| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAdmitted-Finance | ₹13.4 L | L1 | Admitted-Finance |
| 2 | L2₹13.6 LAdmitted-Finance | ₹13.6 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | G POONKODI L1 | S MAHESHWARI L2 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of New PDS @ Kalanjium Nagar Village in Andarkottaram Panchayat at Madurai East Block under 14 th Finance - 2025 - 26 | |||||
| 2.00 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B | 35.82 | cum | 263.78 ₹9,448.60 | 263.78 ₹9,448.60 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 6.54 | cum | 1,941.79 ₹12,699.31 | 1,941.79 ₹12,699.31 |
| 4.00 | Supplying and filling gravel including all charges | 26.23 | cum | 225.45 ₹5,913.55 | 325 ₹8,524.75 |
| 5.00 | Plain Cement Concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., complete. | 9.88 | cum | 5,636.33 ₹55,686.94 | 5,636.33 ₹55,686.94 |
| 6.00 | Supplying, fabricating & placing in position of steel rod for RCC works inculding cost, conveyance of steel rod and binding wire and all labour charges etc., complete. | 1.2 | mt | 91,951 ₹1.1 L | 91,951 ₹1.1 L |
| 7.00 | Reinforced Cement Concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., complete. | 25.59 | cum | 9,382.9 ₹2.4 L | 9,382.9 ₹2.4 L |
| 8.00 | Supplying and erection of Centering using steel sheets inculding necessary supports and structing such as RCC Slab, Lintel, Beam, coloum, sunshade including all charges etc., complete. | 189.12 | sqm | 1,095 ₹2.1 L | 1,200 ₹2.3 L |
| 9.00 | Brick work with CM 1:5 mix using country bricks inculding cost and conveyance of all materiales to site and all labour charges etc., complete. | 25.48 | cum | 6,166.8 ₹1.6 L | 6,166.8 ₹1.6 L |
| 10.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 62.11 | sqm | 308.85 ₹19,182.67 | 308.85 ₹19,182.67 |
Tender Value
₹13.5 L
Closing Date
23 Jan 2026, 3:00 pmClosed
bdo
Madurai East Panchayat Union
Construction of New PDS at Kalanjium Nagar Village in Andarkottaram Panchayat Madurai East Block in Madurai District for the Year 2025 26 Package No 1
2026_RDTN_645192_1
14 th Finance -2025-2026 Madurai East Pkg No 1
Open Tender
Civil Works
180 days
madurai
EMD Prequalification
2 documents required · 2 mandatory
₹0
Exempted
29 Jan 2026
21 Jan 2026
23 Jan 2026
21 Jan 2026
23 Jan 2026
21 Jan 2026
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and filling gravel including all charges
Plain Cement Concrete 1:4:8 mix using 40 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., complete.
Supplying, fabricating & placing in position of steel rod for RCC works inculding cost, conveyance of steel rod and binding wire and all labour charges etc., complete.
Reinforced Cement Concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site and all labour charges etc., complete.
Supplying and erection of Centering using steel sheets inculding necessary supports and structing such as RCC Slab, Lintel, Beam, coloum, sunshade including all charges etc., complete.
Brick work with CM 1:5 mix using country bricks inculding cost and conveyance of all materiales to site and all labour charges etc., complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing Doors and window
Door (1.00 x2.10m)
window (1.00 x1.30m)
rolling shutter (1.50 x2.40m)
rolling shutter (1.65 x2.40m)
jolly (0.90x 0.60m)
500LIT HDPE Tank
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters including cost and conveyance of all materials to site and labour charges etc., complet
Terrace flooring with one cource of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound and the joints pointed with same morter, including cost, conveyance of all materials to site and all labour charges etc., complete.
Granaolithic floor finish of 25 mm thick in PCC 1:2:4 using 10-12 mmHBGS Jelly including cost and conveyance of all materials to site and all labour charges etc., complete.
Paving the floor with pre-polished concrete anti-skid step tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at th
Painting two coats with oil bound Distember over one coat of Primier (using White Cement as primer ) in all floors including brushes etc ., complete etc
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a one coat of priming coat including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc., (WITHOUT PRIMER)
Supplying and fixing Electrical items
Light point SD 20
Fan point SD 20
Light SD 83
Ceiling Fan SD 110
Plug point SD 36
Provision for Name Board charges
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_773207.xls
BOQ • 0.33 MB
document.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid