| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.4 CrAdmitted-Finance | ₹61.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹61.9 CrAdmitted-Finance | ₹61.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical MOH BIRIYAGANJ TILHAR SHAHJAHANPUR UP | SHAHJAHANPUR | UTTAR PRADESH | 242001 | - | - | Rejected-Technical Reject as per prahari committe |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject as per prahari committe |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject as per prahari committe |
| Sl No | Description | Qty | Unit | mathiyan construction pvt. ltd. L2 | C S Infraconstruction Limited L1 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 1,65,000 | Sqm | 18 ₹29.7 L | 18 ₹29.7 L |
| 2.00 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. | 28,875 | cum | 113 ₹32.6 L | 113 ₹32.6 L |
| 3.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 3,12,832.15 | cum | 310 ₹9.7 Cr | 300 ₹9.4 Cr |
| 4.00 | Construction of sub-grade with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 76,835 | cum | 315 ₹2.4 Cr | 305 ₹2.3 Cr |
| 5.00 | Construction of granular sub-base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401 | 21,966.01 | cum | 3,800 ₹8.3 Cr | 3,765 ₹8.3 Cr |
| 6.00 | Providing, laying, spreading and compacting graded stone aggregate in layers wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 15,834.31 | cum | 4,900 ₹7.8 Cr | 4,860 ₹7.7 Cr |
| 7.00 | Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam (Stabilization with emulsion3.5%and cement 1%) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification. (ETA) | 13,216.78 | cum | 8,230 ₹10.9 Cr | 8,230 ₹10.9 Cr |
| 8.00 | Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. | 1,01,667.5 | Sqm | 13 ₹13.2 L | 13 ₹13.2 L |
| 9.00 | Providing and laying Dense graded Bituminous Macadam with hot mix plant producing an average output of 75 ton per hour using crused aggregates of specified grading premixed with bituminous binder VG-40 @ 4.00% of mix, transported to site , laid over previously prepared surface with paver finisher to the required grade , lavel and alignment and rolled to achieve the desired compaction. as per MORT&H Specification. No 507 . | 9,150.08 | cum | 11,348 ₹10.4 Cr | 11,348 ₹10.4 Cr |
| 10.00 | Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Below DBM 1st layer, 2nd layer and BC | 1,01,667.5 | Sqm | 13 ₹13.2 L | 13 ₹13.2 L |
Tender Value
₹59.2 Cr
Closing Date
24 Nov 2021, 12:00 pmClosed
se.ayo.ambe.circle.pwd.ayodhya
office of the se.ayo.ambe.circle.pwd.ayodhya
Construction of Goshaiganj Bazaar Bypass.
2021_CEUFZ_641776_3
6317/2com, Date-10.11.2021
Open Tender
Civil Works - Roads
547 days
office of the se.ayo.ambe.circle.pwd.ayodhya
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
Exempted
office of the se.ayo.ambe.circle.pwd.ayodhya
14 Dec 2021
18 Nov 2021
24 Nov 2021
18 Nov 2021
24 Nov 2021
18 Nov 2021
20 Nov 2021
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of sub-grade with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
Providing, laying, spreading and compacting graded stone aggregate in layers wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing,laying, spreading and compacting graded stone aggregate to wet mix mcacdam (Stabilization with emulsion3.5%and cement 1%) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC Cement+3.50% Emulsion in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per clause 406 of Morth specification. (ETA)
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying Dense graded Bituminous Macadam with hot mix plant producing an average output of 75 ton per hour using crused aggregates of specified grading premixed with bituminous binder VG-40 @ 4.00% of mix, transported to site , laid over previously prepared surface with paver finisher to the required grade , lavel and alignment and rolled to achieve the desired compaction. as per MORT&H Specification. No 507 .
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Below DBM 1st layer, 2nd layer and BC
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade on M-15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
5Th KM Stone (Precast)
Ordinary KM Stone (Precast)
Hecto Meter Stone(Precast)
Electric Poles and all assisorises @25 meter between pole to pole( Analysis Per Pole)
Earth-work Excavation in trenches for foundations pipes, cable etc,(Loan clay or sand) including lift upto 1.5m lead upto 50m. And dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c within ahead of 30m.
Providing and laying in Cement concrete 1:3:6 (1Cement:3 Coarse sand :6 graded Stone aggregate 40mm nominal size) and curing complete,including cost fo formwork in foundation and floors.
Class-150 brick work in 1:3 Cement and Coarse sand of mortar infoundation and plinth including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
Class-150 brick work in 1:3 Cement and Coarse sand of mortar in Super Structure including supply of all materials, labour and tools and plants,etc ,required for proper completion of the work.
R.C.C. work with cement approved coarse sand and 2cm (3/4'') gauge approved srone ballast in the proportion 1:1.5:3 (1Cement: 1.5 Coarse Sand and 3 Stone grit 20 mm size) in lintels of doors and windows excluding supply of reinforcement and its bending but including its fixing and binding the same necessary with 24BWG binding wire and including necessary centering and shuttering etc. and also including supply of materials labour and tools and plants etc. required for proper completion of the work, strength of the concrete shall not be less than M-200
Mild steel or iron in plan work such as reinforced concrete or reinforced brick work(When not included in an overall rates). Wrought to required shape as necessary including bending for proper completionof the work and including supply of steel its wastage bend hooks and authorised ovelapping shall be measured upto floor two level.
Supplying and laying one layer of tar felt or any other equivalent approved material at the junction of wall and roof of any place an roof as per direction of E/I including necessaryoverlap, giving a coat of approved mastic paint belowthe Tar felt and including supply of all materials , labour and tools and plants etc.Required for propercompletion of work fix as per standard.
Supply and fixing of 10cm internal Dia Ac Down pipes required for proper completion of work in weep holes.
Providing and laying in Cement concrete 4:2:1 of not less than strength of M150stone ballast (20 mm nominal size grit) Ratio 2 approved coarse sand ratio 1 Cement.
Struck Pointing on brick work with cement mortar 1:2 (1Cement :2 sand)
Back filling behind abutment, wing wall and retaining wall complete as per drawing and technical specification clause 1204.3.8 of MORD specification.
mathiyan construction pvt. ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 0.15 MB
SBD.pdf
Tender Documents • 0.13 MB
BOQ_1010645.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid