Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.4 LAccepted-Finance | ₹17.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹17.4 L+₹2,626.68 (0.15%)Rejected-Finance | ₹17.4 L+₹2,626.68 (0.15%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Thirumalai Contractor L2 | Selvam L1 |
|---|---|---|---|---|---|
| 1.00Constructoin of 30000 litre OHT at Thendral Nagar H/O Seekarajapuram panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 55.13 | cum | 280 ₹15,436 | 260 ₹14,334 Lowest |
| 3.00 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | 1.73 | cum | 1,800 ₹3,114 | 1,730 ₹2,993 Lowest |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.46 | cum | 5,500 ₹19,030 | 5,400 ₹18,684 Lowest |
| 5.00Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | |||||
| 6.00 | Items 1.50 m to 4.50m below GL | 7.58 | cum | 8,686.58 ₹65,879 | 8,600 ₹65,222 Lowest |
| 7.00 | UP Below GL | 1.68 | cum | 9,486.17 ₹15,946 Lowest | 9,486.17 ₹15,946 Lowest |
| 8.00 | Items 0.0 to 4.50m Above GL | 2.83 | cum | 9,486.17 ₹26,846 Lowest | 9,486.17 ₹26,846 Lowest |
| 9.00 | Above 4.51m and Upto 7.32Ht m | 2.22 | cum | 9,764.06 ₹21,715 Lowest | 9,764.06 ₹21,715 Lowest |
| 10.00 | Above 7.32m and Upto 10.98 m | 2.53 | cum | 9,764.06 ₹24,674 Lowest | 9,764.06 ₹24,674 Lowest |
Tender Value
₹17.4 L
EMD Value
₹17,604
Closing Date
11 Feb 2026, 3:00 pmClosed
The Village President
The Village President,Seekarajapuram
Constructoin of 30000 litre OHT at Thendral Nagar H/O Seekarajapuram panchayat
2026_RDTN_654189_1
01/2025
Open Tender
Civil Works
Item Rate
120 days
Panchayat Office, Seekarajapuram
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹17,604
1 Sept 2026
10 Feb 2026
11 Feb 2026
10 Feb 2026
11 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Constructoin of 30000 litre OHT at Thendral Nagar H/O Seekarajapuram panchayat | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 55.13 | cum | 263.78 | ₹14,542.19 |
| 3 | Sand filling with clear river sand including watering, consolidation etc.,complete for Foundation as directed by Bdo officers | 1.73 | cum | 1,736.95 | ₹3,004.92 |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.46 | cum | 5,449.97 | ₹18,856.9 |
| 5 | Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | - | - | - | - |
| 6 | Items 1.50 m to 4.50m below GL | 7.58 | cum | 8,686.58 | ₹65,879.02 |
| 7 | UP Below GL | 1.68 | cum | 9,486.17 | ₹15,946.25 |
| 8 | Items 0.0 to 4.50m Above GL | 2.83 | cum | 9,486.17 | ₹26,845.86 |
| 9 | Above 4.51m and Upto 7.32Ht m | 2.22 | cum | 9,764.06 | ₹21,715.27 |
| 10 | Above 7.32m and Upto 10.98 m | 2.53 | cum | 9,764.06 | ₹24,673.78 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_784441.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .