Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
16 Dec 2025, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sukhoi Engine Division, Koraput
Sukhoi Engine Division, Koraput
REQUEST FOR INFORMATION TO IDENTIFY INTERESTED INDIAN INDUSTRY FOR THE ESTABLISHMENT OF 20,000 TON ISOTHERMAL FORGING PRESS FACILITY
22846
HBS/HAL/KPT/SED/UDS/1-1/2025/153
IMM
Mig Complex- Sukhoi Eng Divn
₹0
Exempted
16 Dec 2025
30 Sept 2025
30 Sept 2025
16 Dec 2025
Information to be submitted for evaluation of RFI (Please mention N.A wherever not applicable)
Sl Details on Information to be submitted for Evaluation of RFI Interested Party Remark
1 Details of the financial strength (like Net worth, annual turnover & profit for last 3 years i.e FY:2022-23, FY:2023-24, FY:2024-25). Please submit the details along with audited documents in separate sheet for evaluation criteria as per 6.2.1 of this RFI. The financial statement shall be audited by a statutory auditor and be complete including all notes of the financial statement. In case of Consortium, documents pertaining to the Lead bidder as well as all the other members of Consortium need to be submitted.
2 Present Technical capabilities in forging and related industries & aerospace certifications. Please submit the details in separate sheet for evaluation criteria as per para 6.2.2 of this RFI. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
3 Past experience in forging and related industries. Please enclose & submit the details in separate sheet for evaluation criteria as per para 6.2.3 of this RFI. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
4 Brief covering the details on technical capability, Design capability, certification plan, Project implementation plan with timeline, Business plan, Balance Capacity Utilization plan and other parameters as per evaluation criteria 6.2.4 of this RFI to be submitted along with bid and presentation to be made to the committee of HAL for scoring and evaluation. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
5 Current status and plan/Purchase order if any on establishment of 20000Ton Isothermal Press. Pease submit the details and supporting document if any for evaluation criteria as per para 6.2.5 of this RFI. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
6 Details of existing plant facilities, machineries, testing equipment and Lab/infrastructure. Please submit the details and enclose necessary supporting document for information. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
7 Details of foreign collaboration if any (indicate product, name & address of collaborator, year of collaboration, whether current or not etc.) for information. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
8 Type of work/jobs executed by the organization/firm in last 5 years Please enclose separate sheets for information. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
9 Details of current Non-Indian national interest/ stakes in the company may please be submitted for information. The Sole bidder or in case of Consortium, Lead bidder should submit the details.
10 I. In case of Consortium, documentary proof/ notary copy of the formation of Consortium to be submitted by the Lead bidder of Consortium. II. Lead bidder of the Consortium should submit a written undertaking from all consortium members, duly signed by the authorized signatory, holding a written special power of attorney for this bid on a stamp paper, authorizing the lead bidder to incur liabilities and receive instructions for and on behalf of any and all consortium members, during the entire execution of the Contract, including but not limited to payments.
11 Financial stability: An undertaking (self-attested) shall be submitted, stating that there has been or is no outstanding bankruptcy, judgment or pending legal action that could impair operations as a going concern. Also, the Bidder/Consortium Members must be solvent. The Sole Bidder or in case of a consortium all Members of the Consortium shall submit Certificate signed by the authorized signatories.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
RFINOTIFICATION.pdf
TENDER_DOCUMENT • 1.17 MB
CLARIFICATIONTOQUERIES.pdf
TENDER_DOCUMENT • 0.42 MB
REVISEDAPPENDIXD.pdf
TENDER_DOCUMENT • 0.17 MB
APENDIXXE2.xlsm
TENDER_DOCUMENT • 0.01 MB
RequestForInformation.pdf
TENDER_DOCUMENT • 0.80 MB
APPENDIXA.pdf
TENDER_DOCUMENT • 0.42 MB
APPENDIXB.pdf
TENDER_DOCUMENT • 0.18 MB
APPENDIXC.pdf
TENDER_DOCUMENT • 0.20 MB
APPENDIXE1.pdf
TENDER_DOCUMENT • 0.35 MB
NDAFORMAT.pdf
TENDER_DOCUMENT • 0.76 MB
APPENDIXD.pdf
TENDER_DOCUMENT • 0.17 MB
APPENDIXE2.pdf
TENDER_DOCUMENT • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .