| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.4 LAccepted-AOC HOUSE NO 1310 SECTOR 4 URBAN ESTATE GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹85.2 L+₹2.8 L (3.37%)Rejected-AOC PLOT NO 172 22 GALI NO 09 GANDHI NAGAR GURGAON 122001 | GURGAON | GURUGRAM | HARYANA | 122001 | L2 | Rejected-AOC L2 | |
| 3 | L3₹88.7 L+₹6.3 L (7.60%)Rejected-AOC BALBEHRA VILLAGE BALBEHRA TEHSIL GUHLA KAITHAL 132027 | 132027 | L3 | Rejected-AOC L3 |
Tender Value
₹77.9 L
EMD Value
₹1.6 L
Closing Date
17 Jan 2025, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurgaon
Supply/Erection/Testing/Commissioning of 12.5 Mtr High Mast and Erection of LED flood light on High Mast area under zone-3 in MCG.
2025_HRY_421701_1
2025292B75AE 3634 408A 80FB D1F7006343F3285ULB
Open Tender
Civil Works
Works
65 days
Gurugram
Supply/Erection/Testing/Commissioning of 12.5 Mtr High Mast and Erection of LED flood light on High Mast area under zone-3 in MCG.
2 documents required · 2 mandatory
₹15,000
Yes
₹1.6 L
Yes
4 Feb 2025
3 Jan 2025
17 Jan 2025
3 Jan 2025
17 Jan 2025
3 Jan 2025
Amount
Supply/Erection/Testing/Commissioning of 12.5 Mtr High Mast and Erection of LED flood light on High Mast area under zone-3 in MCG
Providing trench less boring below existing road / pavement including laying of 65 mm dia GI pipe B class required to complete the job in all respect
Restoring the road cut, in level with the existing road surface, including preparation of subgrade laying and relaying of soiling and laying and consolidation of wearing coats to water bound macadam specification and laying 20mm thick premix carpet, on top including cost of tack and sealcoat complete in all respects...
Providing trench less cuttting by Hydraulic Drilling Device boring/ Manual OR through some suitable alternate method with insertion of HDPE Pipe including supply, Delivery of HDPE pipe at work site and laying of 50mm internal diameter HDPE pipe inside road for road corssing of cable by Hydraulic Drilling Device without opening of the road top surface, laid at a depth of at least 900mm below the road surface from the feeding point to the feeder pillar box in median (OR) from feeder pillar to respective street light pole including cost of all accessories for road crossing for laying of cables..
Digging of pucca road in required width for laying of cable/pipe complete in all respect upto the entire satisfaction of Engineer-in-charge..
Supply, Erection, testing and commissioning of 3 phase automatic timer AMSON`s / L and T make on/off the street lights on different fixed timing maintainable on street lights pedestal, pillar, wall M.S pedestal where on\off point is available, cabinet is fabricated from 22 gauge, painting, wiring, connection on/off from bottom of the cabinet, 3 contractor 63 Amp, 24 volts D.C each transformer, rectifier system switching system, bakelite contractor 63 Amp, MCB 63 Amp LandT digital timer Auto/Manual system, time setter, fibber sheet, rubber and plastic component, wiring and component fitting, chemical (Epoxy) including the cost of labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In -Charge of the work.
Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismentelment/erection of flood light fitting from High Mast during maintenanc period, 1 year free of cost complete in all respect.
Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of flood light fitting from High Mast during maintenance period, 2nd year @3% of cost complete in all respect.
Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of flood light fitting from High Mast during maintenance period, 3rd year @4% of cost complete in all respect.
Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of flood light fitting from High Mast during maintenance period, 4th year @5% of cost complete in all respect.
Operation and Maintenance, removing of fault i.e LT cable, PVC Cable, MCB, MCCB and replacement of faulty cable MCB, MCCB, Automatic Timer Switch including on/off of street light system, including dismantlement/erection of flood light fitting from High Mast during maintenance period, 5th year @6% of cost complete in all respect.....
Bidder Name
Amount
Fortune Enterprises (GSTN-06AQAPK5263F3Z1) BID ID -1201487
Bharat Pumps and Projects (GSTN-06AAFFB8981N1ZT) BID ID -1201494
Mukesh Kumar Contractor (GSTN-06AKUPB1426B1ZN) BID ID -1201765
Fortune Enterprises (BID ID -1201487)
Mukesh Kumar Contractor (BID ID -1201765)
Fortune Enterprises (BID ID -1201487)
Mukesh Kumar Contractor (BID ID -1201765)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .