Loading…
Loading…
Tender Value
₹16.5 L
EMD Value
₹33,051
Closing Date
24 Jun 2026, 3:00 pm
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-01 Ward-82 ke antargat Gaus Nagar me Masjid Abu Huraira Park ke paas Abid Ali makan no 40B2C11 ke saamne gali nirmaan karya
2026_NNAMC_1157112_5
24.06.2026 work 12
Open Tender
Civil Works
90 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,006
AS PER DOCS
₹33,051
5 Jun 2026
5 Jun 2026
24 Jun 2026
5 Jun 2026
24 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismentling of existin damaged brick nali and including stacking of materials with all complete work | 12 | cum | 468 | ₹5,616 | BI01010001010000000000000515BI0100001097 |
| 2 | Earth work cutting/Filling of embankment lead 30 m and up to 1.5 m lift with all complete work (S.I.No.253) | 331.29 | cum | 87.3 | ₹28,921.62 | BI01010001010000000000000515BI0100001127 |
| 3 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 36.81 | cum | 160 | ₹5,889.6 | BI01010001010000000000000515BI0100001135 |
| 4 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 11.78 | Cum | 3,500 | ₹41,230 | BI01010001010000000000000515BI0100001129 |
| 5 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 22.58 | cum | 5,300 | ₹1,19,674 | BI01010001010000000000000515BI0100001111 |
| 6 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 112.88 | sqm | 197 | ₹22,237.36 | BI01010001010000000000000515BI0100001109 |
| 7 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 110.43 | cum | 1,654.8 | ₹1,82,739.56 | BI01010001010000000000000515BI0100001107 |
| 8 | Providing&Laying 100 micron polythene with all complition of work | 1,104.3 | Rmt | 74.88 | ₹82,689.98 | BI01010001010000000000000515BI0100001091 |
| 9 | Cement Concrete work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work | 132.52 | Cum | 8,200 | ₹10,86,664 | BI01010001010000000000000515BI0100001121 |
| 10 | R.CC work (1:1.5:3) with cement course sand &20mm the stone grit including all complete work (S.I.No.279B) | 1.09 | Cum | 9,300 | ₹10,137 | BI01010001010000000000000515BI0100001123 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_2168232.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid