Loading…
Loading…
| # | Company | Offered Item | Rank |
|---|---|---|---|
| 1 | Not yet disclosed by govt. L1 Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | L1 |
| 2 | Not yet disclosed by govt. L1 Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | L1 |
| 3 | Not yet disclosed by govt. L2 Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | Item Categories: High Mast Lighting Octagonal Tower with Solar Based LED Street Light | L2 |
Tender Value
₹2.7 L
EMD Value
Exempted
Closing Date
6 Feb 2026, 3:00 pmClosed
High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2026/B/7123017 Dated : 27-01-2026 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 267500 Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
8853487
GEM/2026/B/7123017
Single Packet Bid
Ranchi, Jharkhand
Total value wise evaluation
PRODUCT
7 documents required · 7 mandatory
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| High Mast Lighting Octagonal Tower with Solar Based LED Street Light (Q3) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete Document required from seller Experience Criteria | - | 1 | - |
Exempted
6 Feb 2026
27 Jan 2026
6 Feb 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8853487.pdf
GEM_BID
ATC_06ece88b-7a1f-471c-85441768728267383_sommnk.ccl.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
ATC_06ece88b-7a1f-471c-85441768728267383_sommnk.ccl.docx
GEM_OTHER • 0.04 MB
list-of-categories-where-trials-are-allowed_1712126171.pdf
GEM_OTHER • 0.52 MB
gtc.pdf
GEM_OTHER • 0.70 MB
Download all tender documents and submit your bid