| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹72,471.86 (5.00%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.5 L+₹1.0 L (7.10%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L3 | Rejected-Finance L3 |
Tender Value
₹14.5 L
EMD Value
₹18,200
Closing Date
28 Jan 2025, 11:00 amClosed
Area Engineer ENM, Jhanjra Area
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Transportation, Installation, necessary fabrication, commissioning trial run of 1200mm width,2 150kW,6.6kV Double drive belt conveyor for a length of 120mtr and extension for 280 mtr. in length 7 times shifting along Trunk Road-6 T-6 West Side, Sect
2025_ECL_325729_1
ECL/GM/JNR/EnM/A2/24-25/112 dated 11.01.2025
Open Tender
Miscellaneous Works
Item Rate
45 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹18,200
24 Jun 2025
17 Jan 2025
29 Jan 2025
17 Jan 2025
28 Jan 2025
18 Jan 2025
17 Jan 2025 - 24 Jan 2025
Amount
Part A: Installation of Link Belt along Trunk Road-6(T-6)West Side for 120 metre
Transportation of the 1200mm width, 2x150kW, 6.6kV Drive Head complete including gear box, motor(150kW/6.6kV), base frame, couplings, bearing blocks, fencing etc from surface by MUV and installation as per mine plan with necessary fabrication job.
Transportation of Discharge Unit complete with girders, strike plate, chute plates, scrappers etc from surface by MUV and installation as per mine plan(at 55R(R-V Seam)) with necessary fabrication job.
Transportation of Tail End Unit complete with fencing from surface by MUV and installation as per mine plan(55R(R-V Seam)) with necessary fabrication job.
Transportation of Loop Take-up Unit Complete with fencing from surface by MUV and installation as per mine plan(55R(R-V Seam)) with necessary fabrication job.
Transportation of 120mtr. 1200mm belt conveyor structure complete with stringer, foot stool, top bracket, top & bottom roller etc. from surface to 48D/between-1L & -2L by MUV and installation as per mine plan in R-V seam.
Transporting, laying, lapping & jointing of 280 mtr. of belting(40 mtr in Loop take-up Unit).
Transportation of one 6.6kV, 2X150 kW DOL HT Starter Surface to 48D/in between -1L and -2L(R-V Seam) after loading it on MUV then unloading and placing manually on platform.
Transportation of one 6.6kV, 400A VCB from Surface to 48D/in between -1L and -2L(R-V Seam) after loading it on MUV then unloading and placing manually on platform.
Transportation of 340 mtr of 6.6kV grade 35 sq.mm. PVC/DWA cable from Surface to 45D/in between -1L and -2L and laying-hanging of this cable of 45D/in between -1L to -2L to incoming of 6.6kV,400A VCB.
Transportation of 340 mtr belt sequence cable from surface to 45D/in between -1L and -2L and laying-hanging of this cable from 45D/in between -1L to -2L to 6.6kV, 2X150 kW DOL HT Starter
Transportation of pull cords with its cable, communication devices with its cable, signaling system (8-SWG GI wire, bobbin insulators & 3/8" x 3" MS Bolt-nut) from surface to proposed link belt installation site (R-V seam) for 400mtr. belt and laying-hanging them as per mine plan in R-V seam.
Testing, trial run, alignment & commissioning of this belt conveyor as per mine plan in R-V seam.
Supply of G.I Wire 8 SWG
Supply of Bobbin insulators
Supply of MS Nut & Bolt (5/8" x 3") with washer
Supply of DA & Oxygen Cylinder Oxygen-1 cylinder,DA-1 cylinder
Supply of MS Nut-Bolt of 5/8" X 2"
Civil foundation for this belt drive head as per mine plan, Platform for VCB and Starter.
Part B: Extension of Link Belt along Trunk Road-6(T-6) West Side for 280 metre
Transportation of 280mtr. 1200mm belt conveyor structure complete with stringer, foot stool, top bracket, top & bottom roller etc. from surface to 48D/between -1L &-2L by MUV and installation as per mine plan in R-V seam.
Transporting, laying, lapping & jointing of 560 mtr. of belting
Dismantling of Tail-Unit Complete
Transportation, installtion, and grouting of tailend unit complete
Extension of pull cord, signalling and grouting and lockout devices
Supply of G.I. wire 8 SWG
Supply of Bobin insulator
Supply of M.S Nut & Bolt (3/8"x 3") with washer
Supply of M.S Nut & Bolt (5/8"x 2") with washer
Total impact of GST for the purpose of CTC
N.K. ENTERPRISE (BID ID -1120025)
F.R. ENTERPRISE (BID ID -1120051)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .