| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
21 Dec 2023, 5:00 pmClosed
dmo
Collector office chandrapur
E3_Transformer/01-2023
2023_CHDPR_957448_1
E3_Transformer/01-2023
Open Tender
Civil Works - Others
Item Rate
112 days
Chandrapur Cancer Care Foundation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
Chandrapur Cancer Care Foundation,
5 Mar 2024
26 Oct 2023
26 Dec 2023
26 Oct 2023
21 Dec 2023
26 Oct 2023
1 Nov 2023
Amount
E3-Transformer BOQ
Design, manufacture, supply, installation, testing and commissioning of following transformers: Supply of continuous duty cycle, 11kV/ 415V or 433V, 3 phase, 50Hz, Dyn-11 vector group, step down, indoor type, copper strip wound, dry type - Resin Casted transformer complete with vacuum type OLTC, RTCC & AVR and with all accessories, including winding temperature scanner with alarm and trip contact, fittings and conforming to specifications. Tap changing range shall be +15% to -15% in steps of 2.5%. Transformer shall have cable box for 11kV XPLE cable on HT side & LV Cable box/ Busduct box on 415V or 433V voltage side. One set of 11KV surge suppressor at 11KV and one set of 415V or 433V surge suppressor at 415V or 433V side. Control wiring for from trafo. to RTCC and AVR shall be included in the cost. Transformer shall meet latest ECBC code of India on NO LOAD & ON LOAD power losses. Transformer to be as per technical specifications and any deviation to be submitted with quotation. 1500 KVA capacityContractor / Equipment manufacturer to ensure Transformer design asper MSEDCL requirement and approved GA from MSEDCCL before manufacture asper requirement , also vendor to check proper location of equipment asper site with proper dimension available 3.ITC =Performance Testing & Inspection ( ITC package, including , shifting to excat location and help OEM for assembly unit for installation supporting asper approved specification (, ms support ) , commisioning of unit with coordination MEP vendor , LTpanel , transformer , and MSEDCL team work etc ) 2 Nos - 1500 KVA Capacity
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .