| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance | ₹4.4 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | A.H.CONSTRUCTIONS L1 |
|---|---|---|---|---|
| 1.00 | Clearing of juliflora jungle including cost of all labour, lead, lift etc. complete. | 9,300 | m2 | 6 ₹55,800 Lowest |
| 2.00 | Earth work excavation for levelling the yard in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete. | 9,390 | m3 | 125 ₹11,73,750 Lowest |
| 3.00 | Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete. | 1,355.5 | m3 | 250 ₹3,38,875 Lowest |
| 4.00 | Supplying and filling with M sand in foundation, including cost of sand, filling charges, watering and consolidation etc complete. | 70 | m3 | 2,600 ₹1,82,000 Lowest |
| 5.00 | Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete. | 295.5 | m3 | 7,500 ₹22,16,250 Lowest |
| 6.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials, curing, labour, lead,lift etc.complete. | 124.1 | m3 | 8,000 ₹9,92,800 Lowest |
| 7.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials, curing, labour, lead, lift etc. complete. (Below.GL) | 88 | m3 | 14,500 ₹12,76,000 Lowest |
| 8.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials, curing, labour, lead, lift etc. complete. (Above.GL) | 15 | m3 | 18,000 ₹2,70,000 Lowest |
| 9.00 | RCC 1:1.5:3 using 12 to 20 mm HBG metal for wall concrete with form work including cost of all materials, curing, labour, lead, lift etc. complete. | 78 | m3 | 26,000 ₹20,28,000 Lowest |
| 10.00 | RCC 1:1.5:3 for RCC Cover slabs using 12 to 20 mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. | 252.5 | m3 | 21,000 ₹53,02,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
17 Apr 2023, 2:30 pmClosed
CE/TP -I/CHN
Guindy 230kV GIS SS campus
Enhancement of ICT at Alamathi 400kV Bus bay
2023_EB_296046_1
TP1-131/2022-23
Open Tender
Civil Works - Others
Works
120 days
CHENNAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.6 L
Yes
11 May 2023
18 Mar 2023
18 Apr 2023
18 Mar 2023
17 Apr 2023
18 Mar 2023
Amount
Clearing of juliflora jungle including cost of all labour, lead, lift etc. complete.
Earth work excavation for levelling the yard in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete.
Earth work excavation in hard stiff clay,block cotton hard red earth shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete.
Supplying and filling with M sand in foundation, including cost of sand, filling charges, watering and consolidation etc complete.
Providing foundation concrete in PCC 1:3:6, using 40 mm HBG stone including cost of cement, and all materials labour, lead, lift etc complete.
RCC 1:1.5:3 using 12 to 20 mm HBG metal for raft concrete including cost of all materials, curing, labour, lead,lift etc.complete.
RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials, curing, labour, lead, lift etc. complete. (Below.GL)
RCC 1:1.5:3 using 12 to 20 mm HBG metal for Footing with form work including cost of all materials, curing, labour, lead, lift etc. complete. (Above.GL)
RCC 1:1.5:3 using 12 to 20 mm HBG metal for wall concrete with form work including cost of all materials, curing, labour, lead, lift etc. complete.
RCC 1:1.5:3 for RCC Cover slabs using 12 to 20 mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete.
Supplying fabricating and placing in position of steel reinforcements including cost of steel binding wire labour for cutting bending tying placing in correct position transport lead lift etc complete as per standard specification.
Supply and assembling template for switch WC columns and CT support structure including cost of all labour lead and lift etc complete . as directed by the dept. Engineer at site.
Supplying fabrication in 50 x 50 x 6, GI angle as per drawing and standard specification for cable duct including cost of all materials, labour, lead, lift, etc. Complete as per standard specification.
Supplying and fixing 24mm dia GI foundation bolt of 0.75 length, with 10cm thread at top and 15cm ‘L’at bottom cost of materials, fabrication, with ho dip galvanising etc. Complete as per standard specification.
Supply and fixing of 40mm dia bolt to a length of 1.1m including washer and two nuts and hot dip galvanising threading etc complete. as per standard specification.
Labour charges for transport and Erection of tower VC Column, WC Column and boom including cost of all labour, lead, lift, T & P etc. Complete as per standard specification.
Supplying and laying PVC pipe 10 Kg/Cm2 of approved quality and best make (Finolex or Equivalent) including fixing PVC pipe specials,elbow,tee and nipples with hole etc., including the cost of excavation,sand filling arround pipe,refilling and all materials, labour, lead, lift, T&P, etc, complete. PVC Pipe 20mm dia
Supplying and laying PVC pipe 10 Kg/Cm2 of approved quality and best make (Finolex or Equivalent) including fixing PVC pipe specials,elbow,tee and nipples with hole etc., including the cost of excavation,sand filling arround pipe,refilling and all materials, labour, lead, lift, T&P, etc, complete. PVC Pipe 25mm dia
Supplying and fixing in possition of 20 mm dia PVC dummy of approved make and quality conforming to is specification including the cost of all materials,lobour,lead,lift,etc., complete. 20 mm Dia (400KV Side)
Supplying and filling with quarry dust inside the Yard area including cost of all materials, labour,lead, lift,etc., complete as directed by engingeer incharge at site.
Supplying and spreading with 20mm HBG matal inside the Yard area including cost of all materials, labour,lead, lift,etc., complete as directed by engingeer incharge at site.
Plastering in c.m. 1:5, 12 mm thick for all exposed faces of concrete and brick works including cost of cement, all materials, lead, lift etc. complete.
Colour washing with two coats over a priming coat including cost of all materials with colour pegments, labour, lead, lift, etc complete
Dismantling of existing RR Masonry structures, with all labour, lead, lift and as directed by the engineer at site, etc complete.
Dismantling of existing PCC with all labour, lead, lift and as directed by the engineer at site, etc complete.
Dismantling of existing RCC with all labour, lead, lift and as directed by the engineer at site, etc complete.
Supply for tower parts VC Column WC Column and boom including cost of all materials, galvanising, fabrication and, with hot dip galvanising etc. Complete. as per standard specification.
Supply of Bolt & Nuts VC Column WC Column and boom including cost of all materials, galvanising, fabrication and, with hot dip galvanising etc. Complete. as per standard specification.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .