Tender Value
₹12.2 L
EMD Value
₹12,500
Closing Date
17 May 2021, 4:00 pmClosed
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Lucknow
Work of annual patrolling and maintenance of various 132 KV Transmission lines under ETD II, Lucknow
2021_UPTCL_584805_1
Short Term E-tender 01/2021-22
Open Tender
Electrical Works
Piece-work
365 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹12,500
9 Jun 2021
29 Apr 2021
18 May 2021
29 Apr 2021
17 May 2021
29 Apr 2021
Amount
Detail works of patrolling of 132 kV Transmission lines
1 a) Tower to Tower Patrolling (every quarter i.e. 04 times a year) of following 132 kV Transmission lines, from one end to other end and submission of Patrolling Report within Seven days after completion of each patrolling in Triplicate in prescribed proforma mentioning stolen/missing Tower parts & Tower Accessories such as missing Danger/ Phase/ Number Plates, Trees/ Tree branches & Bamboo Kothi falling in Line Corridor, damage to Earth wire, Conductor, Jumpers, Insulators & other Line Accessories damage to Foundation, Coping, Chimney, Earthing etc., with the help of Patrolling Teams:
i) 132 K.V. Chinhat - Gomti Nagar D.C. Line (Chinhat - Gomti Nagar Ckt., Chinhat - Martin Purwa Ckt. and Gomti Nagar - SGPGI Ckt. upto LILO) (13.90x4 Km)
ii) 132 K.V. Chinhat - N.K.N. S.C. Line (24.80x4 Km)
iii) 132 K.V. Chinhat - Indira Nagar D.C. Line (5.40x4 Km)
iv) 132 K.V. Indira Nagar - Kursi Road D.C. Line (5.20x4 Km)
v) 132 K.V. Kursi Road - Khurram Nagar D.C. Line (12.5x4 Km)
vi) 132 K.V. Khurram Nagar - N.K.N. S.C. Line (7.90x4 Km)
vii) 132 K.V. Hardoi Road - N.K.N. S.C. Line (10.05x4 Km)
viii) 132 K.V. Hardoi Road - Sahara City Homes Line (5.90x4 Km)
ix) 132 K.V. Sahara City Homes - Sidhauli Line (47.00x4 Km)
x) 132 K.V. Chinhat - Telco Line (2.2x4 Km)
1b) Emergency Patrolling
i) Emergency Patrolling of all the above 132 kV Transmission line by experienced persons in case of any tripping/breakdown of line. The emergency Patrolling includes checking of Towers, conductors, earth wire, insulators, clamps, fittings etc. to locate the defect/fault/deficiencies. The emergency patrolling has to be started within 6 hours after receiving the call of SDO/JE.
a) Up to 20 kms
b) Above 20 kms to 50 kms
c) Above 50 kms to 100 kms
2a) Lopping/ Chopping of various species of tree branches falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/ telephone lines passing near vicinity of the trees of all the above 132 KV lines along with throwing of cut branches at least 50 meter away from the line corridor (Three times in a year/ as per requirement)
2b) Cutting of bamboo bushes falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/telephone lines passing near cicinity of the trees all the above lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below (Three times in a year/ as per requirement):
I) 132 K.V. Chinhat - Gomti Nagar D.C. Line (Chinhat - Gomti Nagar Ckt., Chinhat - Martin Purwa Ckt. and Gomti Nagar - SGPGI Ckt. upto LILO) (13.90 Km)
ii) 132 K.V. Chinhat - N.K.N. S.C. Line (24.80 Km)
iii) 132 K.V. Chinhat - Indira Nagar D.C. Line (5.40 Km)
iv) 132 K.V. Indira Nagar - Kursi Road D.C. Line (5.20 Km)
v) 132 K.V. Kursi Road - Khurram Nagar D.C. Line (12.5 Km)
vi) 132 K.V. Khurram Nagar - N.K.N. S.C. Line (7.90 Km)
vii) 132 K.V. Hardoi Road - N.K.N. S.C. Line (10.05 Km)
viii) 132 K.V. Hardoi Road - Sahara City Homes Line (5.90 Km)
ix) 132 K.V. Sahara City Homes - Sidhauli Line (47.00 Km)
x) 132 K.V. Chinhat - Telco Line (2.2 Km)
2c) Lopping/Chopping of Spiniferous Babool tree /branches falling inside the corridor with all due care of safety and precaution for all the following lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below (Three times in a year/ as per requirement):
i) 132 K.V. Chinhat - N.K.N. S.C. Line (700 No. x 3)
ii) 132 K.V. Chinhat / Kursi Road - Khurram Nagar Line (100 No. x 3)
3) Replacement of missing tower parts along with fabrication work and fixing with tower after shifting of tower parts, nuts & bolts from UPPTCL store to work site in the above mentioned 132 KV lines.
4) Checking & Tightening of Jumpers of Tension Towers of above 132 K.V. Transmission Lines including Replacement of damaged Jumpers, Fasteners (if needed) and including carriage of material from Store to site of work.
5) Re-fixing and tightning of dislocated/ shifted Vibration Dampers to its place including replacement of fasteners if required in the above 132 KV Transmission Lines.
6) Cleaning of Disc Insulators String of Suspension Tower of above 132 K.V. Transmission Lines with soap solution and distilled water, removing all types of foreign particles including detergent sticking on the surface of Disc Insulators in Suspension String.
M/S KSHITIJ ENTERPRISES
MANAS ELECTRICALS
M/s Janta Charan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .