Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC | L1 | Accepted-AOC L1 bidder |
Tender Value
₹48.0 L
EMD Value
₹60,000
Closing Date
24 Nov 2023, 11:00 amClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 76 nos. bricks ventilation stoppings in different panel of G-IIA seam, G-III top seam and G-III bottom seam at Bagdewa UG Mine.
2023_SECL_293290_1
SECL/KB/GM/SO(M)/eNIT/23-24/24
Open Tender
Civil Works - Buildings
Item Rate
300 days
Korba
As per NIT
3 documents required · 3 mandatory
₹60,000
6 Feb 2024
8 Nov 2023
25 Nov 2023
8 Nov 2023
24 Nov 2023
9 Nov 2023
8 Nov 2023 - 13 Nov 2023
Amount
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Loading of material (Bricks) into tub on surface within a lead of 50m.
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate)
Manual pushing of (Brick) tubs in underground for every 30m. or part thereof in excess of first 30m. (Lead 897m)
Manual pushing of (Cement) tubs in underground for every 30m. or part thereof in excess of first 30m. (Lead 897m)
Manual pushing of (Sand) tubs in underground for every 30m. or part thereof in excess of first 30m. (Lead 897m)
Brick work with flyash F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.1.2
Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand). DSR Item No. 6.32.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_303783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .