 0.999 Cum 0.399 Excess(+) Full Conversion INR
6 Development of Berms
6.01 Providing and laying RBM/Khak Bajree for development of Berms of specified size and grade including spreading, sorting, levelling, watering and consolidation by Power Road Roller (PRR) of 8- 10 tonne capacity including all carriages complete 0.999 Cum 0.799 Excess(+) Full Conversion INR
7.01 Providing, laying, spreading and compacting 75 mm thick graded stone aggregate (size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge including all leads, lifts, loading, unloading carriage of all materials Complete 0.999 Cum 0.799 Excess(+) Full Conversion INR
7.02 Providing and applying tack coat using hot straight run bitumen of grade -VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. (On WMM/WBM Surface @0.75Kgs/Sqm) including all leads, lifts, loading, unloading carriage of all materials Complete 0.999 Sqm 0.199 Excess(+) Full Conversion INR
7.03 Providing and laying 50 mm thick bituminous macadam with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum/ Batch Type Hot Mix Plant using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Chargeincluding all leads, lifts, loading, unloading carriage of all materials Complete 0.999 Cum 0.400 Excess(+) Full Conversion INR
7.04 Providing and laying semi- dense Bituminous concrete of 25 mm compacted thickness with bitumen of grade VG 10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum /Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge including all leads, lifts, loading, unloading carriage of all materials Complete 0.000 Sqm 0.000 Excess(+) Full Conversion INR
7.05 Providing and laying 6mm thick seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road including all leads, lifts, loading, unloading carriage of all materials Complete. 0.000 Sqm 0.199 Excess(+) Full Conversion INR
8.01 Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete 0.000 Cum 0.999 Excess(+) Full Conversion INR
8.02 Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete 0.000 Cum 0.799 Excess(+) Full Conversion INR
8.03 Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size) crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete 0.000 Cum 0.199 Excess(+) Full Conversion INR
8.04 Providing and laying in position cement concrete in 1:2:4 (1 Cement: 2 Corase sand: 4 grade stone aggr 20 mm nominal size crushed) including curing but excluding the cost of centring and shuttering all work upto plinth level and above plinth level upto required height including all carriages complete 0.000 Cum 0.599 Excess(+) Full Conversion INR
8.05 Centering and shuttring including strutting, propping, etc. and removal of form work forfoundations, footings etc 0.000 Sqm 0.599 Excess(+) Full Conversion INR
8.06 Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate including all carriages complete 0.000 Sqm 0.799 Excess(+) Full Conversion INR
8.07 Supply and filling of Nalla Boulders hand packed including dressing , leveling, compacting and loading , unloading including all carriages complete 0.000 Cum 0.799 Excess(+) Full Conversion INR
9 PCC Retaining wall
9.01 Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete 0.000 Cum 0.999 Excess(+) Full Conversion INR
9.02 Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete 0.999 Cum 0.799 Excess(+) Full Conversion INR
9.03 Providing and laying in position cement concrete 1:4:8 ((1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete 0.000 Cum 0.199 Excess(+) Full Conversion INR
9.04 Providing and laying in position cement concrete in 1:2:4 (1 Cement: 2 Corase sand: 4 grade stone aggr 20 mm nominal size crushed) including curing but excluding the cost of centring and shuttering all work upto plinth level and above plinth level upto required height including all carriages complete 0.000 Cum 0.599 Excess(+) Full Conversion INR
9.05 Centering and shuttring including strutting, propping, etc. and removal of form work forfoundations, footings etc 0.000 Sqm 0.599 Excess(+) Full Conversion INR
9.06 Providing and fixing 75mm dia PVC Pipe for weep holes including all carriages involved complete 0.000 Rm 0.600 Excess(+) Full Conversion INR
9.07 Supply and filling of Nalla Boulders hand packed including dressing , leveling, compacting and loading , unloading including all carriages complete 0.999 Cum 0.799 Excess(+) Full Conversion INR
10 PCC Breast wall
10.01 Earth work in excavation all kinds of soil by mechinical means in trenches for foundations, etc. including dressing of sides and ramming of bottoms, all leads, lift including getting out excavated earth and disposal of surplus excavated earth as per the directions of Engineer In-Charge complete 0.000 Cum 0.999 Excess(+) Full Conversion INR
10.02 Providing and laying stone soling duly hand packed in maintaning level and section including all carriages complete 0.000 Cum 0.799 Excess(+) Full Conversion INR
10.03 Providing and laying in position cement concrete 1:4:8 ((1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete 0.000 Cum 0.199 Excess(+) Full Conversion INR
10.04 Providing and laying in position cement concrete in 1:2:4 (1 Cement: 2 Corase sand: 4 grade stone aggr 20 mm nominal size crushed) including curing but excluding the cost of centring and shuttering all work upto plinth level and above plinth level upto required height including all carriages complete 0.000 Cum 0.599 Excess(+) Full Conversion INR
10.05 Centering and shuttring including strutting, propping, etc. and removal of form work forfoundations, footings etc 0.000 Sqm 0.599 Excess(+) Full Conversion INR
10.06 Providing and fixing 75mm dia PVC Pipe for weep holes including all carriages involved complete 0.000 Rm 0.600 Excess(+) Full Conversion INR
11 Laying of RCC Span Pipes
11.01 Providing and laying of 24" dia (NP2) RCC pipes in proper position/ grade including providing of required quantity of RBM over and under pipes as cushion including cost and carriages of pipes, RBM, loading, unloading complete. 0.000 Rm 0.800 Excess(+) Full Conversion INR
11.02 Providing and laying of 18" dia (NP2) RCC pipes in proper position/ grade including providing of required quantity of RBM over and under pipes as cushion including cost and carriages of pipes, RBM, loading, unloading complete. 0.000 Rm 0.600 Excess(+) Full Conversion INR
11.03 Providing and laying of 36" dia (NP2) RCC pipes in proper position/ grade including providing of required quantity of RBM over and under pipes as cushion including cost and carriages of pipes, RBM, loading, unloading complete. 0.000 Rm 0.400 Excess(+) Full Conversion INR
11.04 Providing and laying of 12" dia (NP2) RCC pipes in proper position/ grade including providing of required quantity of RBM over and under pipes as cushion including cost and carriages of pipes, RBM, loading, unloading complete. 0.000 Rm 0.400 Excess(+) Full Conversion INR
12 Road Marking Strips
12.01 Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade/colour using hot thermoplastic material by fully/semiautomatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. 0.000 Sqm 0.600 Excess(+) Full Conversion INR
13 Maintenance Cost for 5 Years
13.01 1st Year 0.000 Year 0.980 Excess(+) Full Conversion INR
13.02 2nd Year 0.000 Year 0.580 Excess(+) Full Conversion INR
13.03 3rd Year 0.000 Year 0.071 Excess(+) Full Conversion INR
13.04 4th Year 0.000 Year 0.561 Excess(+) Full Conversion INR
13.05 5th Year 0.000 Year 0.052 Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_992762.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.46 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_992762.xls
BOQ • 0.36 MB