Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.3 CrAccepted-AOC | ₹47.3 Cr | L1 | Accepted-AOC L1 Bidder |
Tender Value
₹43.1 Cr
EMD Value
₹86 L
Closing Date
15 Jun 2023, 2:00 pmClosed
Chief Engineer, PWD(Roads), Assam
Chandmari Guwahati 781003
Const. of Ropeway System over the river Brahmaputra connecting Biswanath Ghat and Umatumoni Island at Biswanath Ghat of Biswanath District, Assam on EPC mode, including Defect Liability cum Comprehensive Operation and Maintenance period for three
2023_PWD_30537_1
CEM/02/2022/127 dated 17/04/2023
Open Tender
Civil Works
540 days
Biswanath Ghat
Please refer tender document
8 documents required · 8 mandatory
₹20,000
₹86 L
Yes
Office of the Chief Engineer PWD Roads
4 Jan 2024
19 Apr 2023
17 Jun 2023
19 Apr 2023
15 Jun 2023
19 Apr 2023
27 Apr 2023
Amount
DESIGN AND CONSTRUCTION WORK: Complete Engineering ,Design ,manufacturing, fabrication, transportation including loading, unloading and handling at site, erection/installation, testing and commissioning of a Double reversible twin track Bi-cable Jig- Back Ropeway System of length approx. 446m for carrying 300 PPH on EPC mode with allied infrastructure necessary (based on the EPC design) for its smooth operations and maintenance as per the best industry practice and various governing laws of states. All the design, execution, testing and commissioning at all levels including but not limited to following: (a) Civil and Structural work as per the latest Bureau of Indian Standards (BIS) (b) Ropeway System and towers as per the latest CEN/BIS Standard as detailed in Tender Documents. (c) Other infrastructure like Generator set, LT Pannel and all others associated E &I works as per the latest Bureau of Indian Standards (BIS). Also Adhering to the General Conditions of Contract, Special condition of Contract and Scope of Work as given in Technical specifications/ tender drawings, employers requirements mentioned in Tender document. Scope includes collection of all the site specific data required for design, erection, commissioning and operations of the system and getting all the design approved from IIT Guwahati.
Defect Liability cum Comprehensive Operation & Maintenance for a period of three (3) years with overall Equipment Efficiency (OEE) of more than 90%
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid