Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹11.3 L+₹55,507.20 (5.17%)Admitted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SPK ENTERPRISES L1 | THIAGARAJAN ENGINEERING CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Application of Ceramic wear coat Eromat 1003/Equivalent by surface preparation and application in the inner surface of the Mill discharge valve including cost of EROMAT 1003/ Equivalent for 5mm thickness, rust converter, consumables and T&P's etc., completely. | 23.04 | Sq.mtr | 29,000 ₹7,88,428.8 Lowest | 30,500 ₹8,29,209.6 |
| 2.00 | Application of Ceramic wear coat Eromat 1003/Equivalent by surface preparation and application in the inner surface of the Multiple port outlet including cost of EROMAT 1003/Equivalent for 5mm thickness, rust converter, consumables and T&P's etc., completely. | 8.32 | Sq.mtr | 29,000 ₹2,84,710.4 Lowest | 30,500 ₹2,99,436.8 |
Tender Value
Refer Docs
EMD Value
₹8,700
Closing Date
16 Sept 2026, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle AOH 26 27 MPM Dn Unit I Applying Ceramic Wear Coat EROMAT 1003 in the inner surface of MDVs and MPOs of Mill 1A 1D 1E and 1F during annual overhaul 2026 27
2026_EB_703118_1
CE SE MI NCTPS I 42 26 27
Open Tender
Power/Energy Projects/Products
Works
18 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,700
Yes
28 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Application of Ceramic wear coat Eromat 1003/Equivalent by surface preparation and application in the inner surface of the Mill discharge valve including cost of EROMAT 1003/ Equivalent for 5mm thickness, rust converter, consumables and T&P's etc., completely. | 23.04 | Sq.mtr | 27,200 | ₹6,26,688 |
| 2 | Application of Ceramic wear coat Eromat 1003/Equivalent by surface preparation and application in the inner surface of the Multiple port outlet including cost of EROMAT 1003/Equivalent for 5mm thickness, rust converter, consumables and T&P's etc., completely. | 8.32 | Sq.mtr | 26,323 | ₹2,19,007.36 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_845197.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .