Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAccepted-Finance | ₹14.9 Cr | L1 | Accepted-Finance As per evaluation generated by the eprocurement site Arunachaltenders.co.in |
| 2 | L2₹14.9 CrAccepted-Finance | ₹14.9 Cr | L2 | Accepted-Finance As per evaluation generated by the eprocurement site Arunachaltenders.co.in |
| Sl No | Description | Qty | Unit | Ms Buru Enterprises L1 | M/s B T Enterprises L2 |
|---|---|---|---|---|---|
| 1.00SH:I-S & I | |||||
| 1.01 | Survey and Investigation | 7.5 | Km | 25,000 ₹1.9 L | 25,000 ₹1.9 L |
| 2.00SH:II-Jungle Cutting=13.20 Hecter | |||||
| 2.01 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
By Manual Means:-
In area of Area of Thorney jungle | 13.2 | Hecter | 90,000 ₹11.9 L | 90,000 ₹11.9 L |
| 2.02 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 300 mm to 600 mm | 400 | each | 1,154 ₹4.6 L | 1,154 ₹4.6 L |
| 2.03 | Girth from 600 mm to 900 mm | 250 | each | 1,478 ₹3.7 L | 1,478 ₹3.7 L |
| 2.04 | Girth from 900 mm to 1800 mm | 70 | each | 2,100 ₹1.5 L | 2,100 ₹1.5 L |
| 3.00SH:III-FC | |||||
| 3.01 | Excavation in Soil by Mechanical Means.
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 63,328.26 | cum | 290 ₹1.8 Cr | 290 ₹1.8 Cr |
| 3.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | 31,664.13 | cum | 40 ₹12.7 L | 40 ₹12.7 L |
Tender Value
₹14.9 Cr
EMD Value
₹14.9 L
Closing Date
27 Mar 2026, 12:50 pmClosed
Executive Engineer, Sangram division, PWD, A.P.
O/o Executive Engineer, Sangram division, PWD, Kurung Kumey District, A.P.
C/o Road from Pingtey and Pitak to newly created Panyu Circle Hq in Kurung Kumey (15 Km).
2026_PWDAP_3213_1
SGMD/e-NIT/W-44/2025-26/24
Open Tender
Civil Works – Roads
730 days
Panyu circle, Kurung Kumey District, A.P.
Tender Fee and EMD
10 documents required · 10 mandatory
₹10,000
Executive Engineer, Sangram Division, PWD
₹14.9 L
Yes
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
27 Mar 2026
20 Mar 2026
20 Mar 2026 - 25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1SH:I-S & I | ||||||
| 1.01 | Survey and Investigation | - | Km | - | - | itemH1Code1 |
| 2SH:II-Jungle Cutting=13.20 Hecter | ||||||
| 2.01 | Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
By Manual Means:-
In area of Area of Thorney jungle | 1 | Hecter | - | - | itemH2Code1 |
| 2.02 | Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)
Girth from 300 mm to 600 mm | - | each | - | - | code1.02 |
| 2.03 | Girth from 600 mm to 900 mm | - | each | - | - | itemH2Code2 |
| 2.04 | Girth from 900 mm to 1800 mm | - | each | - | - | itemH2Code3 |
| 3SH:III-FC | ||||||
| 3.01 | Excavation in Soil by Mechanical Means.
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | - | cum | - | - | itemH3Code1 |
| 3.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | - | cum | - | - | itemH3Code2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tendernotice_2.pdf
PDF • 0.34 MB
Tendernotice_3.pdf
PDF • 4.98 MB
BOQ_3410.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid