Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 LAccepted-Finance 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L1 | Accepted-Finance Agreement With L1 | |
| 2 | L2₹19.6 L+₹2.8 L (16.8%)Rejected-Finance | L2 | Rejected-Finance Agreement With L1 | |
| 3 | L3₹20.4 L+₹3.6 L (21.7%)Rejected-Finance | L3 | Rejected-Finance Agreement With L1 | |
| 4 | L4₹20.5 L+₹3.7 L (22.3%)Rejected-Finance | L4 | Rejected-Finance Agreement With L1 | |
| 5 | Rejected-Technical 05 BABA PALACE MUSRIGHARARI JANDAHA ROAD MUSRIGHARARI SAMASTIPUR BIHAR 848101 | SAMASTIPUR | BIHAR | 848101 | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | MUKESH TYAGI L3 | SIDDHI VAANI CONSTRUCTIONS L4 | M/s Ajay Kumar Contractor L1 | M/S PRANALI INFRATECH PVT LTD L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | 6.44 | CuM. | 130 ₹837.2 Lowest | 630 ₹4,057.2 | 500 ₹3,220 | 602 ₹3,876.88 |
| 2.00 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 31.38 | CuM. | 515 ₹16,160.7 | 515 ₹16,160.7 | 500 ₹15,690 | 493 ₹15,470.34 Lowest |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 138.17 | CuM. | 67 ₹9,257.39 | 98 ₹13,540.66 | 9 ₹1,243.53 Lowest | 90 ₹12,435.3 |
| 4.00 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | 27.75 | CuM. | 6,285 ₹1,74,408.75 | 6,200 ₹1,72,050 | 5,000 ₹1,38,750 Lowest | 5,977 ₹1,65,861.75 |
| 5.00 | Providing & laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 24.1 | CuM. | 7,490 ₹1,80,509 | 7,450 ₹1,79,545 | 6,800 ₹1,63,880 Lowest | 7,121 ₹1,71,616.1 |
| 6.00 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | 82.9 | CuM. | 8,440 ₹6,99,676 | 8,420 ₹6,98,018 | 7,000 ₹5,80,300 Lowest | 8,020 ₹6,64,858 |
| 7.00 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 126.57 | SqM. | 570 ₹72,144.9 | 570 ₹72,144.9 | 180 ₹22,782.6 Lowest | 545 ₹68,980.65 |
| 8.00 | Centering and shuttering for RCC T- Beam bridge,syphon,aqueduct,& box culvert above 3 m span including cost of all material, T&P & labours complete( per SqM.) | 193.24 | SqM. | 1,145 ₹2,21,259.8 | 1,140 ₹2,20,293.6 | 180 ₹34,783.2 Lowest | 1,093 ₹2,11,211.32 |
| 9.00 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 6.89 | M.T. | 74,605 ₹5,14,028.45 | 74,500 ₹5,13,305 | 90,000 ₹6,20,100 | 70,880 ₹4,88,363.2 Lowest |
| 10.00 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | 3.2 | R.M. | 275 ₹880 | 275 ₹880 | 700 ₹2,240 | 266 ₹851.2 Lowest |
Tender Value
₹20.6 L
EMD Value
₹41,200
Closing Date
25 Aug 2026, 11:00 amClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER ANOOPSHAHAR BRANCH DIVISION GANGA CANAL MEERUT
TN-05/EE/2026-27 Reconstruction work of the damaged bridge located at Km 21.696 of Garhmukteshwar Rajbaha.Lot No-26
2026_UPIDC_1176988_38
TN-05/EE/2026-27
Open Tender
Civil Works
Piece-work
90 days
As Per NIT
As per NIT and TD
3 documents required · 3 mandatory
₹944
₹41,200
25 Sept 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. | - | CuM. | - | - |
| 2 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. | 1 | CuM. | - | - |
| 3 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. | 1 | CuM. | - | - |
| 4 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) | - | CuM. | - | - |
| 5 | Providing & laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | - | CuM. | - | - |
| 6 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) | - | CuM. | - | - |
| 7 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) | 1 | SqM. | - | - |
| 8 | Centering and shuttering for RCC T- Beam bridge,syphon,aqueduct,& box culvert above 3 m span including cost of all material, T&P & labours complete( per SqM.) | - | SqM. | - | - |
| 9 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge | 1 | M.T. | - | - |
| 10 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete | - | R.M. | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.40 MB
Tendernotice_2.pdf
PDF • 1.99 MB
BOQ_2212033.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .