26 Feb 2024, 4:00 pmClosed
Executive Engineer, ED Budgam, KPDCL
Executive Engineer, ED Budgam, KPDCL
LT improvement at village Hushroo Kongaipora, Village Frestwar and Sitharan
2024_PDD_245336_1
EDB/145 of 2023-24
Open Tender
Electrical and Maintenance Works
Turn-key
15 days
ED Budgam
as per sbd
7 documents required · 7 mandatory
₹1,000
Executive Engineer, ED Budgam, KPDCL
₹20,520
27 Feb 2024
19 Feb 2024
27 Feb 2024
19 Feb 2024
26 Feb 2024
21 Feb 2024
20 Feb 2024 - 21 Feb 2024
Amount
Work items identified;
Supply,Installation ,testing and commisioning of 9mtr (410 SP-33) long Steel Tubular Poles complete with base plate(350x350x5mm) with 50 mm dia hole, top cap, Earthing Channel(75x40x6 mm) including digging of pit positioning etc, complete in all respect as per Standards.
Supply,Installation ,testing and commisioning of 8 mtr (410 SP-15) long Steel Tubular Poles complete with base plate (350x350x5mm)with 50 mm dia hol, top cap, Earthing Channel(75x40x6) positioning etc, complete in all respect as pe Standards.
Supply,laying, stringing, tensioning, binding of 50 Sqmm ACSR Conductor complete in all respects as per standards.
Supply,laying, stringing, tensioning, binding of 30 Sqmm ACSR Conductor complete in all respects as per standards.
Supply Carraige upto site, fixing of GI V cross-arm with top Bracket including clamp duly fabricated as per site requirement including clamps(50x8 mm), GI Nuts & Bolts,washers etc complete in all respects as per standards.
Supply,Carraige upto site,Installation,testing and Commissioning of 11 KV porecelain composite Pin Insulators 12 kv, 5KN, Lighting impulse 75 Kv positive and 80 Kv negative, Creepage distance 320mm complete in all respects as per standards.
Supply,Carraige upto site and installation of GI Mukhi Clamp for Shackle insulators.
Supply,Carraige upto site and installation of 16KN Shackle insulators.
Cement bottoming 1:2:4 mix as per Standards 0.45cum /0.5 cum pole as per drawings
Earthing of steel tubular poles complete by GI pipe 40mm or GI rod 20mm 3.0 mtr long through GI strip 25*3 mm.
Painting of Poles with one coat of Red Oxide and two or more coats of alimunium paint to obtain proper finish/uniformity as per standards.
Supply and fixing of (GI Barbed wire) anti-Climbing Device with Clamps as per standards.
Supply and fixing of danger plates as per standards
NOTE: 1.The rates quoted by the bidder for all the items shall be inclusive of GST/freight/insurance/storage/installation/testing and any other charges FOR Supply, installation, testing and commissioning of various line materials for improvement cum stabilization of Electrical Network under the jurisdiction of ED Budgam, KPDCL.
M/S DAR ELECTRICAL & SUPPLIERS
MUSHAFA ELCETRIC
WANI ELECTRICAL CONTRACTOR
M/S HAYAT ELECTRICALS
Heaven Electricals
M/S PARVAIZ ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .