Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹4.1 Cr
EMD Value
₹8.2 L
Closing Date
7 Dec 2026, 2:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer, PWD, WD-II, Diu
O/o. The Executive Engineer, PWD, WD-II, Sewa Bhawan, Fort Road, Diu
Repair, Renovation, Addition, Alteration and Upgradation of Existing Facilities at Government Hospital, Diu
2026_DIUDT_5075_1
e-tender Notice No. 55/2026-27
Open Tender
Civil Works - Others
Works
365 days
Diu
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
The Executive Engineer, PWD, WD-II, Diu
₹8.2 L
The Executive Engineer, PWD, WD-II, Diu
20 Nov 2026
20 Nov 2026
7 Dec 2026
20 Nov 2026
7 Dec 2026
20 Nov 2026
27 Nov 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works | |||||
| 1.01 | EXCAVATION upto 1.50 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in dense or Hard soil MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, cutting vegetation up to 1.5m ht if required and disposing off the excavated stuff upto all lead and lift. Note- All types of soil that can be removed by JCB/ Poclain bucket shall be classified under this item. | 191.25 | CUM | - | - |
| 1.02 | EXCAVATION 1.50 to 3.00 Metre for foundation such as footing, pedestals, walls, drains, columns, ramps, plinth beams, cable trenches in Hard Murrum MECHANICALLY but other than hard rock including shoring, strutting, sorting out and stacking useful material, dewatering where required, and disposing off the excavated stuff upto all lead and lift. | 127.5 | CUM | - | - |
| 1.03 | FILLING with selected & approved available excavated earth (exluding rock) in excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 171.6 | CUM | - | - |
| 1.04 | FILLING with selected & approved Murrum material brought by Contractor from outside client's premises, including Identification of Borrow pits and including Royalty charges & or duties as per requirement of local authority, in foundations, excavated pits, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required with approved locally available materials including spreading in layers not exceeding 200mm, watering, ramming, compacting mechanically using 2 ton compactor etc, complete. Measurements for net volume of space occupied by filling. If desired by the engineer-in-charge the contractor shall at his own expense carry out modified proctor compaction test to determine the maximum dry density. The criteria for acceptance of filling shall be compacting to 95% modified Proctor density with use of mechanical roller/rammer etc complete as directed and instructed by Engineer-in-charge. Volume of material filled to be measured for payment. | 18.75 | CUM | - | - |
| 1.05 | Providing and laying RUBBLE SOLING wherever required in foundation and plinth including hand packing fillings interstices with chips and sand. Watering and compacting to consolidated thickness, etc complete as directed by engineer-in-charge | 11.5 | CUM | - | - |
| 1.06 | Providing and laying Granular subbase (GSB) for preparing base of road, trenches, in plinth, sub-base for of roads, drains, manhole, sumps, or where required by providing close graded Material, mixing in a mechanical mix plant at OMC(Optimum Moisture Content), carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete. | 2.3 | CUM | - | - |
| 1.07 | Providing and laying PLAIN CEMENT CONCRETE 1:2:4 (1- Cement : 2- Coarse sand : 4- graded stone aggregates 20 mm nominal size) in foundations and superstructure including, machine mixing, leveling compacting, curing and formwork if any, scaffolding, staging etc. complete as directed and instructed by Engineer-in-Charge. Volume of PCC laid to be measured for payment. | 20.51 | CUM | - | - |
| 1.08 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Foundations, footings, Base of columns and Mass concrete, as directions of Engineer in charge Complete.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 5.63 | CUM | - | - |
| 1.09 | Providing material and labour for laying machine mixed/machine batched/RMC controlled cement concrete M.300 using graded black trap stone aggregates of maximum 20mm nominal (down graded) size including fine aggregate confirming to IS 383 with minimum cement content as per IS456 (without flyash) for durability shall be followed as per approved design mix & latest IS456 for reinforced cement conrete work for all elements,all floors,all heights/depths, any lead and lift including cost of formwork with sheathing steel , scaffolding, staging, vibrating, compacting, finishing and curing complete but excluding cost of reinforcement for reinforced concrete work in Columns, Pillars posts and struts etc complete as directed by Engineer-incharge.
Preliminary cubes to be prepared on award of work and to be tested to meet the specified requirement for M25 mix, design mix to be approved by the Engineer-in-charge/Architect. Concrete placing shall be done with utmost care, the free drop height shall not exceed 1.5m, and concrete shall be vibrated with immersion type vibrators having frequency not less than 7000 vibrations per second in methodical method so as all points of structures are covered. Free concrete surface shall be covered with Hessian cloth and kept wet. | 17.25 | CUM | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.61 MB
BOQ_5241.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .