Loading…
Loading…
Tender ID
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
16 Mar 2026, 10:00 amClosed
Executive Engineer MID Anantnag hq Awantipora
Awantipora
Servicing/impregnation of flood affected prime movers and pumps at various LIS of MISD Padgampora..
2026_IFC_305786_2
Enit 14 of 2025-26
Open Tender
Electrical and Maintenance Works
Percentage
10 days
Awantipora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
executive eingineer MID Anantnag
₹3,500
8 Apr 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
16 Mar 2026
10 Mar 2026
Disconnecting / Dismantling of submerged 200 HP Horizontal motor coupled with 20 cusec pumping equipment from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish ( 2 coats ) .After impregnation applying of heat up to suitable temperature for drying of coils /stator. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assembly completely before re installations of motor assembly. (At LIS Kakapora Draught and At LIS Tokina Draught )
Dismantling of pump assembly from base frame and Checking of pump by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh transmission oil of suitable grade approx. 4 ltrs up to required levels . The job further includes complete assembling of pump and motor. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. . (At LIS Kakapora Draught and At LIS Tokina Draught )
Disconnecting / Dismantling of submerged 75 HP and 60 HP Horizontal motors coupled with 15 cusec and 10 cusec pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applyingof highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Dogripora Draught New)
Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil,cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. .(At LIS Dogripora Draught New)
Disconnecting / Dismantling of submerged 60 HP and 40 HP Horizontal motors coupled with 10 cusec and 5 cusec pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers , removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Dogripora Draught Old)
Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job. The executing agency has to provide all types of tools and plants required for execution of the above jobs. (At LIS Dogripora Draught Old)
Disconnecting / Dismantling of submerged 75 HP and 5 HP Horizontal motors coupled with 10 cusec and priming pumping equipments from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assemblies by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Watchi Draught & LIS Kraltang Watchi))
Dismantling of pump assemblies from base frames and Checking of pumps by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. (At LIS Watchi Draught & LIS Kraltang Watchi)
Disconnecting / Dismantling of submerged 60 HP Horizontal motor coupled with 10 cusec pumpingequipment from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. ( At LIS Patikawni)
Dismantling of pump assembly from base frames and Checking of pump by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. ( At LIS Patikawni)
Disconnecting / Dismantling of submerged 60 HP Horizontal motor coupled with 10 cusec pumping equipment from the site of installation and shifting of the same to the safer place at site. The job involves dismantling of the complete motor assembly by using skilled workers, removing of both driven and non-driven bearings, extracting of motor assembly from stator. Complete washing of stator coils, removal of all sort of dirt, dust and muddy substances, applying of highly volatile active chemical for clearing of coils, applying of required heat for removal of moisture. The job includes impregnation of coils and applying of fresh warmish (2 coats) .After impregnation applying of heat up to suitable temperature for drying of coils /stators. The jobs further includes cleaning of extracted bearings with suitable chemical and washing of motor assemblies completely before re installations of motor assemblies. (At LIS Aghanjipora, Dangerpora,Darwal Chersoo and Bunpora Chersoo
Dismantling of pump assembly from base frames and Checking of pump by way of removal of moisturized transmission oil, cleaning of bearings / housing and impeller. Providing / filling of fresh machine oil of suitable grade approx. 4 ltrs up to required levels. The job further includes complete assembling of pumps and motors. No load test at site of work is also involved in the job .The executing agency has to provide all types of tools and plants required for execution of the above jobs. at LIS Aghanjipora, Dangerpora, Darwal Chersoo and BunporaChersoo.
Servicing and maintenance of 5 cusec disel driven mobile pumping equipment installed at Malhura Nayina . The Job comprises of shifting/Dismantling of pump set from the site of installation to workshop, complete servicing of pump set and removal of moisturized machine oil. Complete servicing of 5 HP engine and pumping equipment. The Job involves replacement of disel filter carbon gas cuts. After completer seving, filing of fresh recommended grade machine oil up to required /recommended level. Testing of same on no load. The job includes shifting back of equipment along with all accessories and mounting at site (LIS Kakapora)
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.60 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
BOQ_993078.xls
BOQ • 0.39 MB
NIT14sl2.pdf
PDF • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .