Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.4 LAdmitted-Finance | ₹59.4 L | L1 | Admitted-Finance |
| 2 | L2₹60.3 L+₹96,843.35 (1.63%)Admitted-Finance | ₹60.3 L+₹96,843.35 (1.63%) | L2 | Admitted-Finance |
| 3 | L3₹62.0 L+₹2.6 L (4.35%)Admitted-Finance | ₹62.0 L+₹2.6 L (4.35%) | L3 | Admitted-Finance |
| 4 | L4₹62.0 L+₹2.7 L (4.49%)Admitted-Finance | ₹62.0 L+₹2.7 L (4.49%) | L4 | Admitted-Finance |
| 5 | L5₹62.8 L+₹3.4 L (5.71%)Admitted-Finance | ₹62.8 L+₹3.4 L (5.71%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Meetei Construction Private Limited L8 | Kh. Premeshor Singh L10 | W. Ratankumar Singh L1 | THOKCHOM OJIT SINGH L2 | M/S Thaimei Ahem L7 | HAOBIJAM JOY SINGH L5 | RK FORTUNE DEVELOPERS PVT. LTD. L9 | Murphy Thumrah L3 | L Jarma Singh L11 | Awungshi Aring L4 | D. Pukeho Mao L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||||||||||
| 2.00 | All Kinds Soil | 113.05 | cum | 280 ₹31,652.88 | 309.46 ₹34,983.22 | 50 ₹5,652.3 Lowest | 219.72 ₹24,838.47 | 108 ₹12,208.97 | 340.08 ₹38,444.68 | 260.05 ₹29,397.61 | 144.62 ₹16,348.71 | 400 ₹45,218.4 | 220.3 ₹24,904.03 | 228 ₹25,774.49 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 37.68 | cum | 150 ₹5,652.3 | 204.29 ₹7,698.06 | 25 ₹942.05 Lowest | 145.04 ₹5,465.4 | 95 ₹3,579.79 | 142.93 ₹5,385.89 | 171.67 ₹6,468.87 | 130.67 ₹4,923.91 | 187.5 ₹7,065.38 | 145.4 ₹5,478.96 | 150.51 ₹5,671.52 |
| 4.00 | Supplying and filling in plinth with sandy soil under floors including, watering,ramming consolidating and dressing complete. | 138.38 | cum | 650 ₹89,945.7 | 906.96 ₹1,25,503.31 | 500 ₹69,189 | 643.94 ₹89,107.13 | 2,394 ₹3,31,276.93 | 656.24 ₹90,809.18 | 762.15 ₹1,05,464.79 | 418.97 ₹57,976.23 Lowest | 862 ₹1,19,281.84 | 645.7 ₹89,350.67 | 668.21 ₹92,465.56 |
| 5.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - | ||||||||||||||
| 6.00 | 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 38.25 | cum | 6,500 ₹2,48,612 | 8,547.52 ₹3,26,925.54 | 4,500 ₹1,72,116 Lowest | 6,068.74 ₹2,32,117.17 | 6,268 ₹2,39,738.46 | 6,499.62 ₹2,48,597.47 | 7,383.35 ₹2,82,398.37 | 6,866.52 ₹2,62,630.66 | 8,400 ₹3,21,283.2 | 6,254.9 ₹2,39,237.42 | 6,473.28 ₹2,47,590.01 |
| 7.00 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1cement: 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). | 23.3 | sqm | 440 ₹10,253.76 | 476.11 ₹11,095.27 | 5,000 ₹1,16,520 | 338.04 ₹7,877.68 Lowest | 553 ₹12,887.11 | 372.93 ₹8,690.76 | 415.19 ₹9,675.59 | 386.13 ₹8,998.37 | 490 ₹11,418.96 | 351.7 ₹8,196.02 | 364.01 ₹8,482.89 |
| 8.00 | Extra for providing and mixing water proofing material in cement concrete work @1 kg per 50 kg of cement. | 8 | kg | 253.09 ₹2,024.72 | 151.24 ₹1,209.92 | 50 ₹400 | 107.38 ₹859.04 | 16.13 ₹129.04 Lowest | 206.44 ₹1,651.52 | 127.09 ₹1,016.72 | 118.19 ₹945.52 | 271 ₹2,168 | 107.7 ₹861.6 | 111.43 ₹891.44 |
| 9.00 | Applying a coat of residual petroleum bitumen of grade VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 23.3 | sqm | 137.27 ₹3,198.94 | 162.19 ₹3,779.68 | 50 ₹1,165.2 Lowest | 115.15 ₹2,683.46 | 111 ₹2,586.74 | 111.97 ₹2,609.35 | 136.29 ₹3,176.1 | 126.75 ₹2,953.78 | 147 ₹3,425.69 | 115.5 ₹2,691.61 | 119.49 ₹2,784.59 |
| 10.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level: | ||||||||||||||
Tender Value
₹85.0 L
EMD Value
₹17 L
Closing Date
6 Feb 2026, 3:00 pmClosed
Executive Engineer, Div-IV
EDUCATION ENGINEERING WING EDUCATION (S) DEPARTMENT, MANIPUR Babupara, Near D.C. Office (Old), Imphal West
Construction of Toilet with P.W.D.Facilities under PM-USHA 2025-26,(Gender Inclusion an Equity Initiatives) at L.Sanoi College, C.I College, Royal Academy, S.Kula Womens College, Thambal Marik College, Kumbi College, Mangolnganbi College, Moirang co
2026_DoEs_3206_1
EEW/T-15/2025-26/e-tender/34
Open Tender
Civil Works
Works
480 days
Please refer to Tender Documents
As per Tender Documents
2 documents required · 2 mandatory
₹5,000
CFO ENGINEERING CELL DEPT. OF EDUCATION (S)
₹17 L
Yes
Imphal
8 Aug 2026
16 Jan 2026
9 Feb 2026
17 Jan 2026
6 Feb 2026
17 Jan 2026
20 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | - | - | - | - |
| 2 | All Kinds Soil | 0.4 | cum | 1 | ₹0.4 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | cum | 1 | - |
| 4 | Supplying and filling in plinth with sandy soil under floors including, watering,ramming consolidating and dressing complete. | 0.2 | cum | 1 | ₹0.2 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - | - | - | - | - |
| 6 | 1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | 1 | ₹1 |
| 7 | Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1cement: 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size). | 1 | sqm | 1 | ₹1 |
| 8 | Extra for providing and mixing water proofing material in cement concrete work @1 kg per 50 kg of cement. | - | kg | 1 | - |
| 9 | Applying a coat of residual petroleum bitumen of grade VG-10 of approved quality using 1.7kg per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 1 | sqm | 1 | ₹1 |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level: | - | - | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.21 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_3484.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .