Tender Value
₹41.2 Cr
EMD Value
₹82.3 L
Closing Date
21 Aug 2026, 2:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
CHOS/C/JP
15 conditions · 3 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V'whichever is less; where V= Advertised value of the tender in crores of Rupees =Number of years prescribed for completion of work for which bids have been invited. Theaverage annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIII, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Bid Capacity: The tender/technical bid will be evaluated based on bid capacity formulated as Annexure-D. Tenderer shall furnish Annexure-V and annexure-XIX both duly certified by Chartered Accountant.
(a)The tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works costing not less than the amount equal to 30% of advertised value of the tender, or Two similar works costing not less than the amount equal to 40% of advertised value of the tender, or One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (i) In case of composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed any of the following during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: Three similar works costing not less than the amount equal to 30% of advertised value of each component of tender, or Two similar works costing not less than the amount equal to 40% of advertised value of each component of tender, ora One similar work costing not less than the amount equal to 60% of advertised value of each component of tender. Note: Separate completed works of minimum required values for each component can also be considered for fulfillment of technical eligibility criteria. (b) (ii) In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. Any work or set of works shall be considered to be a separate component, only when cost of the component is more than Rs. 2 crore each. The tenderer shall submit the completion certificate as per proforma given in annexure-IV-A or IV-B or IV-C as applicable or in the format containing all information as required as per the Annex. IV-A or IV-B or IV-C. Note :- Criteria for the completed work has been given in the General instructions in the tender document.
Definition of similar nature of work -Any Civil Engineering work/P-Way work OR supply of Ballast/Boulders/Coarse Aggregates
64 conditions · 10 needing a document upload
Mandatory in case Bid security amount is prescribed in SPECIAL CONDITIONS OF CONTRACT (Version-11.4) Para 5.1.2 - The Bid Security shall be deposited in cash through e-payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per annexure-XXXII and shall be valid for a period of 90 days beyond the bid validity period.
In case the tenderer is any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' - shall be exempted from payment of Bid security deposit and shall submit certified copy of the registration/ Valid document issued by DIPP (mandatory if applicable)
In case the tenderer is Labour Cooperative Societies - shall deposit only 50% of the Earnest Money Deposit and shall submit certified copy of the registration/ Valid document issued by the relevant Ministry/ Labour commission (mandatory if applicable).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/We have read the various conditions to tender attached here to and agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for a period as mentioned in NIT header from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our "Bid security". I/We offer to do the work for North Western Railway, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within time period as mentioned in the NIT Header from the date of issue of letter of acceptance of the tender.
I/We also hereby agree to abide by the General Conditions of Contract-2022 corrected up- to- date and to carry out the work according to the Special Conditions of Contract and Indian Railways Unified Standard Specifications (Materials and Works) 2021 as corrected up-to-date, Unified Standard Schedule of Rates of North-Western Railway - 2021 as corrected up-to-date & C P W D DSR-2023 and Specification 2019 (for the present contract)
I/We have read in detail the various conditions as detailed in clause 5 "Completion Period" of "Additional Special Conditions" of tender and confirm here to and agree to and abide by the said conditions. The proposed work as detailed in scope of work, mentioned in milestones & specified in the contract documents should be completed within 14 months from the date of issue of the acceptance letter including monsoon as per Milestone. Resource mobilization by the agency will be arranged in a manner that the works can be commenced in parallel in all block section from Jaipur to Isarda section. If the contractor fails to complete the work as per given milestone in para 5 of "Additional Special Conditions" of tender, Railway will be entitled without prejudice to any other right and remedy available on that behalf, to recover damages as per clause 17B of SGCC.
Balance leftover wrok of Supplying & stacking of 65mm machine crushed stone ballast along the railway track between Jaipur - Isarda stations from Km 131.27 to Km 40.70 in connection with Jaipur -Sawai Madhopur Doubling project.
NWRSCJPSWMCIVIL514110110R
NWRSCJPSWMCIVIL514110110R
Open
Works - General
14 Months
Jaipur, Rajasthan
₹0
₹82.3 L
29 Jul 2026
29 Jul 2026
7 Aug 2026
5 items across 1 schedule · ₹35,32,29,800 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| supply and stacking of Track Ballast conforming to (IRS-GE-1) with latest at Railway depot or nominated Distance of nearest quarry each sub-item is only for the selecting the items for preparation schedule, based on the distance between nearest quarry supply points and will not affect quarry during physical supply prescribed specification is met | — | — | — | — | |
| 1 | of nearest quarry is more than 40 km | cum | 5000.00 | 1,108.85 | 55,44,250 |
| 2 | of nearest quarry is more than 50 km | cum | 155000.00 | 1,155.66 | 17,91,27,300 |
| 3 | of nearest quarry is more than 100 km | cum | 93000.00 | 1,287.73 | 11,97,58,890 |
| 4 | of nearest quarry is more than to 150 km | cum | 32000.00 | 1,524.98 | 4,87,99,360 |
| Schedule total | ₹35,32,29,800 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC2022correctionslip10and11.pdf
ATTACHMENT
SafetycircularNWR.pdf
ATTACHMENT
GCCApril-2022RailwayBoard.pdf
ATTACHMENT
GCCCorrectionSlip1to9.pdf
ATTACHMENT
STD-11-4.pdf
ATTACHMENT
Additionalspecialconditionballast_1.pdf Additional special conditions
ATTACHMENT
Additionalspecialconditionballast_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].