| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-AOC A 3 257 JANAKPURI NEW DELHI 110058 | WEST DELHI | DELHI | 110058 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹25.9 L+₹6.1 L (30.8%)Rejected-AOC 1 128 A SECOND FLOOR MOHAMMADPUR NEAR BHIKAJCAMA PLACE NEW DELHI 110066 | NEW DELHI | NEW DELHI | DELHI | 110066 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹35.0 L+₹15.2 L (76.7%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹44,220
Closing Date
27 Feb 2021, 6:00 pmClosed
GE I RND DELHI
MILITARY ENGINEER SERVICES, GARRISON ENGINEER (I) RND, LUCKNOW ROAD, TIMARPUR, DELHI-110054
COMPREHENSIVE MAINTENANCE (AMC) OF LIFT IN VARIOUS LABS AT METCALFE HOUSE UNDER GE I RND DELHI
2020_MES_384419_2
GE/RND-57/DLI/2020-2021
Open Tender
Civil Works
Item Rate
330 days
DELHI
Class E, Cat c(ii)
2 documents required · 2 mandatory
₹500
GE I RND DELH
₹44,220
Yes
28 Apr 2021
28 Nov 2020
1 Mar 2021
28 Nov 2020
27 Feb 2021
15 Feb 2021
Amount
Comprehensive maintenance through OEM for 01 No lift of capacity 08 passangers (544 KG) (Ground + 5 floors) installed at DESIDOC `A' Block Building M`House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- ThyssenKrupp).
Comprehensive maintenance through OEM for 01 No of Passenger cum Fright/Luggage lift of capacity 1500 KG (Ground +5 floors) installed at SAG LAB at M` House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- Skylark).
Comprehensive maintenance through OEM for 01 No lift of capacity 05 passangers (544Kgs) (Ground + 5 floors) installed at DESIDOC `B' Block Building of M`House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- ThyssenKrupp)
Comprehensive maintenance through OEM for 01 No lift of capacity 06 Passenger (408 Kgs) (Ground +5 floors) installed at OLD SAG LAB at M` House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- ThyssenKrupp).
Comprehensive maintenance through OEM for 01 No lift of capacity 10 Passenger G +4 Floor (Basement + Ground +3 floors) installed at JCB BLDG No-01 in M` House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- OTIS).
Comprehensive maintenance through OEM for 01 No lift of capacity 10 Passenger G +4 Floor (Basement + Ground +3 floors) installed at JCB BLDG No-02 in M` House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- OTIS).
Comprehensive maintenance through OEM for 01 No lift of capacity 1000 Kgs Luggage Lift G +4 Floor (Basement + Ground +3 floors) installed at JCB BLDG No-01 in M`House including all instruments and controlled complete all as specified and directed by Engineer-in-Charge. (Make of Lift- UTL).
Comprehensive maintenance through OEM of Dump Waiter of capacity 200 KG for two floors (Ground + 1 Upper floor) installed at LASTEC wet canteen at M`House including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- JOHNSON) .
Comprehensive maintenance through OEM for lift of capacity 20 passangers for six floors (Ground + 5 floors) installed at SAG Lab at M`House including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- JOHNSON).
Comprehensive maintenance through OEM for lift of capacity 08 passangers (544 KG) for four floors (Ground + 3 floors) installed at GM Building of SSPL including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- JOHNSON).
Comprehensive maintenance through OEM for lift of capacity 08 passangers (544 KG) for three floors (Ground + 2 floors) installed at Main Building of INMAS including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- JOHNSON).
Comprehensive maintenance through OEM for lift of capacity 08 passangers (544 KG) for four floors (Ground + 3 floors) installed at Main Building of DIPAS including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- JOHNSON).
Comprehensive maintenance through OEM for lift of capacity 08 passangers (544 KG) for four floors (Ground + 3 floors) installed at Main Building of CFEES including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- OMEGA)
Comprehensive maintenance through OEM for lift of capacity 08 passangers (544 KG) (Ground + 5 floors) installed at DESIDOC `A' lift No. 2 Block Building M`House including all instruments and controlled complete all as specified and directed by engineer-in-charge.(Make of Lift- ThyssenKrupp)
NOTE FOR ITEMS SER NO 01 TO 14 (a) The Comprehensive maintenance work of lifts/waiter shall be carried out by OEM only. It is an express condition of the contract that tenderers shall upload an MoU at the time of submission of technical bid in this regard with the ThyssenKrupp, Skylark, OTIS, UTL, Johnson, Omega duly signed by all concerned certified by Registrar/Notary and the same will be produced by the lowest tenderer in original within a week from the date of evaluation of financial bids. (b) The maintenance records for maintenance schedule will be maintained by the Contractor. (c) The Contractor will maintain lift in good working conditions without breakdown. The tenderer is advised to maintain the rigourous maintenance schedule to avoid any breakdown and send the maintenance personnel regularly and also store the spare parts (Spare parts should be as per OEM's specification) so that any breakdown is attended promptly.
(d) The comprehensive maintenance schedule rate includes all the spare parts/defective equipments including consumable which are required for satisfactory maintenance of the Lift as per specification of ThyssenKrupp, Skylark, OTIS, UTL, Johnson, Omega. The Contractor shall not be paid anything extra for these parts/equipments and also to bear all the defects arising during the period. (e) Service the lifts at regular intervals and as frequently as the company deems necessary based on the nature and condition of the elevator, The lift should be maintain in safe and proper working condition. (f) Renew all wire ropes and chains (Where fitted) as often as required to maintain an adequate factor of safety, to equalize the tension on all hoisting ropes, repair or replace conductor cable and hoistway and machine room elevator wiring. (g) Replace the gear and motor bearing with necessary manufacturer recommended lubricants whenever necessary and all parts of the lift will be checked, cleaned and lubricated to keep them both mechanically and electrically in perfect working condition.
M/s Dhapola Elevator and Engineering
Iconic Engineers
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .