Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-AOC | ₹21.7 L | L1 | Accepted-AOC Accept |
| Sl No | Description | Qty | Unit | PERUMAL L1 |
|---|---|---|---|---|
| 1.00 | Cleaning the Jungle and levelling the surfaces using Mechanical JCB as per the Direction of the Departmental officers Etc., Complete | 25 | Hrs | 973 ₹24,325 |
| 2.00 | Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the Departmental officers etc. complete. | 62 | M3 | 220 ₹13,640 |
| 3.00 | Cement concrete 1:4:8 mix (One Cement, Four m.Sand, Eight Aggregate)using 40mm size HBG metal from approved quarry Complying with Standard Specification etc. complete | 10 | M3 | 5,700 ₹57,000 |
| 4.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN FOOTING, PLINTH BEAM STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarina props at suitable intervals etc., complete complying with standard specfication and as directed. | 105 | M2 | 1,100 ₹1,15,500 |
| 5.00 | Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123B Part-II | 118 | M2 | 1,600 ₹1,88,800 |
| 6.00 | Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of m.sand, three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. | 30 | M3 | 11,000 ₹3,30,000 |
| 7.00 | Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning.cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts. | 24.24 | Qtl | 10,000 ₹2,42,400 |
| 8.00 | Flyash Brick work in Cement mortar 1:5 mix (One cement, Five m.Sand) using lind class ground moulded Burnt bricks from Approved Chamber etc. complete | 5 | M3 | 6,984 ₹34,920 |
| 9.00 | Construction of concrete Solid Block masonry in Cement mortar 1:5 mix using I St Class Solid Block as per the direction of the departmental officers etc., complete. | 61 | M3 | 7,000 ₹4,27,000 |
| 10.00 | Plastering for brickwork and concrete surfaces using cement mortar 1:5 (One part of cement, five parts of sand by volume) thickness 12mm (average) for all internal/external surfaces like superstructure, rainwater ducts, elevation | 912 | M2 | 320 ₹2,91,840 |
Tender Value
₹26 L
EMD Value
₹26,000
Closing Date
23 Feb 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Construction of Compound wall for Transfer station at Sugunapuram west in ward no.91, South Zone.
2026_MAWS_659205_12
e20/2026-Two cover
Open Tender
Civil Works
150 days
Coimbatore corporation
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹26,000
17 Apr 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Cleaning the Jungle and levelling the surfaces using Mechanical JCB as per the Direction of the Departmental officers Etc., Complete
Earth work excavation in all soils and Sub Soils with initial lead and lift including all Labour Charges as per the Direction of the Departmental officers etc. complete.
Cement concrete 1:4:8 mix (One Cement, Four m.Sand, Eight Aggregate)using 40mm size HBG metal from approved quarry Complying with Standard Specification etc. complete
Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN FOOTING, PLINTH BEAM STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarina props at suitable intervals etc., complete complying with standard specfication and as directed.
Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123B Part-II
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of m.sand, three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building.
Supplying and fabricating of reinforcement steel of all diameters for reinforced cement concrete works at all heights and depths including straightening, cleaning.cutting,ending, placing in position and binding, hoisting and welding if any including cost of power, electrodes etc, cost of annealed binding wire (18 gauge), providing overlaps, tying in position and providing necessary cover blocks for all works as per detailed drawings supplied (including chairs, cranks, lap rods, spacer bars, fan hooks etc.,) with the relevant standard specifications, complete for all leads & lifts.
Flyash Brick work in Cement mortar 1:5 mix (One cement, Five m.Sand) using lind class ground moulded Burnt bricks from Approved Chamber etc. complete
Construction of concrete Solid Block masonry in Cement mortar 1:5 mix using I St Class Solid Block as per the direction of the departmental officers etc., complete.
Plastering for brickwork and concrete surfaces using cement mortar 1:5 (One part of cement, five parts of sand by volume) thickness 12mm (average) for all internal/external surfaces like superstructure, rainwater ducts, elevation
Painting with plastic emulsion paint in two coats over a base coat of Primer in approved colour and quality etc., complete.
Supply and fixing of M.S. Truss with purlins, Gate and Grills including one coat of red oxide paint as per the Direction of the Departmental oofficers Etc., Complete.
Painting with enamal paint in two coats of approved colour and quality over new iron work etc., complete.
Providing and laying well gravel including cost and conveyance of all materials from approved quarries as noted in lead chart to the road site including loading, unloading and stacking the well gravel at road site to departmental gauge for pre-measurement including labour charges for laying spreading leveling to camper etc., complete as per specifications.,
Filling with quary rubbish in Layer by Layer including Watering and Consolidation and all labour charges for Spreading as per the Direction of the Departmental officers Etc, Complete
Providing flooring with Rubber mould interlocking concrete block flooring over sand cushion including ramming before and after laying of concrete block in200kg/cm2 of compressive strenth as per the direction of the dept off etc., complete.
Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement.
stage.html
html • 0.04 MB
techsummary_791173.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Buildingtwocover.pdf
Tender Documents • 1.34 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_791173.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid