| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.7 LAccepted-AOC | L1 | Accepted-AOC work order | |
| 2 | L2₹59.0 L+₹2.3 L (3.97%)Rejected-Finance SOUTH THOTTAM PALAKKANTHU PO DINDIGUL WEST TALUK DINDIGUL 624 019 TAMIL NADU | 624019 | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | S.RAVI CONTRACTOR L1 | S PRABHU SELVARAJ CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.001) Providing Cement Concrete road at Palayakottai Papathi House to Bagavan temple H/ O murunellikottai ESTIMATE COST : 19.80 Lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 32.58 | Cum | 262 ₹8,535.96 Lowest | 272 ₹8,861.76 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 126.69 | Cum | 5,353 ₹6,78,171.57 Lowest | 5,567 ₹7,05,283.23 |
| 4.00 | Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete. | 298.65 | Sqm | 546 ₹1,63,062.9 Lowest | 568 ₹1,69,633.2 |
| 5.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete. | 120.13 | Cum | 6,658 ₹7,99,825.54 Lowest | 6,924 ₹8,31,780.12 |
| 6.00 | Provision for Bittumennpad | 16.5 | Sqm | 234 ₹3,861 Lowest | 243 ₹4,009.5 |
| 7.00 | Provision for Name board charges | 1 | nos | 1,000 ₹1,000 Lowest | 1,040 ₹1,040 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 2,97,802.25 ₹2,97,802.25 Lowest | 3,09,709.41 ₹3,09,709.41 |
| 9.0002) Construction of Minor Bridge at Salaiyur H/ O Murunellikotai ESTIMATE COST : 37.71 Lakhs | |||||
| 10.00 | Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B | 108.41 | Cum | 262 ₹28,403.42 Lowest | 272 ₹29,487.52 |
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
6 Jan 2026, 3:00 pmClosed
The Project Director DRDA Dindigul
The Project Director DRDA Dindigul
Providing CC Road with Minor Bridge in Reddiyarchatram block of Dindigul District TN05-20
2025_RDTN_637239_1
Roc.No.6746-2025-Tender
Open Tender
Civil Works
Item Wise
180 days
DRDA DINDIGUL
Providing CC Road with Minor Bridge in Reddiyarchatram block of Dindigul District TN05-20
2 documents required · 2 mandatory
₹0
₹58,000
DRDA DINDIGUL
20 Feb 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
2 Jan 2026
1) Providing Cement Concrete road at Palayakottai Papathi House to Bagavan temple H/ O murunellikottai ESTIMATE COST : 19.80 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of centering for sides and soffits of cc works including cost and conveyance of all materials to site and all labour charges etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Provision for Bittumennpad
Provision for Name board charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
02) Construction of Minor Bridge at Salaiyur H/ O Murunellikotai ESTIMATE COST : 37.71 Lakhs
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub Structure
Super Structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
PCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing Weep Holes in Brick masonary reinforced cc with 100mm Dia AC pipe extending through the full witdth of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and fixing Kraft paper full width of deck slab and including cost and conveyance to work site, labour for fixing the same in corect position and all other incidental charges etc.,complete as per standard specifications.
Name Board cgarges
Construction of Retaining wall
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub Structure
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_762661.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .