| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC QR NO NII 17 MPEB COLONY BIRSINGHPUR DISTT UMARIA MP 484552 | BIRSINGHPUR | UMARIA | MP | 484552 | ₹8.1 L | L1 | Accepted-AOC L1 Lowest offer basis |
| 2 | L2₹52.2 L+₹44.0 L (540.6%)Rejected-AOC | ₹52.2 L+₹44.0 L (540.6%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical BIRSINGHPUR | - | - | Rejected-Technical Previous order copies uploaded by firm did not fulfil the PQR criteria as per Clause 6(b) |
| 4 | Rejected-Technical BEHIND BANK OF BARODA WARD NO 19 DHANPURI SHAHDOL 484114 | SHAHDOL | SHAHDOL | MADHYA PRADESH | 484114 | - | - | Rejected-Technical Previous order copies uploaded by firm did not fulfil the PQR criteria as per Clause 6(b) and also firm has not submitted affidavit for Insolvency and Bankrupty |
| 5 | Rejected-Technical | - | - | Rejected-Technical Previous order copies uploaded by firm did not fulfil the PQR criteria as per Clause 6(b) and also firm has not submitted affidavit for Insolvency and Bankrupty |
| Sl No | Description | Qty | Unit | DASS ENGINEERING WORKS L1 | Siddhesh Electricals L2 |
|---|---|---|---|---|---|
| 1.00Work contract for painting of HT < transformers and all BUS Duct of Generator, Generator Transformers, Unit auxiliary transformer, Station transformers etc. of Unit#1,Ph-1, SSTPP, MPPGCL, Dongalia | |||||
| 1.01Particular | |||||
| 1.10 | Painting & nomenclature of Generator transformers including radiator GT 1R,1Y & 1B and spare GT
Area Calculated
Area of transformer = 98sqmeter
Area of Cooler = 104sqmeter
Area of conservator = 48sqmeter
Area of MB ,connecting pipe etc = 140 Sqmeter
Total area of transformer = 390 sqmeter
No. of Generator transformer = 4 no.
Total area to be painted = 390 x 4 =1560 sqmeter | 1,560 | Sq.meter | 116.82 ₹1,82,239.2 Lowest | 531 ₹8,28,360 |
| 1.20 | Painting & nomenclature of Station transformer #1 including radiator
Area Calculated
Area of transformer = 103 sqmeter
Area of Cooler with fins = 675 sqmeter
(no. of fin =28 & no of set 16, area of 1 fin 1.5 sqm, total = 28x16x1.508 =675)
Area of conservator = 30 sq meter
Total area of transformer = 808 sqmeter | 808 | Sq.meter | 69.62 ₹56,252.96 Lowest | 531 ₹4,29,048 |
| 1.30 | Painting & nomenclature of Unit transformer including radiator UAT 1A& 1B
Area Calculated
Area of transformer = 90sqmeter
Area of Cooler with fins = 332 sqmeter
(no. of fin =22 & no of set 10, area of 1 fin 1.508 sqm, total = 22x10x1.508 =332)
Area of conservator = 24sqmeter
Total area of transformer = 446 sqmeter
No. of Unit transformer = 2 no.
Total area to be painted = 446x2 =892 sqmeter | 892 | Sq.meter | 69.62 ₹62,101.04 Lowest | 531 ₹4,73,652 |
| 1.40 | Painting & nomenclature of VFD oil type transformer ESP area
Area Calculated
Area of transformer = 52.52sqmeter
Area of radiator with fin = 114 Sq mtr
(no. of fin =22 & no of set 8, area of 1 fin 0.656 sqm, total = 22x8x0.65 =114)
No. of oil type transformer = 4 no.
Total area to be painted = 166.52x4 = 666 sq meter | 666 | Sq.meter | 57.82 ₹38,508.12 Lowest | 531 ₹3,53,646 |
| 1.50 | Painting of Bus ducts of GT, Generator , UAT & Station of unit 1
• UAT 1A to 1CA Bus duct :- 4340 sqfeet
• UAT 1B to 1CB Bus duct :- 4940 sqfeet
• Station 1 to OBA Bus duct :- 4280 sqfeet
• Station 1 to OCA & OCB Bus duct :- 5500 sqfeet
• GT 1 to Generator #1(R,Y,B) Bus Duct :- 15725 sq feet
• UT 1A to 1B bus duct :- 2400 sq feet
Total Area Calculated to be painted= 37185 sq feet (approx) or 3455 sq mtr | 3,455 | Sq.meter | 105.02 ₹3,62,844.1 Lowest | 531 ₹18,34,605 |
| 1.60 | Painting & nomenclature of ICT 1&2 including radiator
Area Calculated
Area of transformer = 187 sqmeter
Area of Cooler with fins = 1013 sqmeter
(no. of fin =24 & no of set 28, area of 1 fin 1.5 sqm, total = 24x28x1.508 =1013)
Area of conservator = 22 sqmeter
Total area of transformer = 1222 sqmeter
No. of Unit transformer = 2 no.
Total area to be painted = 1222x2 =2444 sqmeter | 2,444 | Sq.meter | 46.02 ₹1,12,472.88 Lowest | 531 ₹12,97,764 |
Tender Value
₹11.1 L
EMD Value
₹22,300
Closing Date
5 Apr 2024, 3:30 pmClosed
SE Works
O/o ACE PnW, IIIrd Floor Admin Building SSTPP
Work contract for painting of HT and LT transformers and all BUS Duct of Generator, Generator Transformers, Unit auxiliary transformer, Station transformers etc. of Unit#1,Ph-1, SSTPP, MPPGCL, Dongalia
2023_MPPGC_319448_2
WT-2187
Open Tender
Miscellaneous Works
Item Rate
365 days
O/o ACE PnW, IIIrd Floor Admin Building SSTPP
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,000
Yes
₹22,300
Yes
16 Oct 2025
1 Mar 2024
8 Apr 2024
1 Mar 2024
5 Apr 2024
1 Mar 2024
Work contract for painting of HT < transformers and all BUS Duct of Generator, Generator Transformers, Unit auxiliary transformer, Station transformers etc. of Unit#1,Ph-1, SSTPP, MPPGCL, Dongalia
Particular
Painting & nomenclature of Generator transformers including radiator GT 1R,1Y & 1B and spare GT Area Calculated Area of transformer = 98sqmeter Area of Cooler = 104sqmeter Area of conservator = 48sqmeter Area of MB ,connecting pipe etc = 140 Sqmeter Total area of transformer = 390 sqmeter No. of Generator transformer = 4 no. Total area to be painted = 390 x 4 =1560 sqmeter
Painting & nomenclature of Station transformer #1 including radiator Area Calculated Area of transformer = 103 sqmeter Area of Cooler with fins = 675 sqmeter (no. of fin =28 & no of set 16, area of 1 fin 1.5 sqm, total = 28x16x1.508 =675) Area of conservator = 30 sq meter Total area of transformer = 808 sqmeter
Painting & nomenclature of Unit transformer including radiator UAT 1A& 1B Area Calculated Area of transformer = 90sqmeter Area of Cooler with fins = 332 sqmeter (no. of fin =22 & no of set 10, area of 1 fin 1.508 sqm, total = 22x10x1.508 =332) Area of conservator = 24sqmeter Total area of transformer = 446 sqmeter No. of Unit transformer = 2 no. Total area to be painted = 446x2 =892 sqmeter
Painting & nomenclature of VFD oil type transformer ESP area Area Calculated Area of transformer = 52.52sqmeter Area of radiator with fin = 114 Sq mtr (no. of fin =22 & no of set 8, area of 1 fin 0.656 sqm, total = 22x8x0.65 =114) No. of oil type transformer = 4 no. Total area to be painted = 166.52x4 = 666 sq meter
Painting of Bus ducts of GT, Generator , UAT & Station of unit 1 • UAT 1A to 1CA Bus duct :- 4340 sqfeet • UAT 1B to 1CB Bus duct :- 4940 sqfeet • Station 1 to OBA Bus duct :- 4280 sqfeet • Station 1 to OCA & OCB Bus duct :- 5500 sqfeet • GT 1 to Generator #1(R,Y,B) Bus Duct :- 15725 sq feet • UT 1A to 1B bus duct :- 2400 sq feet Total Area Calculated to be painted= 37185 sq feet (approx) or 3455 sq mtr
Painting & nomenclature of ICT 1&2 including radiator Area Calculated Area of transformer = 187 sqmeter Area of Cooler with fins = 1013 sqmeter (no. of fin =24 & no of set 28, area of 1 fin 1.5 sqm, total = 24x28x1.508 =1013) Area of conservator = 22 sqmeter Total area of transformer = 1222 sqmeter No. of Unit transformer = 2 no. Total area to be painted = 1222x2 =2444 sqmeter
Siddhesh Electricals
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .