Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance JAMMU AND KASHMIR JAMMU AND KASHMIR | JAMMU | JAMMU AND KASHMIR | 181122 | Admitted-Finance |
| 4 | Rejected-Technical HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | Rejected-Technical REJECTED |
Tender Value
Refer Docs
Closing Date
15 Oct 2021, 4:00 pmClosed
EE PHE DIV REASI
EE PHE DIV REASI
Estimate for Installation, Testing, Commissioning of 250 KVA Distribution Transformers along Bifurcation of circuits at Dhansar stage Zero and allied works
2021_PHE_142960_1
ENIT 75 OF 2021-22
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
30 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Nov 2021
8 Oct 2021
18 Oct 2021
8 Oct 2021
15 Oct 2021
8 Oct 2021
Amount
Installation, Testing, Commissioning of 250 KVA Distribution Transformers. (4 Nos.) at Baba Dhansar stage Zero by way of shifting of transformer from road site to existing platform by deputing skilled Labour, crane and tool & trackles and arrange/connecting it after proper synchronizing. P/F of link sets on required MS channel/angle and MS clamps. Making HT connections and LT connections tightly. Providing & filling of fresh T-oil alternately 600 Lt after removing of moisture in T-oil to attain Di-electric strength of transformer oil. Job includes Separation / Bifurcation of existing circuit feeding to voltage stabilizer by P/F of new aluminum cable 3.5x185 Sqmm. Approximately 65 Mtr. with proper thimbling by using crimping tools. Job also includes providing and fitting with ACB1000Amp (Air circuit Breaker) = 1 No by making proper provision for fixing of ACB by means of angle irons & nut bolts etc & testing the system on load. In addition to it providing of 500 ltr T. Oil for 400 KVa voltage stabilizer at dhansar stage zero and making connections thereof from newly installed ACB to 400Kva voltage stabilizer and form voltage stabilizer to control panel. Complete job cost of material, labour charges and charges for carrying tools-tackles, taxes and other items required for making the system functional at site. Complete job in all respect .
SUNIL KUMAR SURI CONTRACTOR
SAI ENGINEERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .