| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC BANDARAILAH MALDA | MALDA | MALDA | WEST BENGAL | ₹17.6 L | L1 | Accepted-AOC L1-Accepted |
| 2 | L2₹17.9 LRejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹17.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹18.1 LRejected-Finance BIBIGRAM SOUTH NEAR JALALIA GIRLS HIGH SCHOOL MALDA ENGLISHBAZAR 732101 | ENGLISHBAZAR | MALDA | WEST BENGAL | 732101 | ₹18.1 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | DEY ENTERPRISE L2 | HANNAN BUILDERS PRIVATE LIMITED L3 | NABAUDYAG ELECTRICAL ENGINEERING CO OP. SOC. LTD. L1 |
|---|---|---|---|---|---|---|
| 1.00 | PART-A
Daily operation and upkeepment of 11/0.433KV, 1500 KVA Sub-station having 3 nos Transformer of capacity 750 KVA ( two nos ONAN and one no. RESIN CAST) , 1 no. single panel 11 KV VCB panel , 1 no.4 panel VCB Panel , 1 no 11 KV Isolator for outgoing and bypassing of AVR, C.T.,P.T., 7-12 KV, 11±1% , Reverse Q based 1500 KVA Automatic Voltage Regulator having segregated Buck-Boost Transformer, Feed Back Transformer, 400 A Regulator suited for RQ operation ( function at 800 A secondary current injection) alongwith 800 A Reverse Q panel having 4 nos 800 A contactor logically coupled to Flip-Flop alongwith Online UPS, Battery charger,L.T. Panel having three nos incomer of capacity 1250 A and relevent output feeders etc. complete & all other electrical Accessories and Ancillaries as per instruction and satisfaction of EIC on round the clock basis (three shift of operation) including checking of healthly condition of all draw out feeders daily by Electrician having valid and approprite License (Workmans' Permit), issued by Directorate of Electricity(Licensing Board), Govt. of W.B. or of any other state Govt. of India or by person having ITI(Electrician) Certificate, checking and fault finding of all interconnected power cables laid among different workhouses like sub-station, high lift pumping station, filter house, chemical house, bottling plant, sludge pump house, weigh bridge, internal distribution wiring and illumination of above stated work houses including laboratory and rest houses etc. & findings to be recorded in the log Book and switching ON/OFF of the Indoor and Outdoor Illuminations & other accessories as & when required including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation of the sub-station building complex on daily-basis. | 366 | Days | 3,100 ₹11.3 L | 3,148.58 ₹11.5 L | 3,057.18 ₹11.2 L |
| 1.01 | ESIC Contribution of Empleyers for SL NO 1.0 (@3.25%) | 366 | Days | 79.76 ₹29,192.16 | 79.76 ₹29,192.16 | 79.76 ₹29,192.16 |
| 1.02 | EPF Contribution of Empleyers for SL NO 1.0 (@13%) | 366 | Days | 319.02 ₹1.2 L | 319.02 ₹1.2 L | 319.02 ₹1.2 L |
| 2.00 | PART-B
Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/ Supervisor w.e.f 01.01.2024 to 31.12.2024
Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House & Substation Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. pumps, motors, valves with actuators, flow/level/pressure instruments, gauges, lightings, waisting arrangements, exhaust fans, HT & LT Panel Boards, Cables, capacitors, Transformer , AVR, Battery and Battery charger along with in- house lighting system. | 12 | month | 12,700 ₹1.5 L | 12,699.69 ₹1.5 L | 12,331 ₹1.5 L |
| 3.00 | Cleaning of contacts by CRC 226 spray in the HT & LT Panel Board, cleaning of all Terminal Sockets, Coils one in a month along with minor repairing (if required) of the electrical equipments by supplying necessary sundry materials/electro mechanical accessories as required in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date. | 12 | month | 2,750 ₹33,000 | 2,577.83 ₹30,933.96 | 2,503 ₹30,036 |
| 4.00 | Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT & HT breakers, earthing arrangement system including testing of transformer & AVR oil by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC. | 2 | items | 1,54,000 ₹3.1 L | 1,54,485 ₹3.1 L | 1,50,000 ₹3 L |
| 5.00 | ADD Cess @ 1% | 1 | items | 17,739.54 ₹17,739.54 | 17,906.34 ₹17,906.34 | 17,428.89 ₹17,428.89 |
Tender Value
Refer Docs
EMD Value
₹36,300
Closing Date
19 Dec 2023, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division, PHE Dte. Doulatpur PHE complex, P.O. Maliha, Dist. Malda, PIN 732102
Operation and maintenance of Sub-Station (11KV/0.433KV, 3 x 750KVA transformer), other electrical accessories of Dariapur Treatment Plant of Southern sector under Malda Arsenic Area Water Supply Scheme,(Phase-II) Malda.
2023_PHED_610443_6
WBPHED/EE/MLMD/NIeT_25 of 2023-24
Open Tender
Electrical Work/ Equipment
366 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹36,300
Yes
26 May 2026
4 Dec 2023
21 Dec 2023
4 Dec 2023
19 Dec 2023
4 Dec 2023
Amount
PART-A Daily operation and upkeepment of 11/0.433KV, 1500 KVA Sub-station having 3 nos Transformer of capacity 750 KVA ( two nos ONAN and one no. RESIN CAST) , 1 no. single panel 11 KV VCB panel , 1 no.4 panel VCB Panel , 1 no 11 KV Isolator for outgoing and bypassing of AVR, C.T.,P.T., 7-12 KV, 11±1% , Reverse Q based 1500 KVA Automatic Voltage Regulator having segregated Buck-Boost Transformer, Feed Back Transformer, 400 A Regulator suited for RQ operation ( function at 800 A secondary current injection) alongwith 800 A Reverse Q panel having 4 nos 800 A contactor logically coupled to Flip-Flop alongwith Online UPS, Battery charger,L.T. Panel having three nos incomer of capacity 1250 A and relevent output feeders etc. complete & all other electrical Accessories and Ancillaries as per instruction and satisfaction of EIC on round the clock basis (three shift of operation) including checking of healthly condition of all draw out feeders daily by Electrician having valid and approprite License (Workmans' Permit), issued by Directorate of Electricity(Licensing Board), Govt. of W.B. or of any other state Govt. of India or by person having ITI(Electrician) Certificate, checking and fault finding of all interconnected power cables laid among different workhouses like sub-station, high lift pumping station, filter house, chemical house, bottling plant, sludge pump house, weigh bridge, internal distribution wiring and illumination of above stated work houses including laboratory and rest houses etc. & findings to be recorded in the log Book and switching ON/OFF of the Indoor and Outdoor Illuminations & other accessories as & when required including sweeping & Scavenging of the Pump House complex on daily-basis for maintaining highest level of cleanliness and sanitation of the sub-station building complex on daily-basis.
ESIC Contribution of Empleyers for SL NO 1.0 (@3.25%)
EPF Contribution of Empleyers for SL NO 1.0 (@13%)
PART-B Periodial inspection, thrice in a month, by Electrical supervisor having valid Supervisors' certificate of competency from Directorate of Electricity( Licensing Board), Govt. of West Bengal or under any other State Govt. of India along with Pump Technician/ Supervisor w.e.f 01.01.2024 to 31.12.2024 Each visit should be recorded in the Log Book (with date and time) to be supplied by the Agency and kept in the Pump House & Substation Building. The Supervisor requires to have through/in-depth inspection of all the electrical appliances to ascertain the healthy / fault free operational condition of each equipment i.e. pumps, motors, valves with actuators, flow/level/pressure instruments, gauges, lightings, waisting arrangements, exhaust fans, HT & LT Panel Boards, Cables, capacitors, Transformer , AVR, Battery and Battery charger along with in- house lighting system.
Cleaning of contacts by CRC 226 spray in the HT & LT Panel Board, cleaning of all Terminal Sockets, Coils one in a month along with minor repairing (if required) of the electrical equipments by supplying necessary sundry materials/electro mechanical accessories as required in presence of Electrical Supervisor / Electrician and to be recorded in the log book with date.
Calibration of all meters viz. Ammeter, Voltmeter, Kilowatt meter etc. and testing of all relays, LT & HT breakers, earthing arrangement system including testing of transformer & AVR oil by any agency approved by Directorate of Electricity/WBSEDCL/Any Power Generating unit, twice in a year (preferably in the month of December and June) and submission of the test report in duplicate to Department in each case as required and as per direction of EIC.
ADD Cess @ 1%
DEY ENTERPRISE
HANNAN BUILDERS PRIVATE LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid