| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-Finance | L1 | Accepted-Finance BOQ Rate accepted | |
| 2 | L2₹7.6 L+₹1.4 L (22.1%)Accepted-Finance NO 25 MASILAMANIPURAM 3RD STREET TUTICORIN 628 008 | TUTICORIN | THOOTHUKUDI | TAMIL NADU | 628008 | L2 | Accepted-Finance BOQ Rate accepted |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
13 Jul 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE C TTPS TTN
O/o SE Civil TTPS TTN 4
Rectification Works in air blower column and motor bed in Unit 4 Air washer room at 10.50 m level at Stage 3 during the forthcoming overhaul period
2022_EB_240134_1
SE/Civil/TTPS/103/2022-2023
Open Tender
Civil Works - Others
Works
30 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
Yes
15 Jul 2022
7 Jul 2022
14 Jul 2022
7 Jul 2022
13 Jul 2022
7 Jul 2022
Amount
Providing two legged scaffolding for works upto 3m heights, using 10 to 13 cm. dia. casuarinas props, the distance between the two rows being 1.25m and the spacing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side or braces at 2m c/c including longitudinal & transverse middle braces to step up and providing a platform with country wood planks of 40 mm. thick & 1m width, etc. including cost of all materials, labours, lead, lift, safety measures, etc. complete.
Removing the spalled / distressed RCC from the existing concrete for an average thickness of 75mm, disposal of debris with a lead of 1 km and roughening the surface thoroughly with reebaklens fosroc acid /equivalent with all lead, lift, labour, etc complete.
Providing and fixing 75mm x 50mm (3mm thick) weld mesh in the damaged portions of the ceiling portion.
Providing RCC 1:1½: 3 using 6 to 10mm chips for 50mm thickness in layers in the ceiling including cost of all materials, labour, lead, lift, safety measures etc., complete
providing epoxy screeding work in the surface of ceiling and side walls of sump room and Eliminator box of air washer Unit - V wherever necessary cleaning including the surface providing primer coat of epoxy compound and applying 10mm thick epoxite epoxy screeding using quartz sand and epoxy compound of Hindustan ciba geing including labour, lead, lift, etc,. but excluding providing scaffolding charges etc., complete.
Providing two coats of epoxite epoxy Over the ceiling and wall of sump room and eliminator box of Air washer Unit - V including cost of all materials labour lead lift etc., but excluding scaffolding charges etc., complete.
Providing Micro Concrete for pedestals with shuttering Applying One coat of Nito Zinc/equivalent primer after thorough cleaning of rust in the reinforcement rate including cost of all materials, labour, lead, lift etc., complete as directed by the engineer at site. Providing fabricating and erecting slurry tight from work with plywood shutters with suitable supports, which do not deform (or) micro concrete for pedestals including cost of all materials, labour ,lead, lift, head load etc., complete as directed by the engineer at site. Providing micro concrete using Rendroc RG (or) equivalent as per manufactures specifications. This mixed micro concrete should be placed continuously for an average thickness of 75mm including cost of all materials, labour, lead, lift, etc., complete as directed by the engineer at site. Applying One coat of Polymer modified Acrylic Emulsion (Nito bond AR or equivalent) in the etc., including cost of all materials, labour, lead, lift pedestals etc., complete as directed by the Engineer at site.
Chipping the existing floor concrete and roughening the surface for future bonding and thorough cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete
Providing PCC 1:1.5:3 screed concrete for floor using OP/PP cement with 6 to 10mm chips machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Painting two coats with ready mixed enamel paint for the steel surface with primer including cost of all materials, scaffolding charges, labours, lead, lift, curing, etc. complete.
Providing two coats of Acrylic distemper of approved quality, brand & colour for old ceiling & inner wall surfaces including cost of all materials, scaffolding charges, thorough cleaning of surface, labours lead lift curing etc., complete.
TEAM ENGINEERING AND CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .