Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC 1301 12 GALI NO 2 DIDAR NAGAR KURUSKHETRA 136119 | KURUKSHETRA | HARYANA | 136119 | ₹24.4 L Quoted ₹24.7 L | L1 | Accepted-AOC As per LOA |
| 2 | L2₹27.0 L+₹2.2 L (9.09%)Rejected-Finance | ₹27.0 L+₹2.2 L (9.09%) | L2 | Rejected-Finance L-2 REJECT |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical H NO 391 SATSANG VIHAR JAGADHRI 135003 | JAGADHRI | YAMUNANAGAR | HARYANA | 135003 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 360 KRISHANA NAGAR HISAR HARYANA | HISAR | HARYANA | 125001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHRI GANESH COOP L AND C SOCIETY LTD L2 | THE ARYVRAT COOPERATIVE LABOUR AND CONSTRUCTION SO L1 |
|---|---|---|---|---|---|
| 1.01 | Supply of Ready Mix Bituminous Material of SHALMAX PR bag of 50 kg by weight. | 2,150 | Nos. | 1,105 ₹23,75,750 | 1,015 ₹21,82,250 Lowest |
| 1.02 | Labour rate of Laying of Ready Mix Bituminous Material with Stone Metal Complete in all respect. | 15,050 | sqft | 14 ₹2,10,700 | 12 ₹1,80,600 Lowest |
| 1.03 | Supply of Stone Metal Complete in all respect below the Bituminous layer of Shalmax . | 106.48 | cum | 1,040 ₹1,10,739.2 | 1,030 ₹1,09,674.4 Lowest |
Tender Value
₹24.9 L
EMD Value
₹49,780
Closing Date
14 Apr 2026, 5:00 pmClosed
Sh Navin Kumar
Municipal Committee Ladwa
Repair of Pothole with Ready-mix Bitumen Material in Ward No. 1 to Ward no. 15 under Municipal Committee Ladwa
2026_HRY_513181_1
20264E5E01E1 AAAD 42BB 883E F27512EFFCDA304ULB
Open Tender
Civil Works
Works
250 days
Ladwa
2 documents required · 2 mandatory
₹1,000
₹49,780
Yes
5 May 2026
7 Apr 2026
15 Apr 2026
7 Apr 2026
14 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply of Ready Mix Bituminous Material of SHALMAX PR bag of 50 kg by weight. | - | Nos. | - | - |
| 1.02 | Labour rate of Laying of Ready Mix Bituminous Material with Stone Metal Complete in all respect. | - | sqft | - | - |
| 1.03 | Supply of Stone Metal Complete in all respect below the Bituminous layer of Shalmax . | - | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_591999.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .