| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.5 Cr+₹12.9 L (9.69%)Rejected-Finance | ₹1.5 Cr+₹12.9 L (9.69%) | L2 | Rejected-Finance Rejected |
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
30 Nov 2018, 4:00 pmClosed
C.E PWD (Roads)
O/o the C.E PWD (Roads) Chandmari Guwahati-3
Construction of RCC Br. No 1/2 on Chaporichuk road over river Kachajan under Mahabir Lachit -Chilarai Setu Nirman Abhijan under RIDF XXIV of NABARD for the year 2018-19 P MLCSNA/Jorhat/02
2018_PWD_9700_7
MLCSNA/RIDF/42/18-19/Pt/15
Open Tender
Civil Works
Item Rate
540 days
Titabor
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,440
Empowered Officer ASRB
₹3.0 L
Yes
O/o the C.E PWD (Roads)
18 Jul 2020
15 Nov 2018
1 Dec 2018
15 Nov 2018
30 Nov 2018
15 Nov 2018
15 Nov 2018 - 30 Nov 2018
19 Nov 2018
Amount
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres) (I) By manual means (I) By manual means (c) Reinforced cement concrete
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (I) Ordinary Soil A) Manual means I) Without dewatering i) upto 3m depth
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1000 mm)
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test.
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification. (I) RCC Grade M25 (A) Using concrete mixer
Levelling course for Pile cap
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork RCC Grade M25 Height upto 5m 'Case I : Using concrete mixer
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy Material
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. N) Wihout Plasticizer B) RCC Grade M25 Case I : Using Concrete Mixer ii) For T Beam & Slab a) Height Upto 5M
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Drainage Spouts complete as per drawing and Technical specification
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Painting new letter and figures of any shade (Paining new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade ) ii) English or Roman
Painting on concrete surface (Providing and applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt , dust , oil , grease , efflorescences and applying paint @ of 1litre for 2Sqm) for Plain surface
Painting on concrete surface (Providing and applying two coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt , dust , oil , grease , efflorescences and applying paint @ of 1litre for 2Sqm) for Plain surface , For RCC Railing
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority.
Approach : 'Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness. Manual Means , In area of light jungle
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) From Private Land
Construction of sub grade & earthen shoulders : Construction of Sub grade & Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300.2 (Including compensation of earth.)(Including cost of testing of materials at site and laboratory as directed by the dep't.) a)From Private Land
Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) for grading- II Material
Water Bound Macadam ( Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tones capacity in stages to proper grade and camber, applying and booming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density (With an initial lead of 5.0km), By Manual Means c) Using Screening Type-B (11.2mm Agg.) I) WBM Grading II :
Water Bound Macadam ( Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tones capacity in stages to proper grade and camber, applying and booming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density (With an initial lead of 5.0km) : Using Screening Type-B (11.2mm Agg.) II) WBM Grading III
Prime Coat : Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.6 kg/sqm using mechanical means(Including cost of testing of materials at site and laboratory as directed by the dep't.) (i) With bitumen emulsion -CSS-1h
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.) (C) Granular Surfaces treated with primer
Open Graded premix Surfacing : Providing , laying rolling of open graded premix surfacing of 20 mm thk composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen ( 60-70 Gr) or bitumen impulsion to required line, grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant laying and rolling with a smooth wheeled roller of 8-10 ton capacity to the required level and grade. (including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.00 Km initial lead from mixing plant and including cost of testing of material at site and laboratory as directed by the department). ' Mechanical method using Penetration grade Bitumen ( 60/70 or VG-30 grade) and HMP of appropriate capacity not less than 75 tonnes / hour .
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats) ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) Without anti stripping agent 'Case - I : Type A (Providing and laying liquid seal coat comprising of a layer of bituminous binder ( paving bitumen 60/70 or VG-30 grade, followed by a cover of crushed stone chipping of specified grade.
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand) (II) 60cm equilateral Triangle
(iv) 80 cm x 60cm rectangular
Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. 15 cm dia. RCC guard post with reinforcement of 4nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.
PROTECTION 'Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom,backfilling the excavated earth to the extent required and utilising theremaining earth locally for road work.) (I) Ordinary Soil A) Manual means I) Without dewatering i) Ordinary Soil , Manual Means , upto 3m depth (Without dewatreing
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification Clause 1302
Tej Karan Jain
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .