Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 612 DIWAN ESTATE AMBEDKAR GALI HARSH VIHAR EAST DELHI DELHI 110093 | NORTH EAST DELHI | DELHI | 110093 | L1 | Accepted-AOC Firm is L1 | |
| 2 | L2₹23.9 L+₹46,816.14 (1.99%)Rejected-Finance 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | L2 | Rejected-Finance Firm is not L1 | |
| 3 | L3₹29.1 L+₹5.6 L (23.8%)Rejected-Finance PANCHWATI NAGAR KUNHARI KOTA RAJ | KOTA | KOTA | RAJASTHAN | L3 | Rejected-Finance Firm is not L1 |
Tender Value
₹27.6 L
EMD Value
₹55,175
Closing Date
14 Feb 2023, 1:00 pmClosed
CE CSCTPP
CSCTPP, Motipura Chowki Chhabra
Annual Contract for Routine, Breakdown and Capital Maintenance of Air-conditioning Systems, Evaporative cooling Systems, Window/ Split Air Conditioners, Water Cooler and Refrigerators at 2x660 MW CSCTPP Chhabra
2023_RRVUN_316833_1
TN-SC-335/2022-23(Elect.)
Open Tender
Repair and Maintenance Works
Percentage
365 days
CSCTPP, Motipura Chowki Chhabra
Please refer NIT docs
2 documents required · 2 mandatory
₹1,180
Accounts officer CSCTPP, Chhabra
₹55,175
27 May 2023
1 Feb 2023
15 Feb 2023
1 Feb 2023
14 Feb 2023
1 Feb 2023
Operation of Central Air Conditioning Plant, Evaporative Cooling Plant & Package Air- Conditioners in round-the-clock shifts (03 no. of 8-hour shifts per day )
skilled labour
semi-skilled labour
Providing assistance in routine maintenance of Central Air Conditioning Plant, Evaporative Cooling Plant, Package Air conditioners, Window/ Split Air conditioners, Water Coolers in general shift in Plant and Supercritical Field Hostel.
skilled labour per day
semi-skilled labour per day
Cleaning of Air Conditioning AHU, Air Washer, Air washer fins, Chiller, Main Cooling Towers including fills, Pump and piping arrangement, Package water tank and Air Washer Water Tanks after flushing, cleaning and refitting of filters, diffuser / grills and Package Air Conditioning, water tank of water cooler.
Providing assistance in monitoring and maintenance of AC System by deploying 01 no. Supervisor (Diploma Holder) in general shift.
Bidder Name
Amount
UNIVERSAL ENGINEERS(GSTN-08AGYPG1844L1ZS)
M/s Kumar Air Conditioning Engineers(GSTN-NA)
M/s. RISHAB ENGINEERING WORKS, KOTA(GSTN-NA)
UNIVERSAL ENGINEERS
M/s. RISHAB ENGINEERING WORKS, KOTA
UNIVERSAL ENGINEERS
M/s. RISHAB ENGINEERING WORKS, KOTA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .