| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.2 LAccepted-AOC | ₹22.2 L | L1 | Accepted-AOC Lowest Rate |
| 2 | L2₹22.9 LRejected-AOC 81 1 1 MUTHUKRISHNAPURAM 6TH STREET THOOTHUKUDI 628 002 | THOOTHUKUDI | THOOTHUKUDI | TAMIL NADU | 628002 | ₹22.9 L | L2 | Rejected-AOC Highest Rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected Due to Administrative Reason |
| Sl No | Description | Qty | Unit | ANWAR BASHA L1 | JBR BUILDERS L2 | SELVAN AND CO L3 |
|---|---|---|---|---|---|---|
| 1.00Construction of 5.00 mt Span Culvert at infront of T.D.T.A School in Melathattaparai Village and Panchayat | ||||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 171.14 | cu.m | 157 ₹26,868.98 | 253 ₹43,298.42 | 259.82 ₹44,465.59 |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more then 15cm thick compacting etc.,complete complying with standard specification as directed. | 25.68 | Cum | 5,000 ₹1,28,400 | 5,132 ₹1,31,789.76 | 5,295.03 ₹1,35,976.37 |
| 4.00 | Supply and erection of centering and shuttering for sides and soffits including necessary support , labour charges etc complete as per standard specification.(Below sill without strutting) | 303.17 | Sqm | 420 ₹1,27,331.4 | 526 ₹1,59,467.42 | 539.29 ₹1,63,496.55 |
| 5.00 | above GL | 54.94 | Sqm | 450 ₹24,723 | 1,051 ₹57,741.94 | 1,078.58 ₹59,257.19 |
| 6.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 104.62 | cu.m | 5,500 ₹5,75,410 | 5,395 ₹5,64,424.9 | 5,565.22 ₹5,82,233.32 |
| 7.00 | CC 1:3:6 mix using 20mm metal including cost and conveyance of all materials and all labour charges etc | 77.12 | Cum | 5,750 ₹4,43,440 | 5,857 ₹4,51,691.84 | 6,039.05 ₹4,65,731.54 |
| 8.00 | CC 1:2:4 mix using 20mm metal including cost and conveyance of all materials and all labour charges etc | 4.98 | Cum | 6,100 ₹30,378 | 6,384 ₹31,792.32 | 6,579.45 ₹32,765.66 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 20.16 | Cum | 6,400 ₹1,29,024 | 8,720 ₹1,75,795.2 | 8,982.06 ₹1,81,078.33 |
| 10.00 | Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification | 3 | MT | 91,000 ₹2,73,000 | 88,267 ₹2,64,801 | 90,559.32 ₹2,71,677.96 |
Tender Value
₹23.6 L
EMD Value
₹23,600
Closing Date
27 Feb 2026, 3:00 pmClosed
Special Officer, Melathattaparai Panchayat
Panchayat Union Office Thoothukudi
Construction of 5.00 mt Span Culvert at infront of T.D.T.A School in Melathattaparai Village and Panchayat
2026_RDTN_663804_1
Melathattaparai 01/2025-26 Dated 20.02.2026
Open Tender
Civil Works
120 days
Panchayat Union Office Thoothukudi
Technical Qualification
3 documents required · 3 mandatory
₹0
₹23,600
Yes
Panchayat Union Office Thoothukudi
18 Jun 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
24 Feb 2026
Construction of 5.00 mt Span Culvert at infront of T.D.T.A School in Melathattaparai Village and Panchayat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more then 15cm thick compacting etc.,complete complying with standard specification as directed.
Supply and erection of centering and shuttering for sides and soffits including necessary support , labour charges etc complete as per standard specification.(Below sill without strutting)
above GL
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
CC 1:3:6 mix using 20mm metal including cost and conveyance of all materials and all labour charges etc
CC 1:2:4 mix using 20mm metal including cost and conveyance of all materials and all labour charges etc
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supply and fabrication of Steel Grade S-415/Steel Grade S-240 required for all RCC items of works involved in the schedule including cost of steel which will be procured by the contractor by his own arrangement, cost of fabrication, labour charges for cleaning the bars straightening, cutting, bending, tying grills, hoisting and placing the reinforcement in position as specified in the drawings including cost of binding wire, provision of space bars, cover blocks and all other incidental charges etc., complete as per standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_796978.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Techbits.pdf
Tender Documents • 0.95 MB
BOQ_796978.xls
BOQ • 0.28 MB
Culvert.pdf
Additional Documents • 0.32 MB
Download all tender documents and submit your bid