Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | L1 | Accepted-AOC Selected through Lottery | |
| 2 | L1₹10.8 LRejected-AOC AT PO JUNA DIST KENDRAPARA 754213 | JUNA | KENDRAPARA | ODISHA | 754213 | L1 | Rejected-AOC Not Selected in Lottery | |
| 3 | L1₹10.8 LRejected-AOC | L1 | Rejected-AOC Not Selected in Lottery | |
| 4 | L1₹10.8 LRejected-AOC | L1 | Rejected-AOC Not Selected in Lottery | |
| 5 | L1₹10.8 LRejected-AOC | L1 | Rejected-AOC Not Selected in Lottery |
Tender Value
₹10.8 L
EMD Value
₹10,802
Closing Date
18 Sept 2026, 5:00 pmClosed
DFO Bamra WL Division
O/o the DFO Bamra WL Division
Building Works
2026_DFOBW_139744_1
1F-BMB/06/dt.28.08.26/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
90 days
Ghrusaguda
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,802
11 Oct 2026
31 Aug 2026
19 Sept 2026
31 Aug 2026
18 Sept 2026
31 Aug 2026
31 Aug 2026 - 18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation of foundation in hard or gravelly soil within initial lead of 50m and initial lift of 1.5m including dressing the sides, leveling the bed and depositing the excavated materials away from the work site, shoring etc if required, complete the item of work in all respect as per direction of the Engineer-in-charge. | 31.63 | Cum | 282.89 | ₹8,947.81 |
| 2 | Filling foundation and plinth with filling sand laying in layers including ramming, watering, compacting including cost, conveyance and royalty of sand from approved quarry and other . if any with all leads, lifts, T&P etc complete the items of work in all respect as per specification and direction of Engineer in charge. | 24.83 | Cum | 856.2 | ₹21,259.45 |
| 3 | CC (1:4:8) using 40 mm size and down graded crusher broken HG stone metal free from weathered surface of approved quality from approved quarry in foundation and plinth including laying concrete in layers with due compaction, watering and curing including cost, conveyance, royalty and . of all materials with all lead, lifts and delifts, T&P etc required for completion of the work in all respect as per direction of the Engineer-in-charge. | 8.44 | Cum | 5,656.4 | ₹47,740.02 |
| 4 | Brick work with Fly Ash Brick in cement mortar (1:6) in foundation & plinth including cost, conveyance, royalty, . of all materials, labour, T&P required for the work complete and as per the direction of the Engineer-in-charge. | 7.6 | Cum | 5,569.7 | ₹42,329.72 |
| 5RCC work of M-20 grade with 20 mm and down grade black hard granite chips including cost, conveyance, royalty and all . of all materials with all leads, lifts, T&P etc including rigid and smooth centering, shuttering and dismantling the same after the curing of RCC work for 28 days complete the item of work in all respect as per specification and direction of Engineer-in-charge. | |||||
| 0.9 | Column base & Footing | 4.75 | Cum | 6,176.5 | ₹29,338.38 |
| 0.0 | Plinth Bend | 1.88 | Cum | 7,049.3 | ₹13,252.68 |
| 5.3 | Column & Beam | 4.31 | Cum | 15,548.5 | ₹67,014.03 |
| 5.4 | Lintel Bend | 1.09 | Cum | 13,875 | ₹15,123.75 |
| 5.5 | Chhaja | 12.52 | Sqm | 1,221.4 | ₹15,291.93 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
DTCNofVSSBuildingatGhusragudaofJamankira.pdf
Tender Documents • 4.28 MB
BOQ_607586.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .