| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.2 LAccepted-AOC | L1 | Accepted-AOC AOC is issued |
Tender Value
Refer Docs
EMD Value
₹58,100
Closing Date
19 Aug 2019, 1:30 pmClosed
Chief Engineer/Distibuiton/Chennai North Region
5A, block 144,Annasalai, TANGEDCO Chennai-2
Laying of 33 KV 3x630sq.mm XLPE UG cable from Nandanam 110 KVSS to the proposed Kannamapettai 33/11 KV GIS substation (R.L.1.628Km)
2019_EB_133606_1
CE/D/CNR/C-69/2019-20
Open Tender
Civil Works
Works
30 days
Chennai North Region
As per BQR in specification
2 documents required · 2 mandatory
₹0
₹58,100
Yes
12 Feb 2020
3 Aug 2019
20 Aug 2019
3 Aug 2019
19 Aug 2019
5 Aug 2019
5 Aug 2019 - 17 Aug 2019
Amount
For Concrete/Cement Roads:Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench.
Earth work excavation in all soils including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct at road crossing 60 cm wide and 105 cm deep (clear) including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic.
Using machine for a width of 60cm to a depth of 40cm
Using labour to a breadth of 60cm to a depth of 65cm
Drilling ,reaming and Laying of 33 KVA cable (3 nos).Using trenchless technology method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system(Horizontal Drilling Machine), using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone,internet cables, water pipes etc., installation including cost of pipe, hire charges for all the accessories and equipement etc. Taking the necessary drive pit for drilling & laying the cable,remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar) survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250meters minimum intervals.(Along the road)
Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to the cable laying work including lead, lift, labour, tools & plants etc., complete as per direction of Engineer-in-charge.
Dismantling BW
Dismantling PCC
Dismantling RCC
Providing M.S barricading 1.5m height using M.S sheet 4 mm thick MS angle 50 x 50 x 8 mm base channel 100 x 50 of all materials,leads,lifts,labour,welding and erection ,transporting at site,placing in position, shifting to new location after completing works,tools & plants etc.,complete
Supply and laying of 200mm dia PVC pipes,cutting and jointing the pipe , tying with 7/20 SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour,lead,lift,T&P etc complete
200mm dia PVC pipe supplied by the contractor along with laying
200mm dia PVC pipe supplied by TANGEDCO
Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete.
Transporting of 33 KV cable drums including cost of loading at stores, unloading of 33 KV cable drums each weighing approximately 7T in lorries using truck mounted crane for both loading and unloading including labour required, driver bata etc., (3 drums at a time)
Laying of 3x630 sq.mm 33KV XLPE UG cable by means of winch over rollers provided by Board. The rate includes the cost of pulling the steel wire rope from winch side to drum side providing labour as required at site for tying the cable in trefoil
Refilling with filling sand in layers well consolidated as per std. specification including cost of all materials,lead, lift etc., complete.
Supplying and laying RCC cover slab (60cmx50cmx5cm) including cost of slab, stenciling and laying carefully as directed by the Engineer including cost of all materials, labour,lead,lift etc complete
RCC cover slab supplied by the contractor along with laying
RCC cover slab supplied by TANGEDCO(laying only)
Refilling with excavated earth in layersand well consolidated as per std. specification including cost of all materials,lead, lift etc., complete.
Transporting and clearing the excess excavated earth and debris then and there immediately to avoid any hinderence to normal flow of traffic and public beyond a distance of 5km from the work spot as per the direction of Engineer - in - charge including loading and unloading charges etc., complete.
Transporting of empty drums loading at site and devolution of empty 33KV steel cable drum each weighing 1 to 1.5T from various work site (3drums at a time) and balance cables if any to departmental stores
Providing watch and ward (unskilled) at site as instructed by the Site - in -charge
Bailing out water from cable trench and duct while excavating and also while laying cable using 5HP diesel pump including cost of fuel, operator etc., complete.
Providing 18 gauge alumininum strip with Nylon tie at 10m intervals for engraving voltage level, size of the cable, name of the feeder including cost of all materials, labour charges, transportation charges, etc., complete. (Every 10m intervals)
Casting & placing of RCC offset slab (cable route indication slab)of size 750x750x60 mm casting in RCC 1:2:4 using 12 to 20 mm HBG metal with necessary reinforcement,piling,shuttering,curing, transport from casting yard to various locations & fixing the slab along 33KV cable route as directed by site Engineer at site with PCC 1:3:6 including cost of all materials,labour,lead,lift etc including 2 coats of flourescent painting. (TNATRANSCO Rate)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .