| 1 | L1₹3.0 CrAccepted-Finance U P SINGH COLONY KANHAIYAPUR VAJIDPUR DISTRICT JAUNPUR U P | ₹3.0 Cr | L1 | Accepted-Finance 1st Lowest |
| 2 | L2₹3.0 CrRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹3.0 Cr | L2 | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | m/s ankur and brothers L1 | M/S Singh Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation in all Type of soil including all lead lift T&P etc. As per direction of Engineer in charge. | 8,492.8 | Cum | 94.75 ₹8,04,692.8 Lowest | 95 ₹8,06,816 |
| 2.00 | Earth Work in filling making base for Brick Soling. As per direction of Engineer in charge. | 13,203.32 | Cum | 94.75 ₹12,51,014.57 Lowest | 96 ₹12,67,518.72 |
| 3.00 | Earth work in filling in making section of existing channel including all lead and lift mannual compaction and dressing to required profile with cost of all material, labour and T&p required for proper completion of work. As per direction of Engineer in charge. | 2,220.9 | Cum | 54.96 ₹1,22,060.66 Lowest | 55 ₹1,22,149.5 |
| 4.00 | Laying of P.C.C. 1:3:6 in foundation With cement corace sand and stone ballast 20mm to 40mm. size including cost of all material , labour T&P etc. As per direction of Engineer in charge. | 581.6 | Cum | 6,511.22 ₹37,86,925.55 Lowest | 6,800 ₹39,54,880 |
| 5.00 | Laying of P C.C. 1:3:6 in foundation with cement corace sand and stone ballast 20mm to 40mm size including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 171.6 | Cum | 6,511.22 ₹11,17,325.35 Lowest | 6,800 ₹11,66,880 |
| 6.00 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 626.91 | Cum | 6,161.59 ₹38,62,762.39 Lowest | 6,400 ₹40,12,224 |
| 7.00 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 236.81 | Cum | 6,161.59 ₹14,59,126.13 Lowest | 6,400 ₹15,15,584 |
| 8.00 | Filling 100mm Thick Coarse Sand. As per direction of Engineer in charge. | 440 | Cum | 3,621.34 ₹15,93,389.6 Lowest | 3,700 ₹16,28,000 |
| 9.00 | Providing and Laying C.C. M 20 (1:1.5:3) lining etc. As per direction of Engineer in charge. | 660 | Cum | 10,233 ₹67,53,780 Lowest | 10,500 ₹69,30,000 |
| 10.00 | Brick on edge with M 150 Brick Laid Dry joints Sand filling including preparation of Base to Proper Slope and its Ramming including supply of all material, Labour and T&P required for proper completion of work. As per direction of Engineer in charge. | 9,150 | Sqm | 511.65 ₹46,81,597.5 Lowest | 530 ₹48,49,500 |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
16 Jun 2026, 2:00 pmClosed
Superintending Engineer
S.E. 18th Circle Irrigation works, Govindpur Prayagraj
Construction of brick soling and Restoration of outlets of Mariyahu branch from km 97.000 to km 118.850. (LOT-04)
2026_UPIDC_1158198_4
02/S.E./2026-27
Open Tender
Civil Works - Canal
Item Rate
S.E. 18th Circle Irrigation works prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,507
₹6.3 L
Prayagraj
22 Jul 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in all Type of soil including all lead lift T&P etc. As per direction of Engineer in charge. | 8,492.8 | Cum | - | - |
| 2 | Earth Work in filling making base for Brick Soling. As per direction of Engineer in charge. | 13,203.32 | Cum | - | - |
| 3 | Earth work in filling in making section of existing channel including all lead and lift mannual compaction and dressing to required profile with cost of all material, labour and T&p required for proper completion of work. As per direction of Engineer in charge. | 2,220.9 | Cum | - | - |
| 4 | Laying of P.C.C. 1:3:6 in foundation With cement corace sand and stone ballast 20mm to 40mm. size including cost of all material , labour T&P etc. As per direction of Engineer in charge. | 581.6 | Cum | - | - |
| 5 | Laying of P C.C. 1:3:6 in foundation with cement corace sand and stone ballast 20mm to 40mm size including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 171.6 | Cum | - | - |
| 6 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 626.91 | Cum | - | - |
| 7 | B/W with 1:4 cement Mortor with brick class 150, cement, coarse sand including cost of all material and labour T&P etc. As per direction of Engineer in charge. | 236.81 | Cum | - | - |
| 8 | Filling 100mm Thick Coarse Sand. As per direction of Engineer in charge. | 440 | Cum | - | - |
| 9 | Providing and Laying C.C. M 20 (1:1.5:3) lining etc. As per direction of Engineer in charge. | 660 | Cum | - | - |
| 10 | Brick on edge with M 150 Brick Laid Dry joints Sand filling including preparation of Base to Proper Slope and its Ramming including supply of all material, Labour and T&P required for proper completion of work. As per direction of Engineer in charge. | 9,150 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Document4.pdf
Tender Documents • 2.62 MB
BOQ_2170734.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].