| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-Finance VESSU ANANTNAG KASHMIR 192102 | 192102 | ₹2.5 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.6 Cr+₹8.6 L (3.45%)Accepted-Finance | ₹2.6 Cr+₹8.6 L (3.45%) | L2 | Accepted-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
14 Sept 2021, 4:30 pmClosed
Superintending Engineer PMGSY Circle Srinagar
Engineering Complex Block - C, Rajbagh, Srinagar
Upgradation and Maintenance of road from MRL01 - Kadder Turigam Pandithpora Nunmahi Zaban Palnoo (Balance Work), Stage-U, Length 3.55Km, Carriageway 3.75m, PMGSY-II, Stage-U, District Kulgam
2021_KSRRD_113068_1
JK012013
Open Tender
CIVIL
Item Rate
200 days
Kulgam
Please refer Tender documents.
18 documents required · 18 mandatory
₹10,000
Accounts Officer PMGSY Kashmir
₹5.0 L
Srinagar
22 Nov 2021
6 Sept 2021
15 Sept 2021
6 Sept 2021
14 Sept 2021
6 Sept 2021
9 Sept 2021
Amount
Site Clearance/Earthwork
Uprooting and removing stumps and roots lead up to 1000mm
a):- Girth 300 mm -600mm
b):- Girth 600 mm -900mm
c):- Girth 900mm - 1800 mm
Cross drainages
A) Pipes NP3
Earthwork in excavation for foundation of structures upto 3.0m height as per drawing and technical specifications Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and dressing of sides and bottom and backfilling in trenches with approved material.
Laying of Type B bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)including cost and carriage of all materials involved (Finished work to be measured)
Plain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below open foundation of Head walls as per drawings & Technical Specification Clause 1109
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-15 Nominal mix 1:2.5:5)including cost and carriage of all materials involved(Finished work to be measured)
Providing and laying reinforced cement concrete pipe NP3 for cross drainage on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets as per Clause 1106. 450mm dia.
450 MM dia
1000MM dia
Back filling behind abutment, wing, wall, return wall, complete as per drawings and technical specification clause 1204.3.8.(Granular material )including cost and carriage of all materials from approved source to site of work,with all leads, lifts, loading unloading and octori.(Finished work to be measured, complete .) .
(B):- RCC CULVERT (1X 2 MTR)
Providing fixing in position pipe railings consisting of IS Rolled steel joists designation ISMB 100X100X75 at 2.5 minterval and three rows of 50mm dia pipes
Cement Concrete Drain
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Type B (First Class) Bedding, Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)including cost and carriage of all materials involved (Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202&1203 (P.C.C Grade M-10 Nominal mix 1:3:6) including loading/unloading ,haulage,shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802,803,1202&1203 (P.C.C Grade M-15 Nominal mix 1:2.5:5)including loading/unloading ,haulage,shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,B431202 & 1203 (P.C.C M-20 in foundation) including loading/unloading,haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 {R.C.C grade M 25 Nominal mix (1:1.5:3)} including loading/unloading, haulage,shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Supplying fitting and placing of TMT bar reinforcement in super structure complete as per drawings and technical specification clause 1002, 1010 and 1202 Including loading, unloading, haulage , royality and octori etc. material complete job ( finished work to be measured)
Protection Works:- Retaining Walls
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.(Ordinary soil upto 3 m depth)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C Grade M-10 Nominal mix 1:3:6)including cost and carriage of all materials involved (Finished work to be measured)
Providing concrete for plain/reinforced concrete in substructure complete as per drawings and technical specifications Clause 802,803,1202&1203(P.C.C Grade M-15 Nominal mix 1:2.5:5) including cost and carriage of all materials involved (Finished work to be measured)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803,B431202 & 1203 (P.C.C M-20 in foundation) including loading/unloading,haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Providing weepholes in brick masonary/stone masonary plain/reinforced concrete abutments, wing wall,return wall with 100mm dia AC pipe extending through the full width of the structure with slope 1(v):20(H) towards drawing face complete as per drawings & technical specifications Clause 614,709,1204.3.7 finished work to be measured)
Backfilling behind abutment wing wall and return wall complete as per drawings and technical specifications including cost and carriage of all materials involved (Finished work to be measured)
Pavement
Scarifiying of exixting Bitumenous pavement to a depth of 150mm and disposal of dismantalled material upto a lead of 1000m, as per T.S. clause 301.4.
Granular Sub Base:Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.for Grading 1 material,including loading/ unloading,haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured )
WMM:-Providing,laying, spreading and compacting graded stone aggregates to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer(Pug mill)Carriage of mixed material by tipper to sit,laying in uniform layers in sub-base/base course on a well prepared sub base & compacting with smooth wheel roller of (80-100)KN weight to achieve the desired density including lighting,barricading & maintenance of diversion,etc.as per tables 400.11 & 400.12 and Techanical Specification Clause 406.
Prime Coat :- Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502,including loading/ unloading,haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Tack Coat: Providing and Laying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25to 0.30Kg per Sqm on the prepared bituminous surface cleaned with Hydraulic broom ar per technical specification clause 503.including loading/unloading, haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured )
Bituminous Macadam :- P/L Bituminous Macadam with Hot mix plant using crushed aggregate of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the rquired grade, level and alignment and rolled to achieve the desired compaction as per technical specification clause 504. including loading / unloading , haulage , shuttering and octri etc of all materials complete job involved(Finished work to be measured )
20mm thick OGPC :- Providing, laying and rolling of open- graded premix carpet of 20mm thickness composed of 13.20 mm to 5.60mm size aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kN static roller capacity ,finished to required level and grade to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.By Mechanical Means Bitumen, (S-90) including loading/unloading,haulage, shuttering and octri etc of all materials complete job involved(Finished work to be measured )
Seal Coat :- Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A ,Type B and Type C as per Technical Specification Clause 510.specification 1995) By Mechanical Means Type B Bitumen (S-90),including loading/ unloading, haulage,shuttering and octri etc of all materials complete job involved(Finished work to be measured)
Shoulders :- Development of shoulders Using naturally occuring gravel/Muck, Nallah or quarry including compaction complete job
Road Furnitures
PMGSY informatory board :- Providing and fixing of Logo Board of PMGSY including excavation,concreteing,erecting, loading,unloading, Haulage ,Painting & writing etc.complete as per the road sinage booklet of PMGSY.
Citizen informative board :- Providing and fixing of citizen information Board of PMGSY including excavation,concreteing,erecting,loading,unloading, Haulage ,Painting & writing etc.complete as per the road sinage booklet of PMGSY.
PMGSY LOGO BOARD:-Providing and fixing of PMGSY Board with typical LOGO as per MORD specification and drawing.
Kilometer Stone Reinforced cement concrete M-15 grade KM stone /local stone of standard design as per IRC -8, fixing in position including painting and printing etc. as per drawing and technical specification clause 1703 ordinary Km stone (precast) Chapter 10,10.10
200-meter Stone Reinforced cement concrete M-15 grade KM stone /local stone of standard design as per IRC -8, fixing in position including painting and printing etc. as per drawing and technical specification clause 1703 ordinary Km stone (precast) 200 m stone precast
Boundary Pillars:-Reinforced cement concrete M-15 Grade Boundry pillars / local stone of standard design as per IRC - 25 fixed in position includeing finishing and lettering but exculding painting as per drawing and technical specification clause 1704 Chapter 10, 10.11
Construction of Back pillars/bench pillars as per Fig. 1600.1 (c) as per drawing and Technical Specification Clause 1602.3
Construction of reference pillars as per Fig. 1600.1 (b) as per drawing and Technical Specification Clause 1602.1 Chapter 8,8.2(1)
Providing and fixing retro- refllectorised cautionary , mandatory and informatory sign ,place identification as per IRC :67 made of encapsulated lense type reflective sheeting wide clause 1701, 2.3 fixed over aluminum sheeting 1.5mm thick supported on a mild steel angle iron post 75 x75 x6mm steel tube firmly fixed to the ground by properly designed foundation with M-15 grade cement concrete 450 x450 x 600mm , 600mm below round level as per drawing and technical clause 701. .
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing and Technical Specification Clause 1702
Maintenance cost of Ist year
Maintenance cost of 2nd year
Maintenance cost of 3rd year
Maintenance cost of 4th year
Maintenance cost of 5th year
The Contractor has to quote the rates for Construction part without GST and GST @12% shall be added at the time of Allotment.
Bhan Construction Group
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .