| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | ₹8.4 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 L+₹17,440 (2.08%)Admitted-Finance GUDLIXA | ₹8.6 L+₹17,440 (2.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hari Narayan Sharma L1 | Pawan Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | Preparation and distribution and updation of monthly waterTheScope of Work includes 1. Taking water meter readingpreparationof water consumption bills through Water BillingModule of RIICOERP software in prescribed format onmonthly basis .2.Distribution of prepared water consumptionbills through waterbilling module of RIICO ERP once in 2months. 3. The work ofupdation of monthly ledger posting ofissued bills, deposited bills(recovery or realization),preparation of monthly outstanding dueslist, preparation ofDefective or Stopped meter list, andpreparation of duplicatewater bills.4. The work of processing andupdation of all typesof permission applications received forworks related toWater Billing Module (WBM) like new waterconnections orDisconnections or ReConnections or Replacementof WaterMeter or Change of Name, Size etc. and other alliedworksrelated to WBM.5. The work of updation of New BindersandLedgers for each financial year. Preparation of Waterduesbalance sheet and reconciliation of water dues recoverywithfinancial ledger. The scope include providing serviceswithrequisite manpower and all leviable Central or Statetaxes,transportation etc. complete as per the direction ofEngineer inCharge.Only New Binders, Ledgers and stationeryfor water billprinting related to water connections for eachfinancial year shallbe provided by the corporation. | 13,200 | Per bill per month | 47.3 ₹6,24,360 Lowest | 48 ₹6,33,600 |
| 2.00 | Labour charges of releasing new water connections from distribution system of different sizes 1/2" & above including digging for pipeline, making hole in pipeline, fixing clamp on pipeline and fixing of ferrule with G.I. Pipe for release of a new water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | 150 | Each | 385 ₹57,750 Lowest | 400 ₹60,000 |
| 3.00 | Labour charges of making water connection D.C. or R.C. from distribution system of different sizes. 1/2" & onwards including digging for pipeline, making hole/ plugging hole in pipeline, removal or fixing of ferrule with G.I. Pipe for R.C or D.C. water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | 180 | Each | 385 ₹69,300 Lowest | 400 ₹72,000 |
| 4.00 | Labour charges for Removing / Refixing / Replacement of water meter for repairing, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | 200 | Each | 195 ₹39,000 Lowest | 200 ₹40,000 |
| 5.00 | Labour charges for crossing the water connection pipe under the road crust by manual / mechanical means, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | 30 | Per Meter | 165 ₹4,950 Lowest | 185 ₹5,550 |
| 6.00 | Labour charges for dismantling of cement concrete/ RCC Platform for making new connection /D.C./ R.C. at site, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | 30 | Each | 385 ₹11,550 Lowest | 400 ₹12,000 |
| 7.00 | Labour charges of checking water connections at connection point from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and aligning of ferrule with G.I. Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | 40 | Each | 385 ₹15,400 Lowest | 400 ₹16,000 |
| 8.00 | Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and alignment of ferrule with G.I. Pipe if any found at site and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | 40 | Each | 385 ₹15,400 Lowest | 400 ₹16,000 |
Tender Value
₹8.0 L
EMD Value
₹15,940
Closing Date
21 Aug 2026, 6:00 pmClosed
Sr. DGM RIICO
RIICO, Jaipur (Rural), Jaipur
As per BOQ
2026_RIICO_588195_1
U12(3)/2026-27/NIT No.39/1539
Open Tender
Civil Works
Item Rate
365 days
Bais Godam
As per Tender Documents
4 documents required · 4 mandatory
₹1,180
RIICO Through SSO Portal
₹15,940
8 Sept 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation and distribution and updation of monthly waterTheScope of Work includes 1. Taking water meter readingpreparationof water consumption bills through Water BillingModule of RIICOERP software in prescribed format onmonthly basis .2.Distribution of prepared water consumptionbills through waterbilling module of RIICO ERP once in 2months. 3. The work ofupdation of monthly ledger posting ofissued bills, deposited bills(recovery or realization),preparation of monthly outstanding dueslist, preparation ofDefective or Stopped meter list, andpreparation of duplicatewater bills.4. The work of processing andupdation of all typesof permission applications received forworks related toWater Billing Module (WBM) like new waterconnections orDisconnections or ReConnections or Replacementof WaterMeter or Change of Name, Size etc. and other alliedworksrelated to WBM.5. The work of updation of New BindersandLedgers for each financial year. Preparation of Waterduesbalance sheet and reconciliation of water dues recoverywithfinancial ledger. The scope include providing serviceswithrequisite manpower and all leviable Central or Statetaxes,transportation etc. complete as per the direction ofEngineer inCharge.Only New Binders, Ledgers and stationeryfor water billprinting related to water connections for eachfinancial year shallbe provided by the corporation. | - | Per bill per month | - | - |
| 2 | Labour charges of releasing new water connections from distribution system of different sizes 1/2" & above including digging for pipeline, making hole in pipeline, fixing clamp on pipeline and fixing of ferrule with G.I. Pipe for release of a new water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | - | Each | - | - |
| 3 | Labour charges of making water connection D.C. or R.C. from distribution system of different sizes. 1/2" & onwards including digging for pipeline, making hole/ plugging hole in pipeline, removal or fixing of ferrule with G.I. Pipe for R.C or D.C. water connection and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | - | Each | - | - |
| 4 | Labour charges for Removing / Refixing / Replacement of water meter for repairing, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | - | Each | - | - |
| 5 | Labour charges for crossing the water connection pipe under the road crust by manual / mechanical means, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge | - | Per Meter | - | - |
| 6 | Labour charges for dismantling of cement concrete/ RCC Platform for making new connection /D.C./ R.C. at site, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | - | Each | - | - |
| 7 | Labour charges of checking water connections at connection point from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and aligning of ferrule with G.I. Pipe for proper flow of water to pipe line and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | - | Each | - | - |
| 8 | Labour charges of checking disconnected water connections at connection point and nearby from distribution system of different sizes 1/2" & above including digging at connection point for pipeline, checking ferrule point, checking clamp on pipeline and alignment of ferrule with G.I. Pipe if any found at site and making good the surface after back filling of earth in trench, including all T&P, transportation, lead & lift etc. complete as per the directions of engineer in charge. | - | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
tdf.pdf
Tender Documents • 0.52 MB
BOQ_1044521.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .