Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance | ₹2.1 L | L1 | Accepted-Finance L1 bidder |
| 2 | L2₹2.1 L+₹4,077.68 (1.94%)Rejected-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | ₹2.1 L+₹4,077.68 (1.94%) | L2 | Rejected-Finance L2 bidder |
Tender Value
₹5.7 L
EMD Value
₹56,693
Closing Date
5 Jun 2026, 3:00 pmClosed
Chief Engineer
Motijheel Nagar Nigam Kanpur.
Consturction of shauchalay work from hata no.123/484 munni maharaj hata Under Ward-20 Zone-5
2026_NNKAN_1130451_3
433/A.A.5/25-26
Open Tender
Civil Works
Fixed-rate
45 days
Ward-20
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹56,693
28 Jul 2026
26 May 2026
5 Jun 2026
26 May 2026
5 Jun 2026
26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling brick work or stone work in lime or cement mortar and including stacking of materials as directed by Engineer-in chage with in a distance of 60mt.(200feet) | 0.4 | Cum. | 580 | ₹232 |
| 2 | Dismantling rainforcement cement concrete or rainforcement brick work, including stacking of materils as directed by Engineer-in-charge with in a distance of 60 mt.(200 feel). (Chapter-17,Si.-4) | 0.4 | Cum. | 1,200 | ₹479.88 |
| 3 | Earth work in excavation in trenches for foundations pipes cable etc. in ordinary soil (loan clay or sand ) including lift up to 1.5 m lead up to 50 m and dressing of sides and ramming og bottom and disposal | 1 | Cum. | 215 | ₹214.98 |
| 4 | Providing and laying in cement concrete 1:6:12 ( 1cement :6 fine sand :12 graded brick aggregate 40 mm nominal size ) and curing complete including cost of form work in foundation and floors. | 0.6 | Cum. | 4,380 | ₹2,628 |
| 5 | providing and laying in position specified grade of reinforced cement ,concrete, excluding the cost of centering, shuttering, finishing and reinforcement all plinth level 1:1.5:3 (1cement :2 coarse sand :4 graded stone 20mm aggregate) work. REF NO 5.1.2 | 0.2 | Cum. | 7,590 | ₹1,518 |
| 6 | Class-150 brick work in 1:4 cement and coares sand of 1.25 fineness modulous mortar in fo superstructure including supply of all materials labour and tools and plants ete required for proper completion of the work | 0.4 | Cum. | 7,500 | ₹3,000 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work ( when not included in over all rates ) wrought to required shape as necessary including bending for proper completion of the work including supply of steel. ( c 12 mm to 32 mm tor ) | 0.8 | Qtl. | 7,200 | ₹5,759.28 |
| 8 | Supply and fixing 5 mm thick China white glazed tiles in flooring or in skirting of dado laid with 1:3 cement and approved coares sand mortar finishing with white cement slurry jointing an polishing ( size of tiles upto 200 x 300 mm ) | - | sqm | 1,024 | - |
| 9 | 12 mm cement plaster in single coat on fair side of single or half brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles (ll) 1 Cement :4 fine sand. (Chap.-13, Si. No.-1) | - | sqm | 200 | - |
| 10 | Providing and applying white cement based putty of average thickness of 1 mm of approved brand and manufacturer over the plasterd wall surface | - | sqm | 135 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.60 MB
BOQ_2161287.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .