Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | -40.60% | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 L+₹44,550 (7.58%)Admitted-Fee/PreQual/Technical/Finance | -36.10% | ₹6.3 L+₹44,550 (7.58%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.4 L+₹1.5 L (25.3%)Admitted-Fee/PreQual/Technical/Finance | -25.57% | ₹7.4 L+₹1.5 L (25.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.7 L+₹1.8 L (30.1%)Admitted-Fee/PreQual/Technical/Finance | -22.70% | ₹7.7 L+₹1.8 L (30.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.7 L+₹1.8 L (31.1%)Admitted-Fee/PreQual/Technical/Finance | -22.12% | ₹7.7 L+₹1.8 L (31.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.9 L
EMD Value
₹29,700
Closing Date
27 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
CONSTRUCTION OF FOOTBRIDGE AT SAESKOON BADROO 26
2026_RDPR_320618_10
e- NIT No. 65 OF REWK/PRI/2026-27 Dated 12-08-2026
Open Tender
Civil Works
Percentage
40 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
EX ENGINEER REW KULGAM
₹29,700
Yes
12 Sept 2026
12 Aug 2026
29 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pumping out water in trenches by mechanical pump and Diversion. | 1 | job | - | - |
| 2 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed | 48.9 | cum | - | - |
| 3 | P / L dry stone solling hand packed including plums and all carriages. | 6.63 | cum | - | - |
| 4 | P/L cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:4:8)mix.1cement 4coarse sand 8 stone aggregates. | 2.03 | cum | 1 | ₹2.03 |
| 5 | P/L reinforced cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:2:4)mix.1cement 2coarse sand 4 stone aggregates. | 10.41 | cum | - | - |
| 6 | P/L reinforced cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:1.5:3)mix.1cement 1.5coarse sand 3 stone aggregates. | 4.52 | cum | - | - |
| 7 | P/L reinforced cement concrete of specified grade excluding cost of centring and shuttering all works up to plinth level.(1:1.5:3)mix.1cement 1.5coarse sand 3 stone aggregates. | 24 | cum | - | - |
| 8 | Formwork of ordinary timber planks for in situ concrete work.and removal of the same . | 28.99 | sqm | - | - |
| 9 | Formwork of ordinary timber planks for in situ concrete work.and removal of the same . | 26.76 | sqm | - | - |
| 10 | Formwork of ordinary timber planks for in situ concrete work.and removal of the same . | 86.19 | sqm | 1 | ₹86.1 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1066431.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .