| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | -21.89% | ₹5.5 L | L1 | Admitted-Finance |
| 2 | L2₹5.8 L+₹27,503.38 (4.99%)Admitted-Finance | -17.99% | ₹5.8 L+₹27,503.38 (4.99%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 L+₹34,485.01 (6.26%)Admitted-Finance 38 HATHROL KILE KE NICHE AJMER ROAD WARD 26 JAIPUR PIN 302006 JAIPUR WEST INDIA | JAIPUR | RAJASTHAN | 302006 | -17.00% | ₹5.9 L+₹34,485.01 (6.26%) | L3 | Admitted-Finance |
Tender Value
₹7.1 L
EMD Value
₹14,104
Closing Date
24 Jun 2026, 11:00 amClosed
DC (Works) FTR HQ BSF Jammu
FTR HQ BSF Jammu
as per BOQ
2026_BSF_913210_1
12/NIT/Ftr-Jmu/Engg/2026-27
Open Tender
Civil Works
Works
90 days
as per NIT
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹14,104
STC BSF Udhampur
1 Jul 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
24 Jun 2026
16 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as directed by Engineer-in-Charge. Ordinary rock. | 36.73 | cum | 498.9 | ₹18,324.6 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.97 | cum | 7,878.5 | ₹31,277.65 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 7.35 | cum | 6,812 | ₹50,068.2 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 4.02 | cum | 9,045.75 | ₹36,363.91 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 11.09 | sqm | 392.15 | ₹4,348.94 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts. | 21.12 | sqm | 961.3 | ₹20,302.66 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 482.4 | kg | 107.85 | ₹52,026.84 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 21.37 | cum | 7,132.25 | ₹1,52,416.18 |
| 9 | Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 1,091.24 | kg | 117.35 | ₹1,28,057.01 |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 300 | kg | 172.6 | ₹51,780 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
BOQ_959707.xls
BOQ • 0.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .