Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.7 LAdmitted-Finance | -16.89% | ₹13.7 L | L1 | Admitted-Finance |
| 2 | L2₹16.1 L+₹2.3 L (17.1%)Admitted-Finance | -2.70% | ₹16.1 L+₹2.3 L (17.1%) | L2 | Admitted-Finance |
| 3 | L3₹16.4 L+₹2.7 L (19.4%)Admitted-Finance | -0.80% | ₹16.4 L+₹2.7 L (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹16.4 L+₹2.7 L (19.7%)Admitted-Finance | -0.50% | ₹16.4 L+₹2.7 L (19.7%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical NA | NA | NA | 121004 | - | - | - | Rejected-Technical AS PER DOCS |
Tender Value
₹16.5 L
EMD Value
₹33,051
Closing Date
24 Jun 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-01 Ward-82 ke antargat Gaus Nagar me Masjid Abu Huraira Park ke paas Abid Ali makan no 40B2C11 ke saamne gali nirmaan karya
2026_NNAMC_1157112_5
24.06.2026 work 12
Open Tender
Civil Works
Percentage
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,006
AS PER DOCS
₹33,051
18 Aug 2026
5 Jun 2026
24 Jun 2026
5 Jun 2026
24 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin damaged brick nali and including stacking of materials with all complete work | 12 | cum | 468 | ₹5,616 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 331.29 | cum | 87.3 | ₹28,921.62 |
| 3 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 36.81 | cum | 160 | ₹5,889.6 |
| 4 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 11.78 | Cum | 3,500 | ₹41,230 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 22.58 | cum | 5,300 | ₹1,19,674 |
| 6 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 112.88 | sqm | 197 | ₹22,237.36 |
| 7 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 110.43 | cum | 1,654.8 | ₹1,82,739.56 |
| 8 | Providing&Laying 100 micron polythene with all complition of work | 1,104.3 | Rmt | 74.88 | ₹82,689.98 |
| 9 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 132.52 | Cum | 8,200 | ₹10,86,664 |
| 10 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 1.09 | Cum | 9,300 | ₹10,137 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_2168232.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .